Summons 39202116K — Stop Work Order compliance
Normalized lookup key: 039202116KWhat DOB alleges
DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references second floor and electrical wiring/equipment.
Specific record details: second floor, electrical wiring/equipment.
Full violation description from the source extract
ATOI GAINED ACCESS INSIDE THE PROPERTY, SPOKE WITH THE PROJECT MANAGER, DID THE WALKTHROUGH. 2 MEN WORKING AT THE 2ND FLOOR OF PROPERTY. 1 WORKING WITH WINDOWS AND THE OTHER IS ELECTRICAL. THEY HAVE ACTIVE PERM
- Issue date
- August 27, 2026
- Served date
- August 27, 2026
- Source violation type
- Construction
- Severity
- CLASS - 1
- Hearing status in source extract
- PENDING
- 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi gained access inside the property, spoke with the project manager, did the walkthrough. 2 men working at the 2nd floor of property. 1 working with windows and the other is electrical. they have active perm.
What this violation means
The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.
What may be required to correct the condition
Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization. Because electrical work is mentioned, any correction plan should separately verify whether licensed electrical work, filing or inspection is required.
What the OATH hearing may involve
Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.
Possible defenses or factual issues worth investigating
Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active.
Documents and evidence that may be useful
- Stop Work Order and related DOB inspection records
- permits and approved plans
- site photographs and daily logs
- rescind/partial-rescind correspondence or approvals
- contractor and site-safety records