Skip to content
Violation library › Case analysis › 28-105.12.2
Inspector-description analysis · guided walkthrough

Means of egress and exit protection: NYC DOB 28-105.12.2 / OATH summons 39558970R

Original enforcement allegation, not a proven case outcome. The quotation below is from an inspector-written description in a public-record dataset. Extracts may end mid-sentence. The inspection origin, complete supporting evidence, legal finding, and disposition have not been independently verified. Interpretive explanations below are explicitly analytical possibilities.
Law citation: 28-105.12.2OATH infraction: 182Summons: 39558970R

Original inspector allegation — verbatim available export

UPON INSPECTION OF A ACTIVE 4 STORY NB AND AFTER REVIEW OF THE SITE SAFETY LOGISTICS PLAN A SAFE MEANS OF EGRESS SHOULD BE PROVIDED AT ALL TIMES. EMERGENCY SERVICES HAVE NO WAY TO ENTER THE SITE SAFELY AND WORK

Source limit: Source reference: NYC OATH/DOB summons 39558970R; BIN 3430352; export issue date 09/09/2026. The earlier export status was ACTIVE; obtain current status from DOB or OATH. The CSV contains a respondent mailing address, which is not presumed to identify the inspected property. This is the entire description available in the supplied export, not a certified full summons, inspector notes or evidentiary exhibits. The description is at the export’s approximately 210-character field limit and may terminate mid-word or mid-sentence.

Get the complete, authentic notice: search summons 39558970R in OATH Summons Finder instructions (download actual summons) and download the actual summons; review DOB records in NYC DOB records search. Never substitute the editorial discussion below for the inspector’s words.

Charge classification: law controls; keywords do not

Recorded citation: 28-105.12.2; recorded infraction: 182. Primary legal issue: departure from approved construction documents. Interpretive issue: Work must conform to approved documents. This citation concerns deviation from approved construction documents or amendments, a distinct issue from never having applied for a permit.

What must be tested: Obtain the approved stamped plan set and filed amendments; mark each observed departure on an overlay and determine whether field correction, approved amendment or separate filing is required.

Possible exceptions and legal limitations: Not every field difference proves a material violation; confirm the approved revision, permitted scope, as-built condition and applicable administrative process. Eligibility is not established merely because the excerpt uses a word such as “repair”, “permit”, “cellar”, or “occupied”. Refer to NYC DOB construction codes.

Specific conditions mentioned in this inspector wording

1. Means of egress and exit protection

Investigative test: Trace the occupant route from the cited point to discharge; check door swing, clear width, obstruction, illumination and the approved layout.

Evidence matched to this issue: Approved egress plan, location-labeled photos and measured clearance, fire/exit inspection records, dated removal or hardware repair evidence.

Boundary / potential counterexample: Do not advise blocking an occupied egress route as a temporary fix; applicability may differ for old and altered buildings.

Inspector wording mapped to testable facts

Passage 1 — UPON INSPECTION OF A ACTIVE 4 STORY NB AND AFTER REVIEW OF THE SITE SAFETY LOGISTICS PLAN A SAFE MEANS OF EGRESS SHOULD BE PR…

This recorded passage identifies a question about means of egress and exit protection, not a proven final determination. Trace the occupant route from the cited point to discharge; check door swing, clear width, obstruction, illumination and the approved layout. Do not advise blocking an occupied egress route as a temporary fix; applicability may differ for old and altered buildings.

Passage 2 — EMERGENCY SERVICES HAVE NO WAY TO ENTER THE SITE SAFELY AND WORK

The negative/deficiency wording is an inspector allegation about a missing, failed or unsafe condition. Determine precisely which component, obligation and time period the asserted absence covers. The supporting documents must establish or rebut the condition on the offense date, not merely its condition today.

Identifiers, locations, measurements and chronology to verify

No uniquely parseable earlier summons number, permit number, date, exposure or measurement is established by this excerpt. The full notice and building profile should supply the missing keys; do not invent them.

Case-specific correction decision tree

Branch A — physical or documentary defect persists: evaluate risk and the controlling technical text, then select correction. Branch B — it was already compliant on the cited date: marshal contemporaneous approved records and site evidence. Branch C — scope, code edition or identification is wrong: prepare a fact-by-fact comparison to the actual summons and cited regulation before advancing a defense or revised filing.

First targeted evidence collection: Approved egress plan, location-labeled photos and measured clearance, fire/exit inspection records, dated removal or hardware repair evidence. This is an investigative request, not a claim that the work or evidence already exists.

Editorial closure of the shortened allegation — NOT source text

Verbatim excerpt ends: “ EGRESS SHOULD BE PROVIDED AT ALL TIMES. EMERGENCY SERVICES HAVE NO WAY TO ENTER THE SITE SAFELY AND WORK”. Non-source editorial completion (conditional reconstruction, not a quotation): “The allegation appears to concern means of egress and exit protection; whether additional observations, directions, dates, measurements or exceptions followed is unknown and must be checked in the original summons.”

No missing words, dates, measurements, liability conclusion or regulatory remedy have been invented. Even if the final syllable looks obvious, completing it as a purported inspector quotation would misstate an official record.

Response, certification and closing evidence

A hearing defense, correction of the underlying condition, a DOB AEU Certificate of Correction and payment of an imposed penalty are distinct questions. Retrieve the summons and confirm the OATH hearing or outcome and DOB violation status. Under current DOB guidance, Certificate of Correction review requests are made in DOB NOW: Safety → Violations & Notices of Deficiency; submitter/certifier signatures and evidence requirements are case-specific. Refer to Certificate of Correction instructions.

Source record limitations: The dataset does not authenticate who inspected the property, why inspection started, whether a defense succeeded, which contractor made repairs or whether AEU later accepted a correction. Do not turn this example into a claimed client success story or an invented inspection history.

Primary authority and fact-check links

Related library and official records

Official sources: Search DOB records · DOB summonses · Certificate of Correction FAQs · OATH hearing options · Construction codes

Need a resolution plan tied to the full summons?

Building Violation LLC can review the violation wording, permits, drawings, correction evidence and available OATH hearing procedures. A web example is not a determination of compliance for any property.

Call (866) 545-4440