November 2026 NYC DOB / ECB / OATH public-record review

1085 Union Street, Brooklyn, NY 11225 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 1085 Union Street, Brooklyn, NY 11225. The source records identify stop work order compliance, failure to maintain and hearing dates on November 24, 2026 and November 9, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Stop Work Order complianceFailure to maintain

Property and hearing summary

Actual property address
1085 Union Street, Brooklyn, NY 11225
Borough
Brooklyn
BIN
3032885
BBL
3012660064 (3/1266/64)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 24, 2026, November 9, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39174385N
Normalized: 039174385N
November 9, 2026
8:30 AM
CLASS - 1 Stop Work Order compliance
39177321H
Normalized: 039177321H
November 24, 2026
8:30 AM
CLASS - 1 Failure to maintain

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39174385N — Stop Work Order compliance

Normalized lookup key: 039174385N
OATH hearingNovember 9, 20268:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references first floor and Stop Work Order.

Specific record details: first floor, Stop Work Order. The description also references Stop Work Order WAS.

Full violation description from the source extract

UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT 1ST FLOOR INTERIOR APARTMENT 2 ILLEGAL WORK CONTINUED AFTER SWO WAS ISSUED OBSERVED 2 WORKERS WITH TOOLS WORK IN PROGRESS., COMPLY WITH STOP WO

Issue date
January 19, 2026
Served date
January 19, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning unlawfully continued work while on notice of a stop work order. at 1st floor interior apartment 2 illegal work continued after swo was issued observed 2 workers with tools work in progress., comply with stop wo.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Violation 2

Summons 39177321H — Failure to maintain

Normalized lookup key: 039177321H
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges failure to maintain the cited building component or condition in a code-compliant manner.

Record context: source category Construction, severity CLASS - 1, issued February 13, 2026.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT APARTMENT #6 THE FLOORS ARE SAGGING AND CRACKING WITH SEPARATION IN MULTIPLE AREAS OF THE FLOOR. THE CEILING IS PEELING AND CRACKING ALONG WITH VERTIC

Issue date
February 13, 2026
Served date
February 13, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain building in a code compliant manner. at apartment #6 the floors are sagging and cracking with separation in multiple areas of the floor. the ceiling is peeling and cracking along with vertic.

What this violation means

DOB is alleging failure to maintain the building or a building component in a code-compliant condition. The broad label matters less than the particular defect described by the inspector.

What may be required to correct the condition

The cited component should be inspected and repaired by the appropriate qualified contractor or licensed/registered professional where the work requires it. Permits or filings may be needed if the repair goes beyond ordinary maintenance.

What the OATH hearing may involve

The strongest factual material usually concerns the exact condition on the inspection date: photographs, maintenance records, professional reports, repair invoices and proof of correction.

Possible defenses or factual issues worth investigating

Focus on the precise component and location in the description, whether the defect existed as alleged, whether the owner/respondent controlled that area, and whether later inspection or repair records clarify the condition.

Documents and evidence that may be useful

  • dated photographs
  • maintenance and repair records
  • contractor or professional reports
  • permits/inspection records if repair work required them
  • proof of correction
Property-specific resolution support

How Building Violation LLC may help at 1085 Union Street, Brooklyn, NY 11225

For 1085 Union Street, Brooklyn, NY 11225, the current source extract points to stop work order compliance, failure to maintain. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.