Examples under OATH infraction code 112
81 distinct enforcement-description examples carrying this infraction code. Check the actual summons before interpreting the code.
- Stop-work-order scope and continued activity · 39141071JSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. I OBSERVED A NEW THREE STORY BLOCK BUILDING ERECTED ON THE PREMISE
- Stop-work-order scope and continued activity · 39203323HSection 28-207.2.2 / OATH code 112 · OBSERVED ADDITIONAL WORK PERFORMED IN VIOLATION OF SWO ISSUED UNDER COMPLAINT 3A68283 AND POSTED ON 7/1/2026. WORK OBSERVED CONSIS
- Stop-work-order scope and continued activity · 39194591MSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ATOI, OBSERVED WORK HAS CONTINUED WHILE PARTIAL STOP WORK ORDER FO
- Stop-work-order scope and continued activity · 39158234XSection 28-207.2.2 / OATH code 112 · ECB ISSUED FOR UNLAWFULLY WORK WHILE UNDER NOTICE OF SWO. ATOI ACTIVE WORK OBSERVED @ EXPO.1, BERRY STREET SIDE OF BLDG ERECTING S
- Stop-work-order scope and continued activity · 39203438HSection 28-207.2.2 / OATH code 112 · ATOI, OBSERVED WORKERS ACTIVELY WORKING ON A NEWLY CONSTRUCTED STAIRWAY AND CUTTING WOOD AT THE PREMISES AGAINST TO STOP WORK ORDE
- Stop-work-order scope and continued activity · 39203401YSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION OBSERVED ONGOING WORK IN THE REAR SIDE YARD
- Stop-work-order scope and continued activity · 39559000KSection 28-207.2.2 / OATH code 112 · WHILE PERFORMING A RE-INSPECTION. I COMPARED THE PREVIOUS PICTURES TAKEN ON 05/29/2026 WITH THE CURRENT SITE CONDITION AND FOUND T
- Stop-work-order scope and continued activity · 39203672XSection 28-207.2.2 / OATH code 112 · UNLAWFUL CONTINUANCE OF WORK WHILE ON NOTICE OF A STOP WORK ORDER ISSUED ON 8/12/2026 VIO #039200329P. ATOI OBSERVED CONSTRUCTION
- Stop-work-order scope and continued activity · 39203662MSection 28-207.2.2 / OATH code 112 · ECB VIOLATION ISSUED FOR UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ATOI OBSERVED WORK AGAINST THE SWO ISSUED
- Stop-work-order scope and continued activity · 39196192YSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. FULL STOP WORK ORDER WAS ISSUED ON 10/04/22. #3876577 .AT TIME OF
- Stop-work-order scope and continued activity · 39203853PSection 28-207.2.2 / OATH code 112 · UNLAWFUL CONTINUATION OF WORK WHILE UNDER A STOP WORK ORDER. AT THE TIME OF INSPECTION, BUILDING FULLY DEMOLISHED AND SIGNED OFF 9
- Scaffold platform and fall protection · 39559059PSection 28-207.2.2 / OATH code 112 · ATOI OBSERVED BUILDING AT 6TH FLOOR ROOF LEVEL WITH SUPPORTED SCAFFOLDING SYSTEMS AT EXP 1 & 4 UPON RESEARCH OF DEPARTMENTAL RECOR
- Stop-work-order scope and continued activity · 39203836NSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE UNDER A PARTIAL STOP WORK ORDER. AT TIME OF INSPECTION OBSERVED A 6-FOOT CMU WALL ERECTED AT EXPOS
- Stop-work-order scope and continued activity · 39204146KSection 28-207.2.2 / OATH code 112 · NOTED: VIOLATION ISSUED FOR UNLAWFUL CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER: ATOI OBSERVED AT EXPO # 2 WORKER INSTALL
- Stop-work-order scope and continued activity · 39145312JSection 28-207.2.2 / OATH code 112 · ATOI OF A 4-STORY BUILDING IT WAS OBSERVED THAT THE SITE WAS UNDER A PARTIAL STOP WORK ORDER, SINCE-05/06/2024.BY BADGE: #3090- VI
