Cases associated with NYC DOB 1 RCNY 3319-01(C)(5)
3 distinct descriptions associated with this law label in the October 2026 enforcement extract. These are source allegations with educational draft analyses, not verified outcomes.
- Crane notification and operations · 39178284MSection 1 RCNY 3319-01(C)(5) / OATH code 2J9 · CRANE USER MONCON INC ,THE USER OF MOBILE CRANE CD4409 CN57725,FAILED TO NOTIFY THE DEPARTMENT PROPERLY,NO NOTIFICATION WAS IN THE
- Crane notification and operations · 39196165ZSection 1 RCNY 3319-01(C)(5) / OATH code 2J9 · MOBILE CRANE, CD-5139, CN-888/25 WAS ON SITE THE CRANE USER FAILED TO NOTIFY THE DEPARTMENT OF THE CRANE'S ARRIVAL TO SITE. THE EQ
- Scaffold platform and fall protection · 39558758JSection 1 RCNY 3319-01(C)(5) / OATH code 2J9 · AT TIME OF INSPECTION OBSERVED 5 SUSPENDED SCAFFOLDS SETUPS AT EXP. 1 AND 3, 4 OF THEM ACTIVE. AS PER DOB RECORDS LAST NOTIFICATIO
Page 1 of 1