November 2026 NYC DOB / ECB / OATH public-record review

131 Suffolk Avenue, Staten Island, NY 10314 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 131 Suffolk Avenue, Staten Island, NY 10314. The source records identify stop work order compliance, plumbing or gas work without a permit and a hearing date of November 24, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Stop Work Order compliancePlumbing or gas work without a permit

Property and hearing summary

Actual property address
131 Suffolk Avenue, Staten Island, NY 10314
Borough
Staten Island
BIN
5020948
BBL
5008050097 (5/805/97)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 24, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39152992H
Normalized: 039152992H
November 24, 2026
8:30 AM
CLASS - 1 Stop Work Order compliance
39152999K
Normalized: 039152999K
November 24, 2026
8:30 AM
CLASS - 1 Plumbing or gas work without a permit

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39152992H — Stop Work Order compliance

Normalized lookup key: 039152992H
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references Stop Work Order.

Specific record details: Stop Work Order. The description also references Stop Work Order IT.

Full violation description from the source extract

ATOI OBSERVED ONGOING WORK AGAINST THE POSTED STOP WORK ORDER. MEN INSIDE WORKING, OBSERVED ADDITIONAL WORKER GOING IN WITH TOOLS. INTERIOR DRYWALL IS SANDED FOR PAINT. AT TIME OF STOP WORK ORDER IT WAS JUST RO

Issue date
July 8, 2025
Served date
July 8, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed ongoing work against the posted stop work order. men inside working, observed additional worker going in with tools. interior drywall is sanded for paint. at time of stop work order it was just ro.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Violation 2

Summons 39152999K — Plumbing or gas work without a permit

Normalized lookup key: 039152999K
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references plumbing lines/fixtures and exposure 2.

Specific record details: plumbing lines/fixtures, exposure 2.

Full violation description from the source extract

ATOI OBSERVED PLUMBING EXTENDING OUT OF WALL AT CLOSET. PVC DRAIN LINE AND 2 COPPER STUBOUTS. ALSO PVC VENT MECHANICAL VENT LINES AT EXP 2 PROTRUDING FROM THE SIDING. NO PERMITS ON FILE., OBTAIN PERMIT

Issue date
July 8, 2025
Served date
July 8, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed plumbing extending out of wall at closet. pvc drain line and 2 copper stubouts. also pvc vent mechanical vent lines at exp 2 protruding from the siding. no permits on file.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Property-specific resolution support

How Building Violation LLC may help at 131 Suffolk Avenue, Staten Island, NY 10314

For 131 Suffolk Avenue, Staten Island, NY 10314, the current source extract points to stop work order compliance, plumbing or gas work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.