Cases associated with NYC DOB BC 3301.7 (2014 CODE)
84 distinct descriptions associated with this law label in the October 2026 enforcement extract. These are source allegations with educational draft analyses, not verified outcomes.
- Sidewalk shed and public protection · 39558781HSection BC 3301.7 (2014 CODE) / OATH code 2F7 · DURING INSPECTION OF THE 17-STORY ALTERATION FACADE, OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 1 & 4, EXPOSURE 4 NOT EXTENDED 2
- Sidewalk shed and public protection · 39558762MSection BC 3301.7 (2014 CODE) / OATH code 2F7 · 54 STORY FACADE ALTERATION ACTIVE SITE. OBSERVED SIDEWALK SHED IN PLACE AT EXP#2,4 PERMIT#M10448743. UPON REQUEST FOR DOCUMENTS SI
- Construction site safety and protection · 39558769PSection BC 3301.7 (2014 CODE) / OATH code 2F7 · AT TIME OF INSPECTION SITE WAS OBSERVED UTILIZING A COLD FORM STEEL (CFS) SYSTEM. THE REQUIRED SPECIAL INSPECTION REPORT FOR THE U
- Construction site safety and protection · 39558665KSection BC 3301.7 (2014 CODE) / OATH code 2F7 · AT THE TIME OF INSPECTION, CONSTRUCTION ACTIVITY WAS OBSERVED AT THE PREMISES. TWO WORKERS WERE PRESENT PERFORMING HVAC WORK. UPON
← Previous Page 2 of 2