Electrical installation and permit: NYC DOB 28-301.1 / OATH summons 39189400Y
Original inspector allegation — verbatim available export
OBSERVED OPEN GAS LINE BEHIND STOVE IN APT V1. PER FGC 406.6.2 ALL VALVES AND UNUSED OUTLETS ARE CLOSED AND PLUGGED., REPAIR AND/REPLACE
Source limit: Source reference: NYC OATH/DOB summons 39189400Y; BIN 2011572; export issue date 05/20/2026. The earlier export status was ACTIVE; obtain current status from DOB or OATH. The CSV contains a respondent mailing address, which is not presumed to identify the inspected property. This is the entire description available in the supplied export, not a certified full summons, inspector notes or evidentiary exhibits. The export field may still omit pages, attachments or context contained in the actual summons.
Get the complete, authentic notice: search summons 39189400Y in OATH Summons Finder instructions (download actual summons) and download the actual summons; review DOB records in NYC DOB records search. Never substitute the editorial discussion below for the inspector’s words.
Charge classification: law controls; keywords do not
Recorded citation: 28-301.1; recorded infraction: 102. Primary legal issue: safe building maintenance. Interpretive issue: Owner maintenance obligation. AC 28-301.1 requires buildings, equipment, safeguards and means of egress to be kept safe and maintained. The physical condition, rather than whether a particular permit exists, is normally the central question.
What must be tested: The applicable underlying technical standard and the actual defective component determine a lawful repair. An assertion that the building is generally safe does not rebut a specific defect.
Possible exceptions and legal limitations: An exemption from cyclical façade reporting does not exempt a building from general safe-maintenance duties. Determine whether the special rule actually applies. Eligibility is not established merely because the excerpt uses a word such as “repair”, “permit”, “cellar”, or “occupied”. Refer to NYC DOB construction codes.
Specific conditions mentioned in this inspector wording
1. Electrical installation and permit
Investigative test: Locate the exact wiring or equipment and determine whether the allegation is unsafe installation, unpermitted electrical work, posting, or inspection/permit status.
Evidence matched to this issue: Licensed-electrician site notes, panel/circuit identification, photos, electrical filing/permit history and test results when appropriate.
Boundary / potential counterexample: The evidence for a missing electrical work permit is not identical to proof of defective circuitry or missing display.
2. Gas equipment or fuel piping
Investigative test: Establish affected equipment and gas line route; check whether a licensed plumber and utility coordination are required and document safe isolation if indicated.
Evidence matched to this issue: Licensed-master-plumber assessment, approved gas work plans/permits, utility authorization, pressure/test reports and final inspection if applicable.
Boundary / potential counterexample: Do not recommend turning gas on or modifying piping based on a web excerpt; licensed trades and agency/utility procedures govern.
Inspector wording mapped to testable facts
Passage 1 — OBSERVED OPEN GAS LINE BEHIND STOVE IN APT V1.
This recorded passage identifies a question about gas equipment or fuel piping, not a proven final determination. Establish affected equipment and gas line route; check whether a licensed plumber and utility coordination are required and document safe isolation if indicated. Do not recommend turning gas on or modifying piping based on a web excerpt; licensed trades and agency/utility procedures govern.
Passage 2 — PER FGC 406.6.2 ALL VALVES AND UNUSED OUTLETS ARE CLOSED AND PLUGGED., REPAIR AND/REPLACE
This recorded passage identifies a question about electrical installation and permit, not a proven final determination. Locate the exact wiring or equipment and determine whether the allegation is unsafe installation, unpermitted electrical work, posting, or inspection/permit status. The evidence for a missing electrical work permit is not identical to proof of defective circuitry or missing display.
Identifiers, locations, measurements and chronology to verify
No uniquely parseable earlier summons number, permit number, date, exposure or measurement is established by this excerpt. The full notice and building profile should supply the missing keys; do not invent them.
Case-specific correction decision tree
Branch A — defect remains: assess risk and protection immediately, then undertake an appropriate licensed/engineered repair. Branch B — already repaired: pair before/after photos with scope, inspection and test results that address the *specific* defect. Branch C — inspector misidentified the component: use an elevation/floor key and technical field report; do not rely on an unspecific clean-inspection assertion.
First targeted evidence collection: Licensed-electrician site notes, panel/circuit identification, photos, electrical filing/permit history and test results when appropriate. This is an investigative request, not a claim that the work or evidence already exists.
Editorial closure of the shortened allegation — NOT source text
The visible description does not show the same clear character-limit truncation flag, but additional pages or attachments may still exist. No editorial sentence is treated as part of the inspector’s wording.
Response, certification and closing evidence
A hearing defense, correction of the underlying condition, a DOB AEU Certificate of Correction and payment of an imposed penalty are distinct questions. Retrieve the summons and confirm the OATH hearing or outcome and DOB violation status. Under current DOB guidance, Certificate of Correction review requests are made in DOB NOW: Safety → Violations & Notices of Deficiency; submitter/certifier signatures and evidence requirements are case-specific. Refer to Certificate of Correction instructions.
Source record limitations: The dataset does not authenticate who inspected the property, why inspection started, whether a defense succeeded, which contractor made repairs or whether AEU later accepted a correction. Do not turn this example into a claimed client success story or an invented inspection history.
Primary authority and fact-check links
- OATH Summons Finder instructions (download actual summons) — enter summons 39189400Y and obtain the signed notice.
- NYC DOB construction codes — verify law wording and any exception.
- BIS / DOB NOW record limitations — older BIS violations may not be in DOB NOW.
- Certificate of Correction instructions — review current COC procedure, signatures and evidence.
Related library and official records
Official sources: Search DOB records · DOB summonses · Certificate of Correction FAQs · OATH hearing options · Construction codes
Need a resolution plan tied to the full summons?
Building Violation LLC can review the violation wording, permits, drawings, correction evidence and available OATH hearing procedures. A web example is not a determination of compliance for any property.