- Stop-work-order scope and continued activity · 39204288XSection 28-207.2.2 / OATH code 112 · NOTED: VIOLATION ISSUED FOR UNLAWFUL CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER: ATOI OBSERVED WORKERS INSIDE PROPERTY DI
- Stop-work-order scope and continued activity · 39559185XSection 28-207.2.2 / OATH code 112 · @ACTIVE SITE IN 2ND FL STRUCTURE PHASE OBSERVE STREETS WORK&STORAGE ZONE IN USE W/ ADDITIONAL KNUCKLE BOOM TRUCK IN USE TO DELIVER
- Scaffold platform and fall protection · 39195208PSection 28-207.2.2 / OATH code 112 · AT TIME OF INSPECTION, A DECK IN THE REAR YARD WAS OBSERVED TO BE FULLY COMPLETED, WITH LIGHTS, OUTLETS, PLUMBING AND SUPPORTING C
- Stop-work-order scope and continued activity · 39204305ZSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ATOI OBSERVED WORK WAS 100% COMPLETED WITH STOP WORK ORDER #396018
- Stop-work-order scope and continued activity · 39204754YSection 28-207.2.2 / OATH code 112 · ON ARRIVAL AT EXPOSURE # 1, WORKERS ARE CONDUCTING CONCRETE PUMPING, AND TRANSFERRING CEMENT THROUGH STEEL PIPE INTO REAR YARD, WH
- Stop-work-order scope and continued activity · 39204128RSection 28-207.2.2 / OATH code 112 · NOTED: VIOLATION ISSUED FOR UNLAWFUL CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER: ATOI OBSERVED IN THE RESIDENTS GARAGE WO
- Stop-work-order scope and continued activity · 39204612ZSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUE TO WORK WHILE ON NOTICE OF A STOP WORK ORDER: AT THE TIME OF INSPECTION, OBSERVED 2 WORKERS ON BOOM LIFT WEATH
- Stop-work-order scope and continued activity · 39532096YSection 28-207.2.2 / OATH code 112 · OBSERVED BUILDING UNDER SWO FOR EXTERIOR AND INTERIOR WORK COMPLAINT#3923777 FOR RENOVATION/ENLARGEMENT WITHOUT A PERMIT. UPON REV
- Stop-work-order scope and continued activity · 39204536XSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER ISSUED 4/23/25. OBSERVED THE REMOVAL OF GREEN PANEL FENCE, COMPLETI
- Stop-work-order scope and continued activity · 39204392XSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER ISSUED 12/26/25, EXTENSION AT REAR WAS STOPPED FOR HAVING NO PERMIT
- Stop-work-order scope and continued activity · 39204104MSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. NOTED: SWO IN EFFECT ISSUED ON 3/23/26, VIO # 39182052P STATES THA
- Stop-work-order scope and continued activity · 39196459YSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION OBSERVED AT EXPO.2 AND 3 ILLEGAL VERTICAL/HO
- Stop-work-order scope and continued activity · 39196296ZSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER ISSUED 08/18/2023 A.T.O.I OBSVD A LEGAL 2 STORY BUILDING UNPERMITTE
- Stop-work-order scope and continued activity · 35729470ZSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF STOP WORK ORDER ISSUED ON07/11/2015 WITH ECB VIOLATION #35138771H. WORK NOTED: AT APA
- Stop-work-order scope and continued activity · 39202837KSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. OBSERVED 100% COMPLETED 2ND FLOOR ADDITION WITH WINDOWS AND DOOR E
- Stop-work-order scope and continued activity · 35718306NSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INPSECTION, WORK WAS OBSERVED ON AN ACTIVE CONSTRUCTION
- Stop-work-order scope and continued activity · 39197543LSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A SWO. OBSERVED SWO # 39113527K ISSUED ON 05/06/2024 FOR EXTERIOR WORK IN PROGRESS AT
