Skip to content
Violation library › Case analysis › 28-105.1
Inspector-description analysis · guided walkthrough

Plumbing fixture and drainage configuration: NYC DOB 28-105.1 / OATH summons 39203254N

Original enforcement allegation, not a proven case outcome. The quotation below is from an inspector-written description in a public-record dataset. Extracts may end mid-sentence. The inspection origin, complete supporting evidence, legal finding, and disposition have not been independently verified. Interpretive explanations below are explicitly analytical possibilities.
Law citation: 28-105.1OATH infraction: 101Summons: 39203254N

Original inspector allegation — verbatim available export

ATOI, OBSERVE WWOP FOR PLUMBING WORK AT FIRST FLOOR, IT APPEARS THAT THEY REMOVED THE KITCHEN AND BATHROOM WORK APPEARS TO BE 30% COMPLETED, OBTAIN PERMIT

Source limit: Source reference: NYC OATH/DOB summons 39203254N; BIN 1057899; export issue date 09/08/2026. The earlier export status was ACTIVE; obtain current status from DOB or OATH. The CSV contains a respondent mailing address, which is not presumed to identify the inspected property. This is the entire description available in the supplied export, not a certified full summons, inspector notes or evidentiary exhibits. The export field may still omit pages, attachments or context contained in the actual summons.

Get the complete, authentic notice: search summons 39203254N in OATH Summons Finder instructions (download actual summons) and download the actual summons; review DOB records in NYC DOB records search. Never substitute the editorial discussion below for the inspector’s words.

Charge classification: law controls; keywords do not

Recorded citation: 28-105.1; recorded infraction: 101. Primary legal issue: authorization of regulated work. Interpretive issue: Work requiring a permit. AC 28-105.1 is the general permit requirement for regulated building work; it is not a blanket declaration that every minor repair requires a permit.

What must be tested: Check the work actually performed, its timing, trade, approved plans, and permit history; compare against the permit exemptions in AC 28-105.4, related rules, and separately regulated trades.

Possible exceptions and legal limitations: The ordinary-repair/minor-alteration and emergency-work exceptions are fact-specific. Even permit-exempt work must satisfy other applicable law and may require licensed work or other agency approvals. Eligibility is not established merely because the excerpt uses a word such as “repair”, “permit”, “cellar”, or “occupied”. Refer to DOB permit exemptions, owner alterations.

Specific conditions mentioned in this inspector wording

1. Plumbing fixture and drainage configuration

Investigative test: Map each named fixture/connection to the approved layout and check who installed it and whether the work requires plumbing filing or licensed trade.

Evidence matched to this issue: Fixture schedule, riser drawings, photos, licensed-plumber report, permit history and test/inspection or abandonment proof.

Boundary / potential counterexample: A sink or drain alone does not prove creation of a lawful dwelling unit or justify a particular permit type.

2. Structural and interior building component

Investigative test: Pin down floor, room and assembly; inspect dimensions, connections, condition and impact on fire separation or egress.

Evidence matched to this issue: Floor plan, measured photos, licensed design-professional report if structural, approved drawings and after-work inspection.

Boundary / potential counterexample: Structural work and cosmetic repair have different approval burdens; the inspector wording alone may not establish the distinction.

Inspector wording mapped to testable facts

Passage 1 — ATOI, OBSERVE WWOP FOR PLUMBING WORK AT FIRST FLOOR, IT APPEARS THAT THEY REMOVED THE KITCHEN AND BATHROOM WORK APPEARS TO BE…

This recorded passage identifies a question about plumbing fixture and drainage configuration, not a proven final determination. Map each named fixture/connection to the approved layout and check who installed it and whether the work requires plumbing filing or licensed trade. A sink or drain alone does not prove creation of a lawful dwelling unit or justify a particular permit type.

Identifiers, locations, measurements and chronology to verify

Identified floor: FIRST FLOOR
Tie inspection photographs to the stated level, approved floor plan, egress route, and actual room use.

Case-specific correction decision tree

Branch A — work required a permit and lacked one: stop any unauthorized work and evaluate a lawful filing/approved correction or removal, including penalties and inspections. Branch B — minor repair or other exemption is claimed: document work scope and the particular exemption in AC 28-105.4 and 1 RCNY 101-14. Branch C — permit existed: compare permit scope, issuance and work dates; a different permit does not automatically authorize the cited operation.

First targeted evidence collection: Fixture schedule, riser drawings, photos, licensed-plumber report, permit history and test/inspection or abandonment proof. This is an investigative request, not a claim that the work or evidence already exists.

Editorial closure of the shortened allegation — NOT source text

The visible description does not show the same clear character-limit truncation flag, but additional pages or attachments may still exist. No editorial sentence is treated as part of the inspector’s wording.

Response, certification and closing evidence

A hearing defense, correction of the underlying condition, a DOB AEU Certificate of Correction and payment of an imposed penalty are distinct questions. Retrieve the summons and confirm the OATH hearing or outcome and DOB violation status. Under current DOB guidance, Certificate of Correction review requests are made in DOB NOW: Safety → Violations & Notices of Deficiency; submitter/certifier signatures and evidence requirements are case-specific. Refer to Certificate of Correction instructions.

Source record limitations: The dataset does not authenticate who inspected the property, why inspection started, whether a defense succeeded, which contractor made repairs or whether AEU later accepted a correction. Do not turn this example into a claimed client success story or an invented inspection history.

Primary authority and fact-check links

Related library and official records

Official sources: Search DOB records · DOB summonses · Certificate of Correction FAQs · OATH hearing options · Construction codes

Need a resolution plan tied to the full summons?

Building Violation LLC can review the violation wording, permits, drawings, correction evidence and available OATH hearing procedures. A web example is not a determination of compliance for any property.

Call (866) 545-4440