November 2026 NYC DOB / ECB / OATH public-record review

1005 Foster Avenue, Brooklyn, NY 11230 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 1005 Foster Avenue, Brooklyn, NY 11230. The source records identify structural or exterior maintenance, work without a permit and a hearing date of November 16, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Structural or exterior maintenanceWork without a permit

Property and hearing summary

Actual property address
1005 Foster Avenue, Brooklyn, NY 11230
Borough
Brooklyn
BIN
3128211
BBL
3054290032 (3/5429/32)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 16, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39195867Z
Normalized: 039195867Z
November 16, 2026
8:30 AM
CLASS - 1 Structural or exterior maintenance
39195868K
Normalized: 039195868K
November 16, 2026
8:30 AM
CLASS - 1 Work without a permit

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39195867Z — Structural or exterior maintenance

Normalized lookup key: 039195867Z
OATH hearingNovember 16, 20268:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component.

Record context: source category Construction, severity CLASS - 1, issued July 13, 2026.

Full violation description from the source extract

FAILURE TO MAINTAIN. ATOI AT A 2.75 WALK OBSERVED STRUCTURAL WOOD ROT IN THE SECOND-FLOOR LOAD-BEARING STRUCTURAL GIRDER DIRECTLY ABOVE THE FIRST-FLOOR SUPPORT BEAM JUNCTION., REPAIR AND/REPLACE

Issue date
July 13, 2026
Served date
July 13, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain. atoi at a 2.75 walk observed structural wood rot in the second-floor load-bearing structural girder directly above the first-floor support beam junction., repair and/replace.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Violation 2

Summons 39195868K — Work without a permit

Normalized lookup key: 039195868K
OATH hearingNovember 16, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit.

Record context: source category Construction, severity CLASS - 1, issued July 13, 2026.

Full violation description from the source extract

WORK WITHOUT PERMITS. ATOI OBSERVED AT A 2.75 WALK UP, PREVIOUSLY EXISTING PORCH SUPPORT COLUMNS REMOVED AND 3 NEW STEEL SUPPORT COLUMNS INSTALLED AND 2 NEW STEEL C-CHANNELS BOLTED TO THE HOUSE TO SUPPORT THE P

Issue date
July 13, 2026
Served date
July 13, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work without permits. atoi observed at a 2.75 walk up, previously existing porch support columns removed and 3 new steel support columns installed and 2 new steel c-channels bolted to the house to support the p.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Property-specific resolution support

How Building Violation LLC may help at 1005 Foster Avenue, Brooklyn, NY 11230

For 1005 Foster Avenue, Brooklyn, NY 11230, the current source extract points to structural or exterior maintenance, work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.