BuildingViolation.com

October 2026 NYC DOB / OATH Hearing — BIN 5801182

Staten Island property record with 3 OATH/ECB summons records in the supplied October 2026 hearing extract. Hearing date: October 21, 2026.

Need representation for this October hearing?

We can review the summons, agency record, correction status and available evidence; define the hearing strategy; prepare the authorized submission or appearance; and coordinate the underlying violation-resolution work separately where needed. Because hearing deadlines are fixed, substantive work begins after scope, authorization and payment.

Property / Hearing Identifiers

Primary hearing issue: Work Without a Permit

BoroughStaten Island
BIN5801182
Block / Lot07162 / 0001
October Records3
Official violation location: Loading from NYC OATH public records…
Address is resolved from the OATH Hearings Division Case Status record for OATH ticket 039558025M (source ECB number 39558025M). BIN and block/lot remain shown below for verification.

October 2026 Hearing Records

OATH/ECB #HearingSeverityHearing statusBalanceAlleged conditionCode / section
39558031Z
ACTIVE
October 21, 2026
10:30 AM
CLASS - 2 PENDING $1,250.00 DURING MY INSPECTION OF AN ACTIVE 1 STORY DM SITE, I REQUESTED THE SSM TO PROVIDE THE OPERATION SITE MEETING AS REQUIRED BY CCD1,HOWEVER, THIS DOCUMENT WAS NOT PROVIDED OR AVAILABLE.STOP ALL WORK UNDER PERMIT# 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
39558025M
ACTIVE
October 21, 2026
8:30 AM
CLASS - 1 PENDING $2,500.00 DURING INSPECTION ON ACTIVE DM JOB SITE IT WAS OBSERVED THAT THE OPENINGS WERE CUT BEFORE THE ROOF STRUCTURE WAS LOWERED TO ENCLOSE TANK AS CCD1.STOP ALL WORK ENTIRE SITE. 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
39558029J
ACTIVE
October 21, 2026
9:30 AM
CLASS - 2 PENDING $1,250.00 DURING THE INSPECTION , I OBSERVED THAT THE STORAGE AND VEHICLES AND CONSTRUCTION EQUIPMENT WERE NOT MARKED ON THE SITE SAFETY PLAN.REMOVE EQUIPMENT/STORAGE OR AMEND THE SSP. 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

What DOB is alleging at this property

This October hearing page is not just a schedule entry. The supplied DOB extract contains 3 summons records for this property identifier. The charge mix is: 2 Work Without a Permit summonses; Site Safety / Safeguarding. The hearing date is October 21, 2026; the source issue date(s) are August 17, 2026.

Important: The discussion below identifies correction paths, hearing issues and evidence worth investigating from the summons data. It does not state that a defense will succeed. OATH decides liability from the evidence and law presented in the case.

Site Safety / Safeguarding — Summons 39558031Z

CLASS - 2 · Issued August 17, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: DURING MY INSPECTION OF AN ACTIVE 1 STORY DM SITE, I REQUESTED THE SSM TO PROVIDE THE OPERATION SITE MEETING AS REQUIRED BY CCD1,HOWEVER, THIS DOCUMENT WAS NOT PROVIDED OR AVAILABLE.STOP ALL WORK UNDER PERMIT#

Cited provision(s): 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

How this type of condition is typically resolved

These charges focus on protection of workers, occupants, neighboring property or the public during construction. Correction normally requires fixing the specific unsafe condition, documenting required safety measures and keeping the required site records current.

Hearing issues to verify

  • What precise safety measure does the summons say was missing or inadequate?
  • Was the condition temporary and corrected before or during the inspection?
  • Did an approved site-safety plan or required site document address the cited condition?

Evidence that may matter

  • Site Safety Plan / logistics drawings
  • Daily safety logs and competent-person/site-safety records
  • Photographs taken around the inspection time
  • Contractor or safety-manager statements and correction records

Work Without a Permit — Summons 39558025M

CLASS - 1 · Issued August 17, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: DURING INSPECTION ON ACTIVE DM JOB SITE IT WAS OBSERVED THAT THE OPENINGS WERE CUT BEFORE THE ROOF STRUCTURE WAS LOWERED TO ENCLOSE TANK AS CCD1.STOP ALL WORK ENTIRE SITE.

Cited provision(s): 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Work Without a Permit — Summons 39558029J

CLASS - 2 · Issued August 17, 2026; hearing October 21, 2026. · Hearing status: PENDING

DOB allegation in the source extract: DURING THE INSPECTION , I OBSERVED THAT THE STORAGE AND VEHICLES AND CONSTRUCTION EQUIPMENT WERE NOT MARKED ON THE SITE SAFETY PLAN.REMOVE EQUIPMENT/STORAGE OR AMEND THE SSP.

Cited provision(s): 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

How this type of condition is typically resolved

The correction path usually starts by determining whether the observed work required a permit and whether the condition can legally remain. If it can remain, legalization may require plans, a filing, permit, inspections and closeout; if it cannot or the owner does not want to legalize it, restoration to a lawful condition may be required.

Hearing issues to verify

  • Did a valid permit already cover the exact work described by the inspector on the issue date?
  • Was the cited activity actually permit-required work, or was it maintenance / exempt work under the applicable facts?
  • Do the approved drawings, permit scope and inspection history match the condition the inspector described?
  • If a Stop Work Order was issued, was the work stopped and was any later work performed only after the required authorization?

Evidence that may matter

  • Permit and DOB NOW/BIS job records that predate the inspection
  • Approved plans and amendments showing the cited work
  • Dated photographs of the condition and construction stage
  • Contracts, invoices and contractor statements establishing what work was actually performed
  • Inspection / sign-off records if the work was subsequently legalized

Case-specific next step

For this property, the first paid review should reconcile the 3 October summons records against the current OATH/DOB record, identify which alleged conditions remain open, and separate the hearing defense from the DOB correction / certification work. That prevents paying for correction work that does not address the actual charge—or appearing at OATH without the documents needed for the cited condition.

Submit These Summonses for Review

What to do before the hearing

1. Verify the summons

Confirm the scheduled date, respondent, violation location, charges and current OATH status.

2. Preserve evidence

Gather permits, photographs, contracts, inspection records, professional letters and proof of correction that actually relate to the cited condition.

3. Separate hearing from correction

A hearing result and physical/agency correction are not always the same task. Plan both tracks where required.

Official Hearing Record

Verify the current hearing status and violation location in the NYC OATH Hearings Division Case Status data before relying on any public directory.

NYC OATH Case Status Data →

OATH evidence and DOB correction records

OATH advises respondents to bring or submit the evidence needed to prove their case, including legal or official records, photographs, documents and witnesses. For a DOB Certificate of Correction, DOB may require supporting material such as photographs, receipts, permits and inspection results in addition to the required correction information and applicable civil-penalty documentation.