November 2026 NYC DOB / ECB / OATH public-record review

1351 Prospect Place, Brooklyn, NY 11213 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 1351 Prospect Place, Brooklyn, NY 11213. The source records identify construction housekeeping / debris, electrical work without a permit and a hearing date of November 18, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction housekeeping / debrisElectrical work without a permit

Property and hearing summary

Actual property address
1351 Prospect Place, Brooklyn, NY 11213
Borough
Brooklyn
BIN
3036056
BBL
3013600068 (3/1360/68)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 18, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39202766M
Normalized: 039202766M
November 18, 2026
10:30 AM
CLASS - 1 Construction housekeeping / debris
39202767Y
Normalized: 039202767Y
November 18, 2026
8:30 AM
CLASS - 1 Electrical work without a permit

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39202766M — Construction housekeeping / debris

Normalized lookup key: 039202766M
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references debris/housekeeping.

Specific record details: debris/housekeeping.

Full violation description from the source extract

ATOI OBSERVED EXCESSIVE DEBRIS @ EXPO 3. CONSISTING OF AIR COMPRESSOR, LADDERS, SAW, OLD WINDOWS, SCREENS AND A STEEL WINDOW GATE. TRASH BAGS, OLD WINDOW FRAMES, LUMBER AND CARDBOARD SCATTERED THROUGHOUT. FAILU

Issue date
September 2, 2026
Served date
September 2, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed excessive debris @ expo 3. consisting of air compressor, ladders, saw, old windows, screens and a steel window gate. trash bags, old window frames, lumber and cardboard scattered throughout. failu.

What this violation means

The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.

What may be required to correct the condition

Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.

What the OATH hearing may involve

Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.

Possible defenses or factual issues worth investigating

Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed.

Documents and evidence that may be useful

  • dated photographs
  • site-safety or housekeeping logs
  • hauling/disposal receipts
  • contractor records
  • proof of correction
Violation 2

Summons 39202767Y — Electrical work without a permit

Normalized lookup key: 039202767Y
OATH hearingNovember 18, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval.

Record context: source category Unknown, severity CLASS - 1, issued September 2, 2026.

Full violation description from the source extract

AT APPROX 9:30 AM OBSERVED 3 AC SPLIT UNITS @ EXPO 3. 2 UNITS ON 2ND FL AND 1 UNIT @ GROUND LEVEL. WORK IS 100% COMPLETE. NO PERMITS ON FILE FOR SCOPE OF WORK., OBTAIN PERMIT

Issue date
September 2, 2026
Served date
September 2, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at approx 9:30 am observed 3 ac split units @ expo 3. 2 units on 2nd fl and 1 unit @ ground level. work is 100% complete. no permits on file for scope of work.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Property-specific resolution support

How Building Violation LLC may help at 1351 Prospect Place, Brooklyn, NY 11213

For 1351 Prospect Place, Brooklyn, NY 11213, the current source extract points to construction housekeeping / debris, electrical work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.