November 2026 NYC DOB / ECB / OATH public-record review

128-39 233 Street, Queens, NY 11422 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 128-39 233 Street, Queens, NY 11422. The source records identify occupancy / illegal conversion, boiler compliance, plumbing or gas work without a permit and a hearing date of November 24, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Occupancy / illegal conversionBoiler compliancePlumbing or gas work without a permit

Property and hearing summary

Actual property address
128-39 233 Street, Queens, NY 11422
Borough
Queens
BIN
4277037
BBL
4128740023 (4/12874/23)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 24, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39204177N
Normalized: 039204177N
November 24, 2026
10:30 AM
CLASS - 1 Occupancy / illegal conversion
39204178P
Normalized: 039204178P
November 24, 2026
8:30 AM
CLASS - 1 Boiler compliance
39204179R
Normalized: 039204179R
November 24, 2026
9:30 AM
CLASS - 1 Plumbing or gas work without a permit
39204180Y
Normalized: 039204180Y
November 24, 2026
10:30 AM
CLASS - 1 Plumbing or gas work without a permit

How the summonses fit together at this property

The summonses appear to describe different enforcement components of a broader alteration/occupancy issue: the record includes an occupancy or conversion allegation together with unpermitted construction or trade work. Several descriptions point to the same area (cellar), which is a sign the summonses may be factually connected. A coordinated review should compare the legal occupancy, plans and permit history before deciding whether restoration or legalization is practical, while keeping each summons's hearing date and evidence separate.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39204177N — Occupancy / illegal conversion

Normalized lookup key: 039204177N
OATH hearingNovember 24, 202610:30 AM

What DOB alleges

DOB alleges that the property's observed use or dwelling configuration did not match the legal occupancy shown in the cited DOB record. The inspector's description specifically references cellar, partition walls, kitchen and Class A residential occupancy.

Specific record details: cellar, partition walls, kitchen, Class A residential occupancy.

Full violation description from the source extract

OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O. OBSERVED OPEN CELLAR CONVERTED/ SUBDIVIDE WITH FULL-HEIGHT PARTITIONS INTO A CLASS A APT (3-PIECE BATH, KITCHEN WITH SINK, AND 1 ROOM FOR SLEEPING), CONVERTING

Issue date
September 14, 2026
Served date
September 15, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning occupancy contrary to that allowed by the c of o. observed open cellar converted/ subdivide with full-height partitions into a class a apt (3-piece bath, kitchen with sink, and 1 room for sleeping), converting.

What this violation means

This type of summons concerns use or occupancy that DOB says is inconsistent with the approved Certificate of Occupancy or other legal-use record. The central question is not just what rooms exist, but whether the present dwelling/use configuration is legally authorized.

What may be required to correct the condition

A practical correction review usually starts by comparing the current layout and use with the Certificate of Occupancy, approved plans, I-card/MDR or other historical records. Depending on what the records allow, the path may involve restoration to the approved use or a legalization filing if zoning, egress, fire-safety and building-code requirements can be met. The legal-use record should be obtained before deciding whether the present configuration can remain.

What the OATH hearing may involve

For the OATH matter, useful questions include what legal-use record DOB relied on, what the inspector actually observed, whether the cited space was occupied as alleged on the inspection date, and whether photographs, leases, plans or historical records support or contradict the stated occupancy.

Possible defenses or factual issues worth investigating

Review the legal-use/occupancy history, the exact location cited, prior permits and alteration applications, and whether the source record accurately describes the number and type of dwelling units or the use of the cited space. Legalization should not be assumed until zoning and code feasibility are checked. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • Certificate of Occupancy or other legal-use record
  • approved plans and alteration applications
  • current photographs of the cited rooms/use
  • leases or occupancy records if relevant
  • prior permits, inspections and sign-offs
Violation 2

Summons 39204178P — Boiler compliance

Normalized lookup key: 039204178P
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges a boiler equipment or compliance condition. The inspector's description specifically references cellar and boiler room.

Specific record details: cellar, boiler room.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. OBSERVED ENCLOSED BOILER ROOM AT CELLAR IS NOT PROPERLY FIRE RATED AND DOES NOT HAVE THE PROPER FRESH AIR INTAKE. 2 HR FIRED WALLS AND DOOR IS NOT INSTAL

Issue date
September 14, 2026
Served date
September 15, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain building in a code complaint manner. observed enclosed boiler room at cellar is not properly fire rated and does not have the proper fresh air intake. 2 hr fired walls and door is not instal.

What this violation means

This summons concerns boiler equipment, inspection/filing obligations or another boiler-safety requirement. The correct path depends on whether the issue is a physical equipment condition, a missed compliance filing, an unregistered device or a permit-related problem.

What may be required to correct the condition

Verify the boiler/device record and the exact compliance obligation. A qualified boiler professional may need to inspect or repair the equipment, complete the required DOB NOW: Safety filing, address civil penalties, or correct device/permit records before the violation can be resolved.

What the OATH hearing may involve

Useful hearing records may include the boiler inspection filing history, device status, repair records, proof of timely filing, and evidence showing whether the cited obligation applied during the relevant cycle.

Possible defenses or factual issues worth investigating

Determine whether the issue is physical, filing-based or registration/permit-based; verify the applicable cycle and device; and confirm any later accepted filing or correction.

Documents and evidence that may be useful

  • DOB NOW boiler/device record
  • inspection reports and accepted filings
  • repair/service documentation
  • permit or registration records
  • proof of correction/payment/waiver where applicable
Violation 3

Summons 39204179R — Plumbing or gas work without a permit

Normalized lookup key: 039204179R
OATH hearingNovember 24, 20269:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references cellar, bathroom fixtures, kitchen, gas piping and plumbing lines/fixtures.

Specific record details: cellar, bathroom fixtures, kitchen, gas piping, plumbing lines/fixtures.

Full violation description from the source extract

WORK WITHOUT A PERMIT. OBSERVED AT CELLAR LEVEL WATER AND WASTE LINES FOR A 3-PC BATHROOM, WASHING MACHINE, KITCHEN WITH SINK, AND GAS LINE FOR DRYER. NO PLUMBING PERMIT ON FILE FOR WORK PERFORMED., OBTAIN PERM

Issue date
September 14, 2026
Served date
September 15, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work without a permit. observed at cellar level water and waste lines for a 3-pc bathroom, washing machine, kitchen with sink, and gas line for dryer. no plumbing permit on file for work performed., obtain perm.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 4

Summons 39204180Y — Plumbing or gas work without a permit

Normalized lookup key: 039204180Y
OATH hearingNovember 24, 202610:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references cellar, partition walls, bathroom fixtures, kitchen, Class A residential occupancy and apartment WITH.

Specific record details: cellar, partition walls, bathroom fixtures, kitchen, Class A residential occupancy, apartment WITH.

Full violation description from the source extract

WORK WITHOUT A PERMIT. OBSERVED FULL-HEIGHT PARTITIONS INSTALLED AT CELLAR, CREATING A CLASS A APT WITH A THREE-PIECE BATHROOM, KITCHEN WITH SINK AND A ROOM ARRANGED FOR SLEEPING. NO PERMIT ON FILE FOR CONSTRUC

Issue date
September 14, 2026
Served date
September 15, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work without a permit. observed full-height partitions installed at cellar, creating a class a apt with a three-piece bathroom, kitchen with sink and a room arranged for sleeping. no permit on file for construc.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Property-specific resolution support

How Building Violation LLC may help at 128-39 233 Street, Queens, NY 11422

For 128-39 233 Street, Queens, NY 11422, the current source extract points to occupancy / illegal conversion, boiler compliance, plumbing or gas work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.