- Scaffold platform and fall protection · 39180204XSection 28-207.2.2 / OATH code 112 · ATOI NEW CONSTRUCTION WAS OBSERVED IN THE CELLAR LEVEL OF PROPERTY. NEW PARTITION WALLS ERECTED ENCLOSING PREVIOUSLY VISIBLE ELECT
- Stop-work-order scope and continued activity · 39151577XSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON A NOTICE OF A STOP WORK ORDER. 2 STORY BUILDING AT THE ROOF LEVEL, EXISTING FRONT SKYLIGHTS REM
- Stop-work-order scope and continued activity · 39189824HSection 28-207.2.2 / OATH code 112 · NOTED: VIOLATION ISSUED FOR UNLAWFUL CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER: ATOI OBSERVED NEWLY POURED CONCRETE AT E
- Stop-work-order scope and continued activity · 39121788ZSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION, OBSERVED ONGOING CONSTRUCTION OPERATION INS
- Stop-work-order scope and continued activity · 39174385NSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT 1ST FLOOR INTERIOR APARTMENT 2 ILLEGAL WORK CONTINUED AFTER SWO
- Stop-work-order scope and continued activity · 39198469RSection 28-207.2.2 / OATH code 112 · ATOI OBSERVED CONSTRUCTION WORK TAKING PLACE WHILE AN ACTIVE STOP WORK ORDER WAS IN EFFECT. WORK WAS IN PROGRESS IN THE UNPERMITTE
- Stop-work-order scope and continued activity · 39138896RSection 28-207.2.2 / OATH code 112 · ATOI, 3 MALE WORKERS AT PREMISES, INSTALLING SUSPENDED CEILING AND ELECTRICAL WIRING CONTRARY TO FSWOS 1232321 AND 1232707 ISSUED
- Stop-work-order scope and continued activity · 39125991MSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. PSWO UNDER COMPLAINT#4969261 WAS ISSUED ON 08/15/24, FOR ALL EXTER
- Stop-work-order scope and continued activity · 39188821HSection 28-207.2.2 / OATH code 112 · OBSERVED AT EXP 1 STRUCTURAL STEEL BEING INSTALLED. CHAIN FALL IN PLACE MOUNTED TO AN ADDTIONAL BEAM. WOOD TIMBER RIDGE BEAM BEING
- Stop-work-order scope and continued activity · 39125993XSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. FULL STOP WORK ORDER FOR GARAGE WAS ISSUED ON 08/15/2024 UNDER COM
- Stop-work-order scope and continued activity · 39157893PSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER AS PER FULL STOP WORK ORDER ISSUED ON 05/30/2024 AND DOB VIO. # 24-
- Stop-work-order scope and continued activity · 39174694RSection 28-207.2.2 / OATH code 112 · NOTED: VIOLATION ISSUED FOR UNLAWFUL CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER: ATOI OBSERVED WORKERS WORKING ON THE INT
- Stop-work-order scope and continued activity · 39174756NSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER .AT TIME OF INSPECTION OBSERVED WORK TO BE 100% COMPLETED. STORE OP
- Stop-work-order scope and continued activity · 39191117LSection 28-207.2.2 / OATH code 112 · OBSERVED 3 MEN ACTIVELY WORKING ON STRUCTURE AT REAR OF PROPERTY. WOOD FRAME. AGAINST STOP WORK ORDER ISSUED ON 05/30/2025 COMPLAI
- Scaffold platform and fall protection · 39190876HSection 28-207.2.2 / OATH code 112 · VIOLATION ISSUED ON 02/10/26 FOR COMPLAINT #4A24805, STATES THAT WORK 75% COMPLETE; HOWEVER, ATOI WORK APPEARS TO BE 100% COMPLETE
- Stop-work-order scope and continued activity · 39200517MSection 28-207.2.2 / OATH code 112 · A PSWO FOR ILLEGAL EXCAVATION IN THE REAR YARD WAS ISSUED ON 08-12-2026 ATI I OBSERVED 1 MAN OPERATING THE EXCAVATION MACHINE IN T
