Permit validity timeline: NYC DOB BC 3301.7 (2014 CODE) / OATH summons 39202595R
Original inspector allegation — verbatim available export
PERMITTED SITE UNDER PERMIT NUMBER Q 01 241455-I1 EXPIRES: 10/17/2026. NO DOB APPROVED PLANS PROVIDED AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS
Source limit: Source reference: NYC OATH/DOB summons 39202595R; BIN 4177301; export issue date 09/01/2026. The earlier export status was ACTIVE; obtain current status from DOB or OATH. The CSV contains a respondent mailing address, which is not presumed to identify the inspected property. This is the entire description available in the supplied export, not a certified full summons, inspector notes or evidentiary exhibits. The export field may still omit pages, attachments or context contained in the actual summons.
Get the complete, authentic notice: search summons 39202595R in OATH Summons Finder instructions (download actual summons) and download the actual summons; review DOB records in NYC DOB records search. Never substitute the editorial discussion below for the inspector’s words.
Charge classification: law controls; keywords do not
Recorded citation: BC 3301.7 (2014 CODE); recorded infraction: 2F7. Primary legal issue: construction site safety and protection. Interpretive issue: Building Code provision, edition-specific. The cited Building Code provision is a technical construction/safety rule. The abbreviated dataset label does not supply the full legal elements.
What must be tested: Retrieve the actual section in the applicable code edition, scope of work and any cross-referenced administrative/technical requirements before selecting an approach.
Possible exceptions and legal limitations: Exceptions and thresholds are section-specific; no permit or repair exemption is presumed merely from this reference. Eligibility is not established merely because the excerpt uses a word such as “repair”, “permit”, “cellar”, or “occupied”. Refer to NYC DOB construction codes.
Specific conditions mentioned in this inspector wording
1. Permit validity timeline
Investigative test: Compare the alleged work time with actual issuance, expiry and renewal records; identify which specific activity occurred after expiration.
Evidence matched to this issue: Full permit history, renewal record, contractor daily logs, dated inspection photographs and closeout entries.
Boundary / potential counterexample: Distinguish work after expiry from the mere appearance of an expired document in a database.
Inspector wording mapped to testable facts
Passage 1 — PERMITTED SITE UNDER PERMIT NUMBER Q 01 241455-I1 EXPIRES: 10/17/2026.
This recorded passage identifies a question about permit validity timeline, not a proven final determination. Compare the alleged work time with actual issuance, expiry and renewal records; identify which specific activity occurred after expiration. Distinguish work after expiry from the mere appearance of an expired document in a database.
Passage 2 — NO DOB APPROVED PLANS PROVIDED AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUMENTS
The negative/deficiency wording is an inspector allegation about a missing, failed or unsafe condition. Determine precisely which component, obligation and time period the asserted absence covers. The supporting documents must establish or rebut the condition on the offense date, not merely its condition today.
Identifiers, locations, measurements and chronology to verify
- Cited calendar date: 10/17/2026
- Check whether this is a permit expiry, previous summons issuance, reinspection or compliance deadline; each has a different consequence.
- Device or control number: APPROVED
- Use the record number as a lookup key, then verify it corresponds to this physical device or location.
Case-specific correction decision tree
Branch A — physical or documentary defect persists: evaluate risk and the controlling technical text, then select correction. Branch B — it was already compliant on the cited date: marshal contemporaneous approved records and site evidence. Branch C — scope, code edition or identification is wrong: prepare a fact-by-fact comparison to the actual summons and cited regulation before advancing a defense or revised filing.
First targeted evidence collection: Full permit history, renewal record, contractor daily logs, dated inspection photographs and closeout entries. This is an investigative request, not a claim that the work or evidence already exists.
Editorial closure of the shortened allegation — NOT source text
The visible description does not show the same clear character-limit truncation flag, but additional pages or attachments may still exist. No editorial sentence is treated as part of the inspector’s wording.
Response, certification and closing evidence
A hearing defense, correction of the underlying condition, a DOB AEU Certificate of Correction and payment of an imposed penalty are distinct questions. Retrieve the summons and confirm the OATH hearing or outcome and DOB violation status. Under current DOB guidance, Certificate of Correction review requests are made in DOB NOW: Safety → Violations & Notices of Deficiency; submitter/certifier signatures and evidence requirements are case-specific. Refer to Certificate of Correction instructions.
Source record limitations: The dataset does not authenticate who inspected the property, why inspection started, whether a defense succeeded, which contractor made repairs or whether AEU later accepted a correction. Do not turn this example into a claimed client success story or an invented inspection history.
Primary authority and fact-check links
- OATH Summons Finder instructions (download actual summons) — enter summons 39202595R and obtain the signed notice.
- NYC DOB construction codes — verify law wording and any exception.
- BIS / DOB NOW record limitations — older BIS violations may not be in DOB NOW.
- Certificate of Correction instructions — review current COC procedure, signatures and evidence.
Related library and official records
Official sources: Search DOB records · DOB summonses · Certificate of Correction FAQs · OATH hearing options · Construction codes
Need a resolution plan tied to the full summons?
Building Violation LLC can review the violation wording, permits, drawings, correction evidence and available OATH hearing procedures. A web example is not a determination of compliance for any property.