November 2026 NYC DOB / ECB / OATH public-record review

116-22-116-28 Rockaway Boulevard, Queens, NY 11420 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 7 DOB/ECB OATH summonses with 116-22-116-28 Rockaway Boulevard, Queens, NY 11420. The source records identify dob/oath code-compliance issue, work without a permit, certificate of correction / compliance filing and a hearing date of November 10, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

DOB/OATH code-compliance issueWork without a permitCertificate of Correction / compliance filing

Property and hearing summary

Actual property address
116-22-116-28 Rockaway Boulevard, Queens, NY 11420
Borough
Queens
BIN
4253420
BBL
4117090038 (4/11709/38)
Hearing month
November 2026
Violations on this page
7
Verified hearing date(s) in source extract
November 10, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39202621L
Normalized: 039202621L
November 10, 2026
8:30 AM
CLASS - 1 DOB/OATH code-compliance issue
39202622N
Normalized: 039202622N
November 10, 2026
9:30 AM
CLASS - 1 Work without a permit
39202623P
Normalized: 039202623P
November 10, 2026
10:30 AM
CLASS - 1 Work without a permit
39202624R
Normalized: 039202624R
November 10, 2026
8:30 AM
CLASS - 1 DOB/OATH code-compliance issue
39202625Z
Normalized: 039202625Z
November 10, 2026
9:30 AM
CLASS - 1 Work without a permit
39202626K
Normalized: 039202626K
November 10, 2026
10:30 AM
CLASS - 2 Certificate of Correction / compliance filing
39202627M
Normalized: 039202627M
November 10, 2026
8:30 AM
CLASS - 2 Certificate of Correction / compliance filing

How the summonses fit together at this property

At least one summons concerns failure to file or obtain acceptance of a Certificate of Correction. That later compliance issue should be cross-checked against the underlying summons it references; paying or resolving one record does not automatically establish that the other record is closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39202621L — DOB/OATH code-compliance issue

Normalized lookup key: 039202621L
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Construction, severity CLASS - 1, issued September 1, 2026.

Full violation description from the source extract

FAILURE TO COMPLY TO COMMISSIONER'S ORDER TO OBTAIN PERMITS FOR VIOLATION #39145080J. AS OF 9/1/2026, NO PERMITS HAS BEEN FILED WITHIN DEPT. RECORDS, COMPLY WITH COMMISSIONER'S ORDER

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to comply to commissioner's order to.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 2

Summons 39202622N — Work without a permit

Normalized lookup key: 039202622N
OATH hearingNovember 10, 20269:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit.

Record context: source category Construction, severity CLASS - 1, issued September 1, 2026.

Full violation description from the source extract

UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIOLATION 39178676L., COMPLY WITH COMMISSIONER'S ORDER

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning unlawful acts. failure to comply with the commissioner's order. failure to.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 3

Summons 39202623P — Work without a permit

Normalized lookup key: 039202623P
OATH hearingNovember 10, 202610:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit.

The description also references prior summons 39156575P.

Full violation description from the source extract

UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR SUMMONS 39156575P, COMPLY WITH COMMISSIONER'S ORDER

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning unlawful acts. failure to comply with the commissioner's order. failure to.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 4

Summons 39202624R — DOB/OATH code-compliance issue

Normalized lookup key: 039202624R
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

Record context: source category Construction, severity CLASS - 1, issued September 1, 2026.

Full violation description from the source extract

FAILURE TO COMPLY TO COMMISSIONER'S ORDER TO OBTAIN PERMITS FOR VIOLATION #39145081L. AS OF 9/1/2026, NO PERMITS HAS BEEN FILED WITHIN DEPT. RECORDS, COMPLY WITH COMMISSIONER'S ORDER

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to comply to commissioner's order to.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 5

Summons 39202625Z — Work without a permit

Normalized lookup key: 039202625Z
OATH hearingNovember 10, 20269:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit.

Record context: source category Construction, severity CLASS - 1, issued September 1, 2026.

Full violation description from the source extract

UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR 39178678P, COMPLY WITH COMMISSIONER'S ORDER

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning unlawful acts. failure to comply with the commissioner's order. failure to.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 6

Summons 39202626K — Certificate of Correction / compliance filing

Normalized lookup key: 039202626K
OATH hearingNovember 10, 202610:30 AM

What DOB alleges

DOB alleges that a required Certificate of Correction was not filed or accepted for an earlier summons. The inspector's description specifically references Certificate of Correction.

Specific record details: Certificate of Correction. The description also references prior summons 39178679R.

Full violation description from the source extract

FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39178679R, FILE A CERTIFICATE OF CORRECTION

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39178679r, file a certificate of correction.

What this violation means

This summons alleges failure to comply with a prior Commissioner's order by filing an acceptable Certificate of Correction for an earlier summons. The underlying violation and the later compliance summons are separate records that should be tracked together.

What may be required to correct the condition

First identify the underlying summons referenced in the description and verify whether the physical condition was corrected, whether a Certificate of Correction was submitted, and its current DOB status. If correction is still outstanding, the underlying condition generally has to be addressed before an acceptable certification package can be completed.

What the OATH hearing may involve

The hearing may turn on the status of the underlying summons, the order to certify correction, the timing and adequacy of any submission, and whether DOB records show an accepted, rejected or missing Certificate of Correction.

Possible defenses or factual issues worth investigating

Verify the underlying summons number, correction deadline/order, any prior Certificate of Correction request, disapproval reason, and whether later agency activity changed the status. Do not assume payment of an OATH penalty closed the DOB correction requirement. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • copy/status of the underlying summons
  • Certificate of Correction submission and DOB response
  • proof of physical correction such as photographs, receipts or permits
  • DOB NOW/BIS status records
  • OATH disposition and payment records if relevant
Violation 7

Summons 39202627M — Certificate of Correction / compliance filing

Normalized lookup key: 039202627M
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that a required Certificate of Correction was not filed or accepted for an earlier summons. The inspector's description specifically references Certificate of Correction.

Specific record details: Certificate of Correction. The description also references prior summons 39178680Y.

Full violation description from the source extract

FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39178680Y, FILE A CERTIFICATE OF CORRECTION

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39178680y, file a certificate of correction.

What this violation means

This summons alleges failure to comply with a prior Commissioner's order by filing an acceptable Certificate of Correction for an earlier summons. The underlying violation and the later compliance summons are separate records that should be tracked together.

What may be required to correct the condition

First identify the underlying summons referenced in the description and verify whether the physical condition was corrected, whether a Certificate of Correction was submitted, and its current DOB status. If correction is still outstanding, the underlying condition generally has to be addressed before an acceptable certification package can be completed.

What the OATH hearing may involve

The hearing may turn on the status of the underlying summons, the order to certify correction, the timing and adequacy of any submission, and whether DOB records show an accepted, rejected or missing Certificate of Correction.

Possible defenses or factual issues worth investigating

Verify the underlying summons number, correction deadline/order, any prior Certificate of Correction request, disapproval reason, and whether later agency activity changed the status. Do not assume payment of an OATH penalty closed the DOB correction requirement. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • copy/status of the underlying summons
  • Certificate of Correction submission and DOB response
  • proof of physical correction such as photographs, receipts or permits
  • DOB NOW/BIS status records
  • OATH disposition and payment records if relevant
Property-specific resolution support

How Building Violation LLC may help at 116-22-116-28 Rockaway Boulevard, Queens, NY 11420

For 116-22-116-28 Rockaway Boulevard, Queens, NY 11420, the current source extract points to dob/oath code-compliance issue, work without a permit, certificate of correction / compliance filing. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.