November 2026 NYC DOB / ECB / OATH public-record review

1465 Amsterdam Avenue, Manhattan, NY 10027 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 1465 Amsterdam Avenue, Manhattan, NY 10027. The source records identify certificate of correction / compliance filing, structural or exterior maintenance and a hearing date of November 5, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Certificate of Correction / compliance filingStructural or exterior maintenance

Property and hearing summary

Actual property address
1465 Amsterdam Avenue, Manhattan, NY 10027
Borough
Manhattan
BIN
1059637
BBL
1019700067 (1/1970/67)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 5, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39184061X
Normalized: 039184061X
November 5, 2026
8:30 AM
CLASS - 2 Certificate of Correction / compliance filing
39184062H
Normalized: 039184062H
November 5, 2026
8:30 AM
CLASS - 1 Structural or exterior maintenance

How the summonses fit together at this property

At least one summons concerns failure to file or obtain acceptance of a Certificate of Correction. That later compliance issue should be cross-checked against the underlying summons it references; paying or resolving one record does not automatically establish that the other record is closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39184061X — Certificate of Correction / compliance filing

Normalized lookup key: 039184061X
OATH hearingNovember 5, 20268:30 AM

What DOB alleges

DOB alleges that a required Certificate of Correction was not filed or accepted for an earlier summons. The inspector's description specifically references Certificate of Correction.

Specific record details: Certificate of Correction.

Full violation description from the source extract

FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39518668J ISSUED ON 07-03-2023 FOR FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER., FILE A CERTIFICATE OF CORRECTION

Issue date
April 10, 2026
Served date
April 10, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 263 — AC 28-204.4 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE CERT OF CORRECTION W/DOB

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to submit certificate of correction of violation #39518668j issued on 07-03-2023 for failure to maintain building in code-complaint manner., file a certificate of correction.

What this violation means

This summons alleges failure to comply with a prior Commissioner's order by filing an acceptable Certificate of Correction for an earlier summons. The underlying violation and the later compliance summons are separate records that should be tracked together.

What may be required to correct the condition

First identify the underlying summons referenced in the description and verify whether the physical condition was corrected, whether a Certificate of Correction was submitted, and its current DOB status. If correction is still outstanding, the underlying condition generally has to be addressed before an acceptable certification package can be completed.

What the OATH hearing may involve

The hearing may turn on the status of the underlying summons, the order to certify correction, the timing and adequacy of any submission, and whether DOB records show an accepted, rejected or missing Certificate of Correction.

Possible defenses or factual issues worth investigating

Verify the underlying summons number, correction deadline/order, any prior Certificate of Correction request, disapproval reason, and whether later agency activity changed the status. Do not assume payment of an OATH penalty closed the DOB correction requirement.

Documents and evidence that may be useful

  • copy/status of the underlying summons
  • Certificate of Correction submission and DOB response
  • proof of physical correction such as photographs, receipts or permits
  • DOB NOW/BIS status records
  • OATH disposition and payment records if relevant
Violation 2

Summons 39184062H — Structural or exterior maintenance

Normalized lookup key: 039184062H
OATH hearingNovember 5, 20268:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component. The inspector's description specifically references Certificate of Correction.

Specific record details: Certificate of Correction.

Full violation description from the source extract

FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39518669L ISSUED ON 07-03-2023 FOR FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES., REPAIR AND/REPLACE

Issue date
April 10, 2026
Served date
April 10, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to submit certificate of correction of violation #39518669l issued on 07-03-2023 for failure to maintain building wall(s) or appurtenances., repair and/replace.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Property-specific resolution support

How Building Violation LLC may help at 1465 Amsterdam Avenue, Manhattan, NY 10027

For 1465 Amsterdam Avenue, Manhattan, NY 10027, the current source extract points to certificate of correction / compliance filing, structural or exterior maintenance. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.