November 2026 NYC DOB / ECB / OATH public-record review

114 Waverly Avenue, Brooklyn, NY 11205 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 3 DOB/ECB OATH summonses with 114 Waverly Avenue, Brooklyn, NY 11205. The source records identify sidewalk shed / temporary construction protection, dob/oath code-compliance issue and a hearing date of November 4, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Sidewalk shed / temporary construction protectionDOB/OATH code-compliance issue

Property and hearing summary

Actual property address
114 Waverly Avenue, Brooklyn, NY 11205
Borough
Brooklyn
BIN
3830521
BBL
3018880079 (3/1888/79)
Hearing month
November 2026
Violations on this page
3
Verified hearing date(s) in source extract
November 4, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
35729643H
Normalized: 035729643H
November 4, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
35729644J
Normalized: 035729644J
November 4, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
35729645L
Normalized: 035729645L
November 4, 2026
8:30 AM
CLASS - 2 DOB/OATH code-compliance issue

How the summonses fit together at this property

This property has 3 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 35729643H — Sidewalk shed / temporary construction protection

Normalized lookup key: 035729643H
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references exposure 1.

Specific record details: exposure 1.

Full violation description from the source extract

PEDESTRIAN PROTECTION DOES NOT MEET SPECIFICATIONS. AT THE TIME OF INSPECTION OBSERVED SHED PARAPET AT EXP #1 IS BULGING AND LOOSE. REMEDY: COMPLY TO CODE SPECIFICATIONS.

Issue date
August 28, 2026
Served date
August 28, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning pedestrian protection does not meet specifications. at the time of inspection observed shed parapet at exp #1 is bulging and loose.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 2

Summons 35729644J — Sidewalk shed / temporary construction protection

Normalized lookup key: 035729644J
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references roof and exposure 1.

Specific record details: roof, exposure 1.

Full violation description from the source extract

PEDESTRIAN PROTECTION DOES NOT MEET SPECIFICATIONS. AT THE TIME OF INSPECTION OBSERVED AT EXP #1 LOOSE NETTING AT ROOF LEVEL. REMEDY: COMPLYTO CODE SPECIFICATIONS.

Issue date
August 28, 2026
Served date
August 28, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning pedestrian protection does not meet specifications. at the time of inspection observed at exp #1 loose netting at roof level.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 3

Summons 35729645L — DOB/OATH code-compliance issue

Normalized lookup key: 035729645L
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Unknown, severity CLASS - 2, issued August 28, 2026.

Full violation description from the source extract

TEMP CONSTRUCTION EQUIP/INSTALLATION ON SITE EXPIRED PERMIT(SHED). AT THE TIME OF INSPECTION OBSERVED THERE IS NO ACTIVE PERMIT FOR SHED. I CHECKED DOB NOW AND BIS WEB, ALSO THERE IS NO ACTIVE PERMIT ISSUED. JO

Issue date
August 28, 2026
Served date
August 28, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P8

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning temp construction equip/installation on site expired permit(shed). at the time of inspection observed there is no active permit for shed. i checked DOB now and bis web, also there is no active permit issued. jo.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Property-specific resolution support

How Building Violation LLC may help at 114 Waverly Avenue, Brooklyn, NY 11205

For 114 Waverly Avenue, Brooklyn, NY 11205, the current source extract points to sidewalk shed / temporary construction protection, dob/oath code-compliance issue. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.