- Stop-work-order scope and continued activity · 39539604NSection 28-207.2.2 / OATH code 112 · @FULL DEMO SITE UNDER FULL STOP WORK ORDER DUE TO INCIDENT OCCURRED OF BUILDING COLLAPSE ONTO SIDEWALK&STREET OBSERVE REMAINING BU
- Scaffold platform and fall protection · 39184913RSection 28-207.2.2 / OATH code 112 · ATOI OBSERVED SEVERAL WORKERS AT GROUND FLOOR COMMERCIAL SPACE FINISHING SHEETROCK AND CUTTING CERAMIC TILES. PSWO WAS ISSUED ON 3
- Stop-work-order scope and continued activity · 39156863JSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. FULL STOP WORK ORDER ISSUED 4/9/25 UNDER COMPLAINT # 3A09376. UNLA
- Stop-work-order scope and continued activity · 39176171RSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. PREMISES WERE ISSUED WITH A FULL STOP WORK ORDER ON 06/16/2022. OB
- Stop-work-order scope and continued activity · 39119816YSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER ISSUED ON 03/20/2024 & WITH ECB VIOLATION #: 39109357P & ECB VIOLAT
- Stop-work-order scope and continued activity · 39172112ZSection 28-207.2.2 / OATH code 112 · NOTED: VIOLATION ISSUED FOR UNLAWFUL CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER: ATOI OBSERVED WORKERS WORKING ON THE INT
- Stop-work-order scope and continued activity · 39152992HSection 28-207.2.2 / OATH code 112 · ATOI OBSERVED ONGOING WORK AGAINST THE POSTED STOP WORK ORDER. MEN INSIDE WORKING, OBSERVED ADDITIONAL WORKER GOING IN WITH TOOLS.
- Stop-work-order scope and continued activity · 39152085YSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON A NOTICE OF A STOP WORK ORDER, ROOF INSPECTION DATED 6/20/2025 ROOF WORK WAS APPROX. 75% COMPLE
- Stop-work-order scope and continued activity · 39543884ZSection 28-207.2.2 / OATH code 112 · AT TIME OF INSPECTION, OBSERVED WORK BEING PERFORMED AGAINST THE STOP WORK ORDER ISSUED ON 6/20/25. PREVIOUSLY THE WORK INVOLVED E
- Stop-work-order scope and continued activity · 39201405MSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION OBSERVED AT FRONT STEPS HAVE INSTALLED HANDR
- Stop-work-order scope and continued activity · 39176732HSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUE WORK WHILE ON NOTICE OF STOP WORK ORDER. OBSERVED ALL LOAD BEARING WALLING IN BASEMENT LEVEL ARE REMOVED AS IN
- Stop-work-order scope and continued activity · 39186167NSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ATOI, OBSERVED WORK HAS CONTINUED WHILE PARTIAL STOP WORK ORDER FO
- Stop-work-order scope and continued activity · 39550199XSection 28-207.2.2 / OATH code 112 · ATOI, I OBSERVED THAT WORK WAS CONTINUED WHILE NOTICE OF SWO COMP. #4A14157 EXISTED ON THIS PROPERTY SINCE 10/17/2025, INDICATING
- Stop-work-order scope and continued activity · 39201700PSection 28-207.2.2 / OATH code 112 · ATOI OBSERVED 1 WORKER INSTALLING ELECTRICAL LINES FOR METERS @ EXPO 2. ALSO OBSERVED A NEW WOODEN STRUCTURE @EXPO 3. EXTENSION @
- Stop-work-order scope and continued activity · 39201849NSection 28-207.2.2 / OATH code 112 · AT TIME OF INSPECTION OBSERVED TWO MALE WORKERS WORKING ON ROOF EXTENSION. ACTIVE STOP WORK ORDER WAS ISSUED ON 8/19/2026., COMPLY
- Stop-work-order scope and continued activity · 39201823PSection 28-207.2.2 / OATH code 112 · ATOI OBSERVED CONTINUOUS WORK WHILE ON A SWO. HORIZONTAL/VERTICAL ENLARGEMENT ON ROOF. WORK IS APPROX 90% COMPLETE. COMP # 3A07835
- Stop-work-order scope and continued activity · 39202206YSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ATIO FOR VIO#39156290L OBSERVED AT ROOF LEVEL WORK HAS CONTINUED ,
