The resolved public-record dataset associates 9 DOB/ECB OATH summonses with 1220 Greene Avenue, Brooklyn, NY 11221. The source records identify structural or exterior maintenance, construction housekeeping / debris, construction-site safety and a hearing date of November 4, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Structural or exterior maintenanceConstruction housekeeping / debrisConstruction-site safetyConstruction fence / site protection

Property and hearing summary

Actual property address
1220 Greene Avenue, Brooklyn, NY 11221
Borough
Brooklyn
BIN
3075381
BBL
3032960044 (3/3296/44)
Hearing month
November 2026
Violations on this page
9
Verified hearing date(s) in source extract
November 4, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558364R
Normalized: 039558364R
November 4, 2026
8:30 AM
CLASS - 1 Structural or exterior maintenance
39558365Z
Normalized: 039558365Z
November 4, 2026
8:30 AM
CLASS - 2 Construction housekeeping / debris
39558366K
Normalized: 039558366K
November 4, 2026
9:30 AM
CLASS - 2 Construction-site safety
39558367M
Normalized: 039558367M
November 4, 2026
10:30 AM
CLASS - 2 Construction fence / site protection
39558368Y
Normalized: 039558368Y
November 4, 2026
8:30 AM
CLASS - 1 DOB/OATH code-compliance issue
39558369X
Normalized: 039558369X
November 4, 2026
8:30 AM
CLASS - 1 Electrical work without a permit
39558376Y
Normalized: 039558376Y
November 4, 2026
9:30 AM
CLASS - 2 Plumbing or gas work without a permit
39558377X
Normalized: 039558377X
November 4, 2026
10:30 AM
CLASS - 1 Work not conforming to approved documents
39558378H
Normalized: 039558378H
November 4, 2026
8:30 AM
CLASS - 1 Construction-site safety

How the summonses fit together at this property

This property has 9 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (cellar), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558364R — Structural or exterior maintenance

Normalized lookup key: 039558364R
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component. The inspector's description specifically references cellar.

Specific record details: cellar.

Full violation description from the source extract

BC 1704.1.1 (MISC. & 27-132 ) AT TIME OF INSPECTION OBSERVED STRUCTURAL WORK STEEL BEAM IN PLACE AT CELLAR LEVEL SUPPORTING FIRST FLOOR. NO TR1 FOR STRUCTURAL STEEL BEAM AND NO WOOD JOINTS. UPON REVIEWING DOB

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED STRUCTURAL WORK STEEL BEAM IN PLACE AT CELLAR LEVEL SUPPORTING FIRST FLOOR. NO TR1 FOR STRUCTURAL STEEL BEAM AND NO WOOD JOINTS. UPON REVIEWING DOB.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Violation 2

Summons 39558365Z — Construction housekeeping / debris

Normalized lookup key: 039558365Z
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references front yard, front area, debris/housekeeping and exposure 1.

Specific record details: front yard, front area, debris/housekeeping, exposure 1.

Full violation description from the source extract

AT TIME OF INSPECTION ACTIVE SITE OBSERVED LARGE PILE OF DEBRIS ACCUMULATION AT FRONT YARD EXP# 1, BRACING THE FENCE POSED A RISK OF COLLAPSING. STOP ALL WORK ENTIRE .

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 212 — BC 3303.4,27-1018 FAIL TO MAINTAIN ADEQUATE HSEKEEPING PER SECTIONS REQUIREMENTS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection ACTIVE SITE OBSERVED LARGE PILE OF DEBRIS ACCUMULATION AT FRONT YARD EXP# 1, BRACING THE FENCE POSED A RISK OF COLLAPSING. STOP ALL WORK ENTIRE.

What this violation means

The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.

What may be required to correct the condition

Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.

What the OATH hearing may involve

Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.

Possible defenses or factual issues worth investigating

Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • dated photographs
  • site-safety or housekeeping logs
  • hauling/disposal receipts
  • contractor records
  • proof of correction
Violation 3

Summons 39558366K — Construction-site safety

Normalized lookup key: 039558366K
OATH hearingNovember 4, 20269:30 AM

What DOB alleges

DOB alleges a construction-site safety or safeguarding deficiency.

Record context: source category Construction, severity CLASS - 2, issued August 25, 2026.

Full violation description from the source extract

AT TIME OF INSPECTION ACTIVE SITE WORK IN PROGRESS UPON REQUESTING DOCUMENTS - SITE SAFETY PLANS APPROVED PLANS NONE WERE PROVIDED. STOP ALL WORK ENTIRE SITE.

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection ACTIVE SITE WORK IN PROGRESS UPON REQUESTING DOCUMENTS - SITE SAFETY PLANS APPROVED PLANS NONE WERE PROVIDED. STOP ALL WORK ENTIRE SITE.

What this violation means

This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.

What may be required to correct the condition

The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction.

What the OATH hearing may involve

Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.

Possible defenses or factual issues worth investigating

Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records.

Documents and evidence that may be useful

  • site-safety plans and temporary-construction drawings
  • daily logs and inspection reports
  • dated photographs/video
  • permit and superintendent/site-safety records
  • proof of correction/reinspection
Violation 4

Summons 39558367M — Construction fence / site protection

Normalized lookup key: 039558367M
OATH hearingNovember 4, 202610:30 AM

What DOB alleges

DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references construction fence and debris/housekeeping.

