Skip to content
Violation library › Case analysis › 28-301.1
Inspector-description analysis · administrative review

Plumbing fixture and drainage configuration: NYC DOB 28-301.1 / OATH summons 39202089Y

Original enforcement allegation, not a proven case outcome. The quotation below is from an inspector-written description in a public-record dataset. Extracts may end mid-sentence. The inspection origin, complete supporting evidence, legal finding, and disposition have not been independently verified. Interpretive explanations below are explicitly analytical possibilities.
Law citation: 28-301.1OATH infraction: 202Summons: 39202089Y

Original inspector allegation — verbatim available export

RCA ISSUED 04/02/25 SAME RESPONDENT FAILURE TO MAINTAIN BLDG, 28-301.1, STRESS CRACKS IN FOUNDATION WALLS EXP 2&3 CONSTRUCTION DEBRIS STORED IN REAR YARD INCLUDING SHARP EDGED BROKEN PORCELAIN TOILET, MILDEW/MO

Source limit: Source reference: NYC OATH/DOB summons 39202089Y; BIN 4168178; export issue date 08/27/2026. The earlier export status was ACTIVE; obtain current status from DOB or OATH. The CSV contains a respondent mailing address, which is not presumed to identify the inspected property. This is the entire description available in the supplied export, not a certified full summons, inspector notes or evidentiary exhibits. The description is at the export’s approximately 210-character field limit and may terminate mid-word or mid-sentence.

Get the complete, authentic notice: search summons 39202089Y in OATH Summons Finder instructions (download actual summons) and download the actual summons; review DOB records in NYC DOB records search. Never substitute the editorial discussion below for the inspector’s words.

Charge classification: law controls; keywords do not

Recorded citation: 28-301.1; recorded infraction: 202. Primary legal issue: safe building maintenance. Interpretive issue: Owner maintenance obligation. AC 28-301.1 requires buildings, equipment, safeguards and means of egress to be kept safe and maintained. The physical condition, rather than whether a particular permit exists, is normally the central question.

What must be tested: The applicable underlying technical standard and the actual defective component determine a lawful repair. An assertion that the building is generally safe does not rebut a specific defect.

Possible exceptions and legal limitations: An exemption from cyclical façade reporting does not exempt a building from general safe-maintenance duties. Determine whether the special rule actually applies. Eligibility is not established merely because the excerpt uses a word such as “repair”, “permit”, “cellar”, or “occupied”. Refer to NYC DOB construction codes.

Specific conditions mentioned in this inspector wording

1. Plumbing fixture and drainage configuration

Investigative test: Map each named fixture/connection to the approved layout and check who installed it and whether the work requires plumbing filing or licensed trade.

Evidence matched to this issue: Fixture schedule, riser drawings, photos, licensed-plumber report, permit history and test/inspection or abandonment proof.

Boundary / potential counterexample: A sink or drain alone does not prove creation of a lawful dwelling unit or justify a particular permit type.

2. Masonry or façade deterioration

Investigative test: Photograph and locate the defect by elevation and height; evaluate loose-material risk and whether exterior-wall/facade reporting rules apply.

Evidence matched to this issue: Elevation key and dated close-ups, Qualified Exterior Wall Inspector/engineering findings when relevant, protective plan and accepted post-repair inspection.

Boundary / potential counterexample: A material crack description is not a structural diagnosis; cyclical FISP applicability depends on building height and rule exceptions.

3. Zoning, site use or regulated sign

Investigative test: Identify zoning lot/district and exact installation or use; check approved surveys, permitted dimensions, occupancy use and applicable zoning map date.

Evidence matched to this issue: Survey and zoning analysis, dated dimensioned photographs, approved drawings and any relevant prior permit, variance or grandfathering documentation.

Boundary / potential counterexample: Grandfathered status or variance cannot be presumed from an older installation without lawful-history proof.

Inspector wording mapped to testable facts

Passage 1 — RCA ISSUED 04/02/25 SAME RESPONDENT FAILURE TO MAINTAIN BLDG, 28-301.1, STRESS CRACKS IN FOUNDATION WALLS EXP 2&3 CONSTRUCTIO…

This recorded passage identifies a question about plumbing fixture and drainage configuration, not a proven final determination. Map each named fixture/connection to the approved layout and check who installed it and whether the work requires plumbing filing or licensed trade. A sink or drain alone does not prove creation of a lawful dwelling unit or justify a particular permit type.

Identifiers, locations, measurements and chronology to verify

Cited calendar date: 04/02/25
Check whether this is a permit expiry, previous summons issuance, reinspection or compliance deadline; each has a different consequence.

Case-specific correction decision tree

Branch A — defect remains: assess risk and protection immediately, then undertake an appropriate licensed/engineered repair. Branch B — already repaired: pair before/after photos with scope, inspection and test results that address the *specific* defect. Branch C — inspector misidentified the component: use an elevation/floor key and technical field report; do not rely on an unspecific clean-inspection assertion.

First targeted evidence collection: Fixture schedule, riser drawings, photos, licensed-plumber report, permit history and test/inspection or abandonment proof. This is an investigative request, not a claim that the work or evidence already exists.

Editorial closure of the shortened allegation — NOT source text

Verbatim excerpt ends: “ EXP 2&3 CONSTRUCTION DEBRIS STORED IN REAR YARD INCLUDING SHARP EDGED BROKEN PORCELAIN TOILET, MILDEW/MO”. Non-source editorial completion (conditional reconstruction, not a quotation): “The allegation appears to concern plumbing fixture and drainage configuration; whether additional observations, directions, dates, measurements or exceptions followed is unknown and must be checked in the original summons.”

No missing words, dates, measurements, liability conclusion or regulatory remedy have been invented. Even if the final syllable looks obvious, completing it as a purported inspector quotation would misstate an official record.

Response, certification and closing evidence

A hearing defense, correction of the underlying condition, a DOB AEU Certificate of Correction and payment of an imposed penalty are distinct questions. Retrieve the summons and confirm the OATH hearing or outcome and DOB violation status. Under current DOB guidance, Certificate of Correction review requests are made in DOB NOW: Safety → Violations & Notices of Deficiency; submitter/certifier signatures and evidence requirements are case-specific. Refer to Certificate of Correction instructions.

Source record limitations: The dataset does not authenticate who inspected the property, why inspection started, whether a defense succeeded, which contractor made repairs or whether AEU later accepted a correction. Do not turn this example into a claimed client success story or an invented inspection history.

Primary authority and fact-check links

Related library and official records

Official sources: Search DOB records · DOB summonses · Certificate of Correction FAQs · OATH hearing options · Construction codes

Need a resolution plan tied to the full summons?

Building Violation LLC can review the violation wording, permits, drawings, correction evidence and available OATH hearing procedures. A web example is not a determination of compliance for any property.

Call (866) 545-4440