Authorized use versus observed occupancy: NYC DOB 28-210.1 / OATH summons 35729530L
Original inspector allegation — verbatim available export
RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THANTHE LEGALLY APPROVED NUMBER OF NUMBER OF FAMILIES AUTHORIZED BY THE OFFICIAL DEPARTMENT RECORDS. NOTED AT TIME OF INSPECTION LABELED 102C HA
Source limit: Source reference: NYC OATH/DOB summons 35729530L; BIN 4065216; export issue date 08/26/2026. The earlier export status was ACTIVE; obtain current status from DOB or OATH. The CSV contains a respondent mailing address, which is not presumed to identify the inspected property. This is the entire description available in the supplied export, not a certified full summons, inspector notes or evidentiary exhibits. The description is at the export’s approximately 210-character field limit and may terminate mid-word or mid-sentence.
Get the complete, authentic notice: search summons 35729530L in OATH Summons Finder instructions (download actual summons) and download the actual summons; review DOB records in NYC DOB records search. Never substitute the editorial discussion below for the inspector’s words.
Charge classification: law controls; keywords do not
Recorded citation: 28-210.1; recorded infraction: 2K6. Primary legal issue: authorized occupancy or use. Interpretive issue: Unlawful occupancy or use. Article 210 concerns unlawful occupancy and occupancy restrictions. Precisely characterize the factual use alleged and cross-check the cited subsection.
What must be tested: Verify number of occupants/units, permanent versus transient use, the observed date, egress and legal-use records.
Possible exceptions and legal limitations: Do not infer a short-term-rental allegation merely from a residential unit: actual use, applicable date and statutory elements matter. Eligibility is not established merely because the excerpt uses a word such as “repair”, “permit”, “cellar”, or “occupied”. Refer to NYC DOB construction codes.
Specific conditions mentioned in this inspector wording
1. Authorized use versus observed occupancy
Investigative test: Identify each floor/unit and its claimed function and compare the C of O/authorized plan with actual use on the cited date.
Evidence matched to this issue: C of O and historical building records; dated layout/room photos, use documentation, rent/booking records only where genuinely relevant, and design-professional egress review.
Boundary / potential counterexample: Basement/cellar classification, legal dwelling status and transient-use rules are distinct determinations; do not conflate them.
Inspector wording mapped to testable facts
Passage 1 — RESIDENCE CONVERTED MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THANTHE LEGALLY APPROVED NUMBER OF NUMBER OF FAMILIES AUTHO…
This recorded passage identifies a question about authorized use versus observed occupancy, not a proven final determination. Identify each floor/unit and its claimed function and compare the C of O/authorized plan with actual use on the cited date. Basement/cellar classification, legal dwelling status and transient-use rules are distinct determinations; do not conflate them.
Passage 2 — NOTED AT TIME OF INSPECTION LABELED 102C HA
Treat this passage as an asserted observation or reference. Check the named location, actor, object and time against contemporaneous photos and official filing records before drawing a regulatory conclusion.
Identifiers, locations, measurements and chronology to verify
No uniquely parseable earlier summons number, permit number, date, exposure or measurement is established by this excerpt. The full notice and building profile should supply the missing keys; do not invent them.
Case-specific correction decision tree
Branch A — observed use conflicts with lawful records: evaluate cessation/restoration with safe occupant arrangements, or a design-professional assessment for lawful amendment. Branch B — older lawful use is asserted: retrieve historical C of O or records establishing preexisting authorization. Branch C — factual error: document the actual number of units, room functions, occupancy pattern and inspection date without making unverified statements about tenants.
First targeted evidence collection: C of O and historical building records; dated layout/room photos, use documentation, rent/booking records only where genuinely relevant, and design-professional egress review. This is an investigative request, not a claim that the work or evidence already exists.
Editorial closure of the shortened allegation — NOT source text
Verbatim excerpt ends: “ER OF FAMILIES AUTHORIZED BY THE OFFICIAL DEPARTMENT RECORDS. NOTED AT TIME OF INSPECTION LABELED 102C HA”. Non-source editorial completion (conditional reconstruction, not a quotation): “The allegation appears to concern authorized use versus observed occupancy; whether additional observations, directions, dates, measurements or exceptions followed is unknown and must be checked in the original summons.”
No missing words, dates, measurements, liability conclusion or regulatory remedy have been invented. Even if the final syllable looks obvious, completing it as a purported inspector quotation would misstate an official record.
Response, certification and closing evidence
A hearing defense, correction of the underlying condition, a DOB AEU Certificate of Correction and payment of an imposed penalty are distinct questions. Retrieve the summons and confirm the OATH hearing or outcome and DOB violation status. Under current DOB guidance, Certificate of Correction review requests are made in DOB NOW: Safety → Violations & Notices of Deficiency; submitter/certifier signatures and evidence requirements are case-specific. Refer to Certificate of Correction instructions.
Source record limitations: The dataset does not authenticate who inspected the property, why inspection started, whether a defense succeeded, which contractor made repairs or whether AEU later accepted a correction. Do not turn this example into a claimed client success story or an invented inspection history.
Primary authority and fact-check links
- OATH Summons Finder instructions (download actual summons) — enter summons 35729530L and obtain the signed notice.
- NYC DOB construction codes — verify law wording and any exception.
- BIS / DOB NOW record limitations — older BIS violations may not be in DOB NOW.
- Certificate of Correction instructions — review current COC procedure, signatures and evidence.
Related library and official records
Official sources: Search DOB records · DOB summonses · Certificate of Correction FAQs · OATH hearing options · Construction codes
Need a resolution plan tied to the full summons?
Building Violation LLC can review the violation wording, permits, drawings, correction evidence and available OATH hearing procedures. A web example is not a determination of compliance for any property.