November 2026 NYC DOB / ECB / OATH public-record review

1050 56 Street, Brooklyn, NY 11219 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 1050 56 Street, Brooklyn, NY 11219. The source records identify stop work order compliance and a hearing date of November 9, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Stop Work Order compliance

Property and hearing summary

Actual property address
1050 56 Street, Brooklyn, NY 11219
Borough
Brooklyn
BIN
3139983
BBL
3056880026 (3/5688/26)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 9, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39151577X
Normalized: 039151577X
November 9, 2026
10:30 AM
CLASS - 1 Stop Work Order compliance
39152085Y
Normalized: 039152085Y
November 9, 2026
10:30 AM
CLASS - 1 Stop Work Order compliance

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Several descriptions point to the same area (roof), which is a sign the summonses may be factually connected. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39151577X — Stop Work Order compliance

Normalized lookup key: 039151577X
OATH hearingNovember 9, 202610:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references roof, front area and Stop Work Order.

Specific record details: roof, front area, Stop Work Order.

Full violation description from the source extract

UNLAWFULLY CONTINUED WORK WHILE ON A NOTICE OF A STOP WORK ORDER. 2 STORY BUILDING AT THE ROOF LEVEL, EXISTING FRONT SKYLIGHTS REMOVED, EXISTING WOOD JOIST REMOVED AND REPLACE WITH C JOISTS SPANNING FROM EXPOSE

Issue date
June 20, 2025
Served date
June 20, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning unlawfully continued work while on a notice of a stop work order. 2 story building at the roof level, existing front skylights removed, existing wood joist removed and replace with c joists spanning from expose.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Violation 2

Summons 39152085Y — Stop Work Order compliance

Normalized lookup key: 039152085Y
OATH hearingNovember 9, 202610:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references roof and Stop Work Order.

Specific record details: roof, Stop Work Order.

Full violation description from the source extract

UNLAWFULLY CONTINUED WORK WHILE ON A NOTICE OF A STOP WORK ORDER, ROOF INSPECTION DATED 6/20/2025 ROOF WORK WAS APPROX. 75% COMPLETED. AT TIME OF INSPECTION OBSERVED, 2 MALE WORKERS ON SITE ENGAGE IN CONSTRUCTI

Issue date
June 26, 2025
Served date
June 26, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED, 2 MALE WORKERS ON SITE ENGAGE IN CONSTRUCTI.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Property-specific resolution support

How Building Violation LLC may help at 1050 56 Street, Brooklyn, NY 11219

For 1050 56 Street, Brooklyn, NY 11219, the current source extract points to stop work order compliance. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.