1329 42 Street, Brooklyn, NY 11219 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 3 DOB/ECB OATH summonses with 1329 42 Street, Brooklyn, NY 11219. The source records identify sidewalk shed / temporary construction protection, stop work order compliance, electrical work without a permit and a hearing date of November 17, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Sidewalk shed / temporary construction protectionStop Work Order complianceElectrical work without a permit

Property and hearing summary

Actual property address
1329 42 Street, Brooklyn, NY 11219
Borough
Brooklyn
BIN
3135773
BBL
3055940065 (3/5594/65)
Hearing month
November 2026
Violations on this page
3
Verified hearing date(s) in source extract
November 17, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39532095M
Normalized: 039532095M
November 17, 2026
8:30 AM
CLASS - 1 Sidewalk shed / temporary construction protection
39532096Y
Normalized: 039532096Y
November 17, 2026
8:30 AM
CLASS - 1 Stop Work Order compliance
39532097X
Normalized: 039532097X
November 17, 2026
8:30 AM
CLASS - 1 Electrical work without a permit

How the summonses fit together at this property

This property has 3 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39532095M — Sidewalk shed / temporary construction protection

Normalized lookup key: 039532095M
OATH hearingNovember 17, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references scaffold/shoring and exposure 1.

Specific record details: scaffold/shoring, exposure 1.

Full violation description from the source extract

BC 3314.4 FAILURE TO MAINTAIN SCAFFOLD AS PER CODE. OBSERVED SUPPORTED SCAFFOLD INSTALLED AT EXP#1 NOT AS PER CODE, SCAFFOLD HAS UNSAFE FOOTING RESTING ON DIAGONAL 2X10 WOOD PLANKS, MISSING CROSS BRACE, GUARDRA

Issue date
September 4, 2024
Served date
September 5, 2024
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning bc 3314.4 failure to maintain scaffold as per code. observed supported scaffold installed at exp#1 not as per code, scaffold has unsafe footing resting on diagonal 2x10 wood planks, missing cross brace, guardra.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 2

Summons 39532096Y — Stop Work Order compliance

Normalized lookup key: 039532096Y
OATH hearingNovember 17, 20268:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references Stop Work Order.

Specific record details: Stop Work Order. The description also references Stop Work Order FOR.

Full violation description from the source extract

OBSERVED BUILDING UNDER SWO FOR EXTERIOR AND INTERIOR WORK COMPLAINT#3923777 FOR RENOVATION/ENLARGEMENT WITHOUT A PERMIT. UPON REVIEW PREVIOUS PHOTOS TOOK ON 8/23/23 OBSERVED SITE WAS AT SUPERSTRUCTURE PHASE,AL

Issue date
September 4, 2024
Served date
September 5, 2024
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed building under swo for exterior and interior work complaint#3923777 for renovation/enlargement without a permit. upon review previous photos took on 8/23/23 observed site was at superstructure phase,al.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Violation 3

Summons 39532097X — Electrical work without a permit

Normalized lookup key: 039532097X
OATH hearingNovember 17, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references electrical wiring/equipment.

Specific record details: electrical wiring/equipment.

Full violation description from the source extract

OBSERVED ACTIVE SITE UNDER FULL RENOVATION, OBSERVED GENERAL ELECTRICAL WIRING WORK BEING DONE THROUGHOUT BUILDING. WORK CONSISTING OF LIGHTS, SWITCHES, OUTLETS AND ELECTRICAL PANEL. UPON ON A SEARCH ON BIS AND

Issue date
September 4, 2024
Served date
September 5, 2024
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed active site under full renovation, observed general electrical wiring work being done throughout building. work consisting of lights, switches, outlets and electrical panel. upon on a search on bis and.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Property-specific resolution support

How Building Violation LLC may help at 1329 42 Street, Brooklyn, NY 11219

For 1329 42 Street, Brooklyn, NY 11219, the current source extract points to sidewalk shed / temporary construction protection, stop work order compliance, electrical work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.