November 2026 NYC DOB / ECB / OATH public-record review

1059 2 Avenue, Manhattan, NY 10022 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 1059 2 Avenue, Manhattan, NY 10022. The source records identify construction housekeeping / debris, work not conforming to approved documents and a hearing date of November 5, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction housekeeping / debrisWork not conforming to approved documents

Property and hearing summary

Actual property address
1059 2 Avenue, Manhattan, NY 10022
Borough
Manhattan
BIN
1038586
BBL
1013290028 (1/1329/28)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 5, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558584Z
Normalized: 039558584Z
November 5, 2026
8:30 AM
CLASS - 1 Construction housekeeping / debris
39558585K
Normalized: 039558585K
November 5, 2026
9:30 AM
CLASS - 2 Work not conforming to approved documents

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558584Z — Construction housekeeping / debris

Normalized lookup key: 039558584Z
OATH hearingNovember 5, 20268:30 AM

What DOB alleges

DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references fourth floor.

Specific record details: fourth floor.

Full violation description from the source extract

DURING INSPECTION OF THE 4-STORY DEMOLITION, INADEQUATE HOUSEKEEPING WAS OBSERVED. UNCONTROLLED/EXCESSIVE STOCKING OF DEMOLISHED MATERIALS AT CERTAIN LOCATIONS ON THE 4TH FLOOR THIS MAY AFFECT THE WOODEN FLOOR

Issue date
August 31, 2026
Served date
August 31, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning during inspection of the 4-story demolition, inadequate housekeeping was observed. uncontrolled/excessive stocking of demolished materials at certain locations on the 4th floor this may affect the wooden floor.

What this violation means

The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.

What may be required to correct the condition

Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.

What the OATH hearing may involve

Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.

Possible defenses or factual issues worth investigating

Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed.

Documents and evidence that may be useful

  • dated photographs
  • site-safety or housekeeping logs
  • hauling/disposal receipts
  • contractor records
  • proof of correction
Violation 2

Summons 39558585K — Work not conforming to approved documents

Normalized lookup key: 039558585K
OATH hearingNovember 5, 20269:30 AM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents. The inspector's description specifically references scaffold/shoring and exposure 1.

Specific record details: scaffold/shoring, exposure 1.

Full violation description from the source extract

DURING INSPECTION OF THE 4-STORY DEMOLITION, OBSERVED PIPE SCAFFOLD AT EXPOSURE # 1. UPON CHECKING ON THE APPROVED PIPE SCAFFOLD DRAWINGS, STAIR TOWER AT EXP#1 WAS MISSING. CONDITION MAY CAUSE INJURY/FATALITIES

Issue date
August 31, 2026
Served date
August 31, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning during inspection of the 4-story demolition, observed pipe scaffold at exposure # 1. upon checking on the approved pipe scaffold drawings, stair tower at exp#1 was missing. condition may cause injury/fatalities.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Property-specific resolution support

How Building Violation LLC may help at 1059 2 Avenue, Manhattan, NY 10022

For 1059 2 Avenue, Manhattan, NY 10022, the current source extract points to construction housekeeping / debris, work not conforming to approved documents. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.