November 2026 NYC DOB / ECB / OATH public-record review

1464 Bushwick Avenue, Brooklyn, NY 11207 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 1 DOB/ECB OATH summons with 1464 Bushwick Avenue, Brooklyn, NY 11207. The source records identify structural or exterior maintenance and a hearing date of November 25, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Structural or exterior maintenance

Property and hearing summary

Actual property address
1464 Bushwick Avenue, Brooklyn, NY 11207
Borough
Brooklyn
BIN
3398883
BBL
3034560031 (3/3456/31)
Hearing month
November 2026
Violations on this page
1
Verified hearing date(s) in source extract
November 25, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39203908N
Normalized: 039203908N
November 25, 2026
10:30 AM
CLASS - 1 Structural or exterior maintenance

How the summonses fit together at this property

This page contains one resolved summons for this property. Its source allegation concerns structural or exterior maintenance; the hearing and correction tracks should still be treated separately, because resolving the physical condition does not by itself prove the OATH/DOB record has been closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39203908N — Structural or exterior maintenance

Normalized lookup key: 039203908N
OATH hearingNovember 25, 202610:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component. The inspector's description specifically references rear area and exposure 3.

Specific record details: rear area, exposure 3.

Full violation description from the source extract

NOTED AT THE TIME OF INSPECTION, THE SOFFIT PANELS AT THE BALCONIES SERVING APARTMENTS 3R, LOCATED AT EXPOSURE #3 (REAR FACADE) OF THE PROPERTY, WERE OBSERVED TO BE IN A STATE OF DISREPAIR, WITH PORTIONS DISLOD

Issue date
September 14, 2026
Served date
September 14, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning noted at the time of inspection, the soffit panels at the balconies serving apartments 3r, located at exposure #3 (rear facade) of the property, were observed to be in a state of disrepair, with portions dislod.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Property-specific resolution support

How Building Violation LLC may help at 1464 Bushwick Avenue, Brooklyn, NY 11207

For 1464 Bushwick Avenue, Brooklyn, NY 11207, the current source extract points to structural or exterior maintenance. The engagement can stay focused on this summons while also checking the underlying DOB record so the physical correction and agency closeout are not treated as the same step. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.