- Stop-work-order scope and continued activity · 39202170LSection 28-207.2.2 / OATH code 112 · SWO PARTIALLY RESCINDED ON 06/08/26, ALLOWING NON-STRUCTURAL INTERIOR WORK ONLY. ATOI OBSERVED ONGOING EXTERIOR STRUCTURAL WORK, I
- Stop-work-order scope and continued activity · 39176968YSection 28-207.2.2 / OATH code 112 · ATOI OBSERVED CONTINUED MECHANICAL WORK WHILE ON A STOP WORK ORDER UNDER COMPLAINT #1716529 ECB VIO ISSUED #039176777L. WORK TAKIN
- Scaffold platform and fall protection · 39202116KSection 28-207.2.2 / OATH code 112 · ATOI GAINED ACCESS INSIDE THE PROPERTY, SPOKE WITH THE PROJECT MANAGER, DID THE WALKTHROUGH. 2 MEN WORKING AT THE 2ND FLOOR OF PRO
- Stop-work-order scope and continued activity · 39558432JSection 28-207.2.2 / OATH code 112 · AT THE TIME OF INSPECTION, IT WAS OBSERVED THAT THE CONTRACTOR WAS PERFORMING WORK IN VIOLATION OF A STOP WORK ORDER (SWO) ISSUED
- Scaffold platform and fall protection · 39558494PSection 28-207.2.2 / OATH code 112 · AT THE TIME OF INSPECTION, PSWO #2447119 WAS ISSUED ON 8/4/2026 DIRECTING ALL WORK TO STOP DUE TO NO EARTHWORK NOTIFICATIONS, PRE-
- Stop-work-order scope and continued activity · 35693949ZSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF STOP WORK ORDER. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE 19 STORY NEW BUILDING C
- Stop-work-order scope and continued activity · 35728381MSection 28-207.2.2 / OATH code 112 · UNLAWFUULY CONTINUED WORK WHILE ON NOTICE OR STOP WORK ORDER. ATOI OBSERVED CONSTRUCTION WORK IN PROGRESS ON ADDITION TO ROOF. WOR
- Stop-work-order scope and continued activity · 39202072HSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. ATOI,OBSERVED ACTIVE CONSTRUCTION ACTIVITIES WHILE PROPERTY UNDER
- Stop-work-order scope and continued activity · 39202023LSection 28-207.2.2 / OATH code 112 · AT TIME OF INSPECTION OBSERVED SEVERAL PUMP JACK SCAFFOLDING INSTALLED ON TOP OF ROOF AT EXPOSURE 1, USING STANDARD LADDERS AS PLA
- Scaffold platform and fall protection · 39202515HSection 28-207.2.2 / OATH code 112 · ATOI OBSERVED WORKER USING CUTTING BRICKS TO CONTINUE CONSTRUCTION OF NEW MAIN ENTRY STAIRCASE, VIOLATING PSWO EXISTING ON PROPERT
- Scaffold platform and fall protection · 39202703PSection 28-207.2.2 / OATH code 112 · OBSERVED ACTIVE CONSTRUCTION WORK IN PROGRESS WITH 3 WORKERS ON SITE EXCAVATING A PIT APPROX. 7FT IN DEPTH AT REAR RETAINING WALL
- Stop-work-order scope and continued activity · 39186347KSection 28-207.2.2 / OATH code 112 · A COMPARISON BETWEEN THE SITE PHOTOS AND THE STOP WORK ORDER SUGGESTS THAT WORK COUNITUINE WHILE ON STOP WORK NOTICE CONDITIONS CH
- Stop-work-order scope and continued activity · 39202944XSection 28-207.2.2 / OATH code 112 · OBSERVED ADDITIONAL ELECTRICAL WORK DONE AGAINST POSTED STOP WORK ORDER. EXP 1 AND 2 PREVIOUSLY ONLY HAD BX CABLE PROTRUDING FROM
- Scaffold platform and fall protection · 39202995XSection 28-207.2.2 / OATH code 112 · ATOI NEW CONSTRUCTION WAS OBSERVED THROUGH THE ENTIRE PROPERTY, CONSISTING OF NEW PARTITION WALLS ON THE 1ST-3RD FLOORS, NEW ELECT
- Stop-work-order scope and continued activity · 35690651MSection 28-207.2.2 / OATH code 112 · UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER NOTED:ECB#34754101L HAS BEEN DISOBEYED AND HAS COMPLETELY FINISHED