November 2026 NYC DOB / ECB / OATH public-record review

104-25 107 Street, Queens, NY 11417 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 104-25 107 Street, Queens, NY 11417. The source records identify work without a permit, dob/oath code-compliance issue and a hearing date of November 10, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permitDOB/OATH code-compliance issue

Property and hearing summary

Actual property address
104-25 107 Street, Queens, NY 11417
Borough
Queens
BIN
4202265
BBL
4095300067 (4/9530/67)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 10, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39149127X
Normalized: 039149127X
November 10, 2026
8:30 AM
CLASS - 3 Work without a permit
39149128H
Normalized: 039149128H
November 10, 2026
8:30 AM
CLASS - 1 DOB/OATH code-compliance issue

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39149127X — Work without a permit

Normalized lookup key: 039149127X
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references front yard, front area and exposure 1.

Specific record details: front yard, front area, exposure 1.

Full violation description from the source extract

NOTED: A METAL CANOPY, APPROXIMATELY 6'X8' BOLTED TO THE FRONT YARD PORCH (EXP 1) WITHIN 3' OF THE PROPERTY LINE., OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION

Issue date
May 27, 2025
Served date
May 28, 2025
Source violation type
Construction
Severity
CLASS - 3
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 301 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning a metal canopy, approximately 6'x8' bolted to the front yard porch (exp 1) within 3' of the property line.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 2

Summons 39149128H — DOB/OATH code-compliance issue

Normalized lookup key: 039149128H
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Unknown, severity CLASS - 1, issued May 27, 2025.

Full violation description from the source extract

NOTED: WORKER AT 2ND STORY INSTALLING WINDOWS WITHOUT FALL PROTECTION, PLATFORM NOT FULLY PLANKED, MISSING GUARDRAILS, EXCHANGING TOOLS PASSED BY ANOTHER WORKER ON LADDER, CREATING A DANGEROUS FALL HAZARD. STOP

Issue date
May 27, 2025
Served date
May 28, 2025
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning worker at 2nd story installing windows without fall protection, platform not fully planked, missing guardrails, exchanging tools passed by another worker on ladder, creating a dangerous fall hazard. stop.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Property-specific resolution support

How Building Violation LLC may help at 104-25 107 Street, Queens, NY 11417

For 104-25 107 Street, Queens, NY 11417, the current source extract points to work without a permit, dob/oath code-compliance issue. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.