Specific record details: construction fence, debris/housekeeping.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED UNSECURED SITE OPEN PERIMETER WALLS AND LARGE PILES OF DEBRIS WITH NO 8FT CONSTRUCTION FENCE. THIS CREATES UNAUTHORIZED ACCESS FOR PUBLIC TO ENTER SITES. STOP ALL WORK ENTIRE SITE

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED UNSECURED SITE OPEN PERIMETER WALLS AND LARGE PILES OF DEBRIS WITH NO 8FT CONSTRUCTION FENCE. THIS CREATES UNAUTHORIZED ACCESS FOR PUBLIC TO ENTER SITES. STOP ALL WORK ENTIRE SITE.

What this violation means

The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.

What may be required to correct the condition

The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.

What the OATH hearing may involve

Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.

Possible defenses or factual issues worth investigating

Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.

Documents and evidence that may be useful

  • site-protection/construction-fence drawings
  • dated photographs
  • site-safety inspection logs
  • contractor repair records
  • reinspection records
Violation 5

Summons 39558368Y — DOB/OATH code-compliance issue

Normalized lookup key: 039558368Y
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition. The inspector's description specifically references first floor and second floor.

Specific record details: first floor, second floor.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED NO HANDRAIL INSTALLED AT STAIRS CASE AT 1ST FLOOR TO 2ND FLOOR LEVEL. STOP ALL USE OF STAIRCASE.

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 120 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED NO HANDRAIL INSTALLED AT STAIRS CASE AT 1ST FLOOR TO 2ND FLOOR LEVEL. STOP ALL USE OF STAIRCASE.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 6

Summons 39558369X — Electrical work without a permit

Normalized lookup key: 039558369X
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references electrical wiring/equipment.

Specific record details: electrical wiring/equipment.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED ROUGH-IN OF ELECTRICAL. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS NO ELECTRICAL PERMIT FOUND OR OBTAINED IN ADDITION UPON REQUESTING NONE PROVIDED. STOP ALL ELECTRICAL WORK EN

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED ROUGH-IN OF ELECTRICAL. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS NO ELECTRICAL PERMIT FOUND OR OBTAINED IN ADDITION UPON REQUESTING NONE PROVIDED. STOP ALL ELECTRICAL WORK EN.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 7

Summons 39558376Y — Plumbing or gas work without a permit

Normalized lookup key: 039558376Y
OATH hearingNovember 4, 20269:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references plumbing lines/fixtures.

Specific record details: plumbing lines/fixtures.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED ROUGH-IN OF PLUMBING. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS NO PLUMBING PERMIT FOUND/ OBTAINED IN ADDITION UPON REQUESTING NONE PROVIDED. STOP ALL PLUMBING ENTIRE SITE.

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Plumbing
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 257 — 28-105.1 PLUMBING WORK WITHOUT A PERMIT IN MANUFACTURING DISTRICT FOR RESIDENTI

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED ROUGH-IN OF PLUMBING. UPON REVIEWING DOB NOW AND BIS SYSTEM REVEALS NO PLUMBING PERMIT FOUND/ OBTAINED IN ADDITION UPON REQUESTING NONE PROVIDED. STOP ALL PLUMBING ENTIRE SITE.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 8

Summons 39558377X — Work not conforming to approved documents

Normalized lookup key: 039558377X
OATH hearingNovember 4, 202610:30 AM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents. The inspector's description specifically references cellar, roof, second floor and exposure 1.

Specific record details: cellar, roof, second floor, exposure 1.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED STRUCTURAL WORK STEAL BEAM IN PLACE AT CELLAR LEVEL SUPPORTING FIRST FLOOR. STAIRS ARE INSTALLED ON THE 2ND FLOOR LEADING TO ROOF WITH ADDED BULK. STAIRS REMOVED AT EXP#1. UPON RE

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED STRUCTURAL WORK STEAL BEAM IN PLACE AT CELLAR LEVEL SUPPORTING FIRST FLOOR. STAIRS ARE INSTALLED ON THE 2ND FLOOR LEADING TO ROOF WITH ADDED BULK. STAIRS REMOVED AT EXP#1. UPON RE.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Violation 9

Summons 39558378H — Construction-site safety

Normalized lookup key: 039558378H
OATH hearingNovember 4, 20268:30 AM

What DOB alleges

DOB alleges a construction-site safety or safeguarding deficiency.

Record context: source category Site Safety, severity CLASS - 1, issued August 25, 2026.

Full violation description from the source extract

AT TIME OF INSPECTION GC FAILED TO DESIGNATE CONSTRUCTION SUPERINTENDENT OBSERVED MORE THAN 50% OF THE GROSS FLOOR AREA ALTERED + REMOVED AND REPLACED JOINTS. STOP ALL WORK ENTIRE SITE DESIGNATE CONSTRUCTION S

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Site Safety
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1G6 — BC 3301.13.3 FAILURE TO DESIGNATE AND/OR HAVE A CONSTRUCTION SUPERINTENDENT PRESENT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection GC FAILED TO DESIGNATE CONSTRUCTION SUPERINTENDENT OBSERVED MORE THAN 50% OF THE GROSS FLOOR AREA ALTERED + REMOVED AND REPLACED JOINTS. STOP ALL WORK ENTIRE SITE DESIGNATE CONSTRUCTION S.

What this violation means

This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.

What may be required to correct the condition

The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction.

What the OATH hearing may involve

Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.

Possible defenses or factual issues worth investigating

Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records.

Documents and evidence that may be useful

  • site-safety plans and temporary-construction drawings
  • daily logs and inspection reports
  • dated photographs/video
  • permit and superintendent/site-safety records
  • proof of correction/reinspection
Property-specific resolution support

How Building Violation LLC may help at 1220 Greene Avenue, Brooklyn, NY 11221

For 1220 Greene Avenue, Brooklyn, NY 11221, the current source extract points to structural or exterior maintenance, construction housekeeping / debris, construction-site safety. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.