Summons 39559139P — Construction fence / site protection
Normalized lookup key: 039559139PWhat DOB alleges
DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references construction fence, debris/housekeeping and exposure 2, 3.
Specific record details: construction fence, debris/housekeeping, exposure 2, 3.
Full violation description from the source extract
ALTERATION OF A 3 STORY BUILDING. OBSERVED UNENCLOSED PORTION OF THE BUILDING AND PILES OF MATERIALS AT EXP#3 WITHOUT A CONSTRUCTION FENCE ENCLOSURE AT EXP#2,3&4 WITH VISIBLE DEBRIS ON THE ADJACENT PROPERTIES'
- Issue date
- September 14, 2026
- Served date
- September 14, 2026
- Source violation type
- Construction
- Severity
- CLASS - 2
- Hearing status in source extract
- PENDING
- 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning alteration of a 3 story building. observed unenclosed portion of the building and piles of materials at exp#3 without a construction fence enclosure at exp#2,3&4 with visible debris on the adjacent properties'.
What this violation means
The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.
What may be required to correct the condition
The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.
What the OATH hearing may involve
Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.
Possible defenses or factual issues worth investigating
Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.
Documents and evidence that may be useful
- site-protection/construction-fence drawings
- dated photographs
- site-safety inspection logs
- contractor repair records
- reinspection records