November 2026 NYC DOB / ECB / OATH public-record review

119-11 146 Street, Queens, NY 11436 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 3 DOB/ECB OATH summonses with 119-11 146 Street, Queens, NY 11436. The source records identify work without a permit, failure to maintain, dob/oath code-compliance issue and a hearing date of November 24, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permitFailure to maintainDOB/OATH code-compliance issue

Property and hearing summary

Actual property address
119-11 146 Street, Queens, NY 11436
Borough
Queens
BIN
4261115
BBL
4120270071 (4/12027/71)
Hearing month
November 2026
Violations on this page
3
Verified hearing date(s) in source extract
November 24, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39168503Y
Normalized: 039168503Y
November 24, 2026
8:30 AM
CLASS - 1 Work without a permit
39168504X
Normalized: 039168504X
November 24, 2026
8:30 AM
CLASS - 2 Failure to maintain
39168505H
Normalized: 039168505H
November 24, 2026
8:30 AM
CLASS - 2 DOB/OATH code-compliance issue

How the summonses fit together at this property

This property has 3 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39168503Y — Work without a permit

Normalized lookup key: 039168503Y
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references roof and rear area.

Specific record details: roof, rear area.

Full violation description from the source extract

AS PER PREVIOUS RCA ISSUED ON 05/03/24 BY BADGE # 3285 WORK WITHOUT PERMIT AT REAR 2 STORY EXTENSION ERECTED ATTACHED TO EXISTING PREMISES W/2 WINDOWS, REAR ENTRY DOOR & EXTENDED THE PITCHED ROOF & VINYL SIDING

Issue date
November 26, 2025
Served date
November 26, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning as per previous rca issued on 05/03/24 by badge # 3285 work without permit at rear 2 story extension erected attached to existing premises w/2 windows, rear entry door & extended the pitched roof & vinyl siding.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 2

Summons 39168504X — Failure to maintain

Normalized lookup key: 039168504X
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges failure to maintain the cited building component or condition in a code-compliant manner. The inspector's description specifically references front area and exposure 2.

Specific record details: front area, exposure 2.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER 2 LEADER PIPES AT EXP 2 & 4 LEFT & RIGHT SIDE OF PROPERTY FRONT NOT CONNECTED TO STORM DRAINAGE SYSTEM AS REQUIRED WHICH ALLOWS WATER TO FLOW EXCESSIVELY TO

Issue date
November 26, 2025
Served date
November 26, 2025
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain building in code compliant manner 2 leader pipes at exp 2 & 4 left & right side of property front not connected to storm drainage system as required which allows water to flow excessively to.

What this violation means

DOB is alleging failure to maintain the building or a building component in a code-compliant condition. The broad label matters less than the particular defect described by the inspector.

What may be required to correct the condition

The cited component should be inspected and repaired by the appropriate qualified contractor or licensed/registered professional where the work requires it. Permits or filings may be needed if the repair goes beyond ordinary maintenance.

What the OATH hearing may involve

The strongest factual material usually concerns the exact condition on the inspection date: photographs, maintenance records, professional reports, repair invoices and proof of correction.

Possible defenses or factual issues worth investigating

Focus on the precise component and location in the description, whether the defect existed as alleged, whether the owner/respondent controlled that area, and whether later inspection or repair records clarify the condition.

Documents and evidence that may be useful

  • dated photographs
  • maintenance and repair records
  • contractor or professional reports
  • permits/inspection records if repair work required them
  • proof of correction
Violation 3

Summons 39168505H — DOB/OATH code-compliance issue

Normalized lookup key: 039168505H
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition. The inspector's description specifically references electrical wiring/equipment and exposure 4.

Specific record details: electrical wiring/equipment, exposure 4.

Full violation description from the source extract

UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE, AT EXP 4 OF PROPERTY (5) WALL MOUNTED A/C SPLIT UNITS INSTALLED W/ELECTRICAL LINES CONNECTED THROUG

Issue date
November 26, 2025
Served date
November 26, 2025
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2C9 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use, at exp 4 of property (5) wall mounted a/c split units installed w/electrical lines connected throug.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout. Because electrical work is mentioned, any correction plan should separately verify whether licensed electrical work, filing or inspection is required.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Property-specific resolution support

How Building Violation LLC may help at 119-11 146 Street, Queens, NY 11436

For 119-11 146 Street, Queens, NY 11436, the current source extract points to work without a permit, failure to maintain, dob/oath code-compliance issue. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.