November 2026 NYC DOB / ECB / OATH public-record review

110-112 East 1 Street, Manhattan, NY 10002 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 110-112 East 1 Street, Manhattan, NY 10002. The source records identify work without a permit, work not conforming to approved documents and a hearing date of November 17, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permitWork not conforming to approved documents

Property and hearing summary

Actual property address
110-112 East 1 Street, Manhattan, NY 10002
Borough
Manhattan
BIN
1005755
BBL
1004290047 (1/429/47)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 17, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39147574Z
Normalized: 039147574Z
November 17, 2026
8:30 AM
CLASS - 1 Work without a permit
39154465P
Normalized: 039154465P
November 17, 2026
8:30 AM
CLASS - 2 Work not conforming to approved documents

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39147574Z — Work without a permit

Normalized lookup key: 039147574Z
OATH hearingNovember 17, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references bedroom(s).

Specific record details: bedroom(s).

Full violation description from the source extract

WORK WITHOUT A PERMIT. AT TIME OF INSPECTION I OBSERVED APARTMENT 4 CONVERTED TO 3 BEDROOMS FROM 2 WITHOUT A PERMIT. ADDITIONALLY APARTMENT 15 WAS CONVERTED TO 4 BEDROOMS FROM 3 WITHOUT A PERMIT AS WELL., OBTAI

Issue date
May 9, 2025
Served date
May 9, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed APARTMENT 4 CONVERTED TO 3 BEDROOMS FROM 2 WITHOUT A PERMIT. ADDITIONALLY APARTMENT 15 WAS CONVERTED TO 4 BEDROOMS FROM 3 WITHOUT A PERMIT AS WELL., OBTAI.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 2

Summons 39154465P — Work not conforming to approved documents

Normalized lookup key: 039154465P
OATH hearingNovember 17, 20268:30 AM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents. The inspector's description specifically references bedroom(s).

Specific record details: bedroom(s).

Full violation description from the source extract

WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR AMENDMENTS. NOTED IN APT #10 (4) BEDROOMS PRESENT WHICH IS CONTRARY TO JOB #104773620 (PERMIT ISSUED 05/22/2007) WHICH INDICATES APT #10 AS (2) BEDROO

Issue date
July 18, 2025
Served date
July 22, 2025
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work does not conform to approved construction documents or amendments. noted in apt #10 (4) bedrooms present which is contrary to job #104773620 (permit issued 05/22/2007) which indicates apt #10 as (2) bedroo.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Property-specific resolution support

How Building Violation LLC may help at 110-112 East 1 Street, Manhattan, NY 10002

For 110-112 East 1 Street, Manhattan, NY 10002, the current source extract points to work without a permit, work not conforming to approved documents. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.