November 2026 NYC DOB / ECB / OATH public-record review

1091 Willmohr Street, Brooklyn, NY 11212 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 1 DOB/ECB OATH summons with 1091 Willmohr Street, Brooklyn, NY 11212. The source records identify fire-safety condition and a hearing date of November 18, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Fire-safety condition

Property and hearing summary

Actual property address
1091 Willmohr Street, Brooklyn, NY 11212
Borough
Brooklyn
BIN
3101851
BBL
3046700007 (3/4670/7)
Hearing month
November 2026
Violations on this page
1
Verified hearing date(s) in source extract
November 18, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39203067H
Normalized: 039203067H
November 18, 2026
10:30 AM
CLASS - 2 Fire-safety condition

How the summonses fit together at this property

This page contains one resolved summons for this property. Its source allegation concerns fire-safety condition; the hearing and correction tracks should still be treated separately, because resolving the physical condition does not by itself prove the OATH/DOB record has been closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39203067H — Fire-safety condition

Normalized lookup key: 039203067H
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges a fire-safety or fire-hazard condition. The inspector's description specifically references combustible materials and debris/housekeeping.

Specific record details: combustible materials, debris/housekeeping.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER, ATOI OBSERVED IN THE COURTYARD OF THE PROPERTY EXCESS DEBRIS CONSISTING OF COMBUSTIBLE MISCELLANEOUS PIECES OF WOOD, BROKEN FURNITURE BOTH METAL AND WOOD

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain building in a code compliant manner, atoi observed in the courtyard of the property excess debris consisting of combustible miscellaneous pieces of wood, broken furniture both metal and wood.

What this violation means

DOB is alleging a fire-safety or fire-hazard condition, such as combustible storage, a required fire-protection component, or another condition that could affect fire spread or safe operation of the building.

What may be required to correct the condition

The cited fire-hazard condition should be removed or corrected promptly. If the condition involves a building system or rated construction rather than simple housekeeping, the applicable approved plans, fire-protection requirements and licensed-professional/trade work should be reviewed.

What the OATH hearing may involve

Hearing evidence may include photographs from the inspection date, proof of removal/repair, fire-protection plans or system records, and documentation showing who controlled the cited area.

Possible defenses or factual issues worth investigating

Verify the specific hazard, location, whether it was present as described, whether it was transient storage or a permanent condition, and whether any building-system repair or permit was required.

Documents and evidence that may be useful

  • dated photographs
  • fire-protection/system records where relevant
  • repair/removal invoices
  • approved plans if rated construction or equipment is involved
  • proof of correction
Property-specific resolution support

How Building Violation LLC may help at 1091 Willmohr Street, Brooklyn, NY 11212

For 1091 Willmohr Street, Brooklyn, NY 11212, the current source extract points to fire-safety condition. The engagement can stay focused on this summons while also checking the underlying DOB record so the physical correction and agency closeout are not treated as the same step. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.