November 2026 NYC DOB / ECB / OATH public-record review

109 Blake Avenue, Brooklyn, NY 11212 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 5 DOB/ECB OATH summonses with 109 Blake Avenue, Brooklyn, NY 11212. The source records identify construction fence / site protection, sidewalk shed / temporary construction protection, construction-site safety and hearing dates on November 18, 2026 and November 4, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction fence / site protectionSidewalk shed / temporary construction protectionConstruction-site safety

Property and hearing summary

Actual property address
109 Blake Avenue, Brooklyn, NY 11212
Borough
Brooklyn
BIN
3430304
BBL
3035370001 (3/3537/1)
Hearing month
November 2026
Violations on this page
5
Verified hearing date(s) in source extract
November 18, 2026, November 4, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558379J
Normalized: 039558379J
November 4, 2026
9:30 AM
CLASS - 2 Construction fence / site protection
39558380R
Normalized: 039558380R
November 4, 2026
10:30 AM
CLASS - 1 Sidewalk shed / temporary construction protection
39558905K
Normalized: 039558905K
November 18, 2026
8:30 AM
CLASS - 2 Construction-site safety
39558906M
Normalized: 039558906M
November 18, 2026
9:30 AM
CLASS - 1 Sidewalk shed / temporary construction protection
39558907Y
Normalized: 039558907Y
November 18, 2026
10:30 AM
CLASS - 1 Sidewalk shed / temporary construction protection

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Several descriptions point to the same area (sidewalk shed), which is a sign the summonses may be factually connected. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558379J — Construction fence / site protection

Normalized lookup key: 039558379J
OATH hearingNovember 4, 20269:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references construction fence and exposure 1.

Specific record details: construction fence, exposure 1.

Full violation description from the source extract

AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED CONSTRUCTION FENCE IN PLACE AT EXPOSURE #1 AND 2, UPON REVIEW OF DOB RECORD IT REVEAL THAT THE CONSTRUCTION FENCE PERMIT HAS BEING EXPIRED FROM

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 207 — BC 105.8.2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed CONSTRUCTION FENCE IN PLACE AT EXPOSURE #1 AND 2, UPON REVIEW OF DOB RECORD IT REVEAL THAT THE CONSTRUCTION FENCE PERMIT HAS BEING EXPIRED FROM.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Violation 2

Summons 39558380R — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558380R
OATH hearingNovember 4, 202610:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed and exposure 1.

Specific record details: sidewalk shed, exposure 1.

Full violation description from the source extract

AT THE TIME OF MY INSPECTION, I OBSERVED CONCRETE PUMP TRUCK, CONCRETE WASHOUT BOX, GARBAGE TRUCK AT EXPOSURE #1,2. ADJACENT TO SIDEWALK SHED, THERE WERE NO 4 FEET SOLID PLYWOOD BARRIERS FROM GROUND LEVEL WITH

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed CONCRETE PUMP TRUCK, CONCRETE WASHOUT BOX, GARBAGE TRUCK AT EXPOSURE #1,2. ADJACENT TO SIDEWALK SHED, THERE WERE NO 4 FEET SOLID PLYWOOD BARRIERS FROM GROUND LEVEL WITH.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 3

Summons 39558905K — Construction-site safety

Normalized lookup key: 039558905K
OATH hearingNovember 18, 20268:30 AM

What DOB alleges

DOB alleges a construction-site safety or safeguarding deficiency. The inspector's description specifically references electrical wiring/equipment.

Specific record details: electrical wiring/equipment.

Full violation description from the source extract

AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED WORKERS STANDING ON TOP OF TOOLBOX AND ON BATHTUB DOING ELECTRICAL WORK FRAMING AND NOT ON LADDERS. FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES

Issue date
September 8, 2026
Served date
September 9, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed WORKERS STANDING ON TOP OF TOOLBOX AND ON BATHTUB DOING ELECTRICAL WORK FRAMING AND NOT ON LADDERS. FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES.

What this violation means

This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.

What may be required to correct the condition

The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction. Because electrical work is mentioned, any correction plan should separately verify whether licensed electrical work, filing or inspection is required.

What the OATH hearing may involve

Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.

Possible defenses or factual issues worth investigating

Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records.

Documents and evidence that may be useful

  • site-safety plans and temporary-construction drawings
  • daily logs and inspection reports
  • dated photographs/video
  • permit and superintendent/site-safety records
  • proof of correction/reinspection
Violation 4

Summons 39558906M — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558906M
OATH hearingNovember 18, 20269:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

BC 3307.4.7 AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED BOOM TRUCK AND LARGE GENERATOR ON STREET ADJACENT TO SIDEWALK SHED WITH NO 4 FEET SOLID BARRIER FROM GROUND LEVEL AND NO 18 GAUGE W

Issue date
September 8, 2026
Served date
September 9, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed BOOM TRUCK AND LARGE GENERATOR ON STREET ADJACENT TO SIDEWALK SHED WITH NO 4 FEET SOLID BARRIER FROM GROUND LEVEL AND NO 18 GAUGE W.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 5

Summons 39558907Y — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558907Y
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references sidewalk shed.

Specific record details: sidewalk shed.

Full violation description from the source extract

BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED LARGE GENERATOR ON STREET ADJACENT TO SIDEWALK SHED, UPON REQUEST FOR DOT PERMIT NONE WAS PROVIDE OR AT JOBSITE, FAILURE TO PROVIDE

Issue date
September 8, 2026
Served date
September 9, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed LARGE GENERATOR ON STREET ADJACENT TO SIDEWALK SHED, UPON REQUEST FOR DOT PERMIT NONE WAS PROVIDE OR AT JOBSITE, FAILURE TO PROVIDE.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Property-specific resolution support

How Building Violation LLC may help at 109 Blake Avenue, Brooklyn, NY 11212

For 109 Blake Avenue, Brooklyn, NY 11212, the current source extract points to construction fence / site protection, sidewalk shed / temporary construction protection, construction-site safety. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.