November 2026 NYC DOB / ECB / OATH public-record review

150-50 77 Road, Queens, NY 11367 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 6 DOB/ECB OATH summonses with 150-50 77 Road, Queens, NY 11367. The source records identify occupancy / illegal conversion, plumbing or gas work without a permit, electrical work without a permit and a hearing date of November 10, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Occupancy / illegal conversionPlumbing or gas work without a permitElectrical work without a permitEgress / fire-escape obstruction

Property and hearing summary

Actual property address
150-50 77 Road, Queens, NY 11367
Borough
Queens
BIN
4145085
BBL
4067090063 (4/6709/63)
Hearing month
November 2026
Violations on this page
6
Verified hearing date(s) in source extract
November 10, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
35729433J
Normalized: 035729433J
November 10, 2026
8:30 AM
CLASS - 1 Occupancy / illegal conversion
35729434L
Normalized: 035729434L
November 10, 2026
8:30 AM
CLASS - 2 Plumbing or gas work without a permit
35729435N
Normalized: 035729435N
November 10, 2026
8:30 AM
CLASS - 1 Plumbing or gas work without a permit
35729436P
Normalized: 035729436P
November 10, 2026
8:30 AM
CLASS - 2 Electrical work without a permit
35729437R
Normalized: 035729437R
November 10, 2026
8:30 AM
CLASS - 1 Egress / fire-escape obstruction
35729438Z
Normalized: 035729438Z
November 10, 2026
8:30 AM
CLASS - 1 Failure to maintain

How the summonses fit together at this property

The summonses appear to describe different enforcement components of a broader alteration/occupancy issue: the record includes an occupancy or conversion allegation together with unpermitted construction or trade work. Several descriptions point to the same area (cellar), which is a sign the summonses may be factually connected. A coordinated review should compare the legal occupancy, plans and permit history before deciding whether restoration or legalization is practical, while keeping each summons's hearing date and evidence separate.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 35729433J — Occupancy / illegal conversion

Normalized lookup key: 035729433J
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that the property's observed use or dwelling configuration did not match the legal occupancy shown in the cited DOB record. The inspector's description specifically references cellar, bedroom(s), bathroom fixtures, kitchen and Class A residential occupancy.

Specific record details: cellar, bedroom(s), bathroom fixtures, kitchen, Class A residential occupancy.

Full violation description from the source extract

OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT OF BUILDINGS RECORDS. ILLEGAL OCCUPANCY NOTED: AT CELLAR LEVEL HAS BEEN CONVERTED/OCCUPIED ASA CLASS "A" APARTMENT WITH FULL KITCHEN, BATHROOM, BEDROOM. REMEDY: DI

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at cellar level has been converted/occupied asa class "a" apartment with full kitchen, bathroom, bedroom.

What this violation means

This type of summons concerns use or occupancy that DOB says is inconsistent with the approved Certificate of Occupancy or other legal-use record. The central question is not just what rooms exist, but whether the present dwelling/use configuration is legally authorized.

What may be required to correct the condition

A practical correction review usually starts by comparing the current layout and use with the Certificate of Occupancy, approved plans, I-card/MDR or other historical records. Depending on what the records allow, the path may involve restoration to the approved use or a legalization filing if zoning, egress, fire-safety and building-code requirements can be met. The legal-use record should be obtained before deciding whether the present configuration can remain.

What the OATH hearing may involve

For the OATH matter, useful questions include what legal-use record DOB relied on, what the inspector actually observed, whether the cited space was occupied as alleged on the inspection date, and whether photographs, leases, plans or historical records support or contradict the stated occupancy.

Possible defenses or factual issues worth investigating

Review the legal-use/occupancy history, the exact location cited, prior permits and alteration applications, and whether the source record accurately describes the number and type of dwelling units or the use of the cited space. Legalization should not be assumed until zoning and code feasibility are checked. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • Certificate of Occupancy or other legal-use record
  • approved plans and alteration applications
  • current photographs of the cited rooms/use
  • leases or occupancy records if relevant
  • prior permits, inspections and sign-offs
Violation 2

Summons 35729434L — Plumbing or gas work without a permit

Normalized lookup key: 035729434L
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references cellar, partition walls and bathroom fixtures.

Specific record details: cellar, partition walls, bathroom fixtures.

Full violation description from the source extract

WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL HAVING CREATED PARTITION WALLS TO CREATE BATHROOM. REMEDY: OBTAIN REQUIRED PERMIT.

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at cellar level having created partition walls to create bathroom.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 3

Summons 35729435N — Plumbing or gas work without a permit

Normalized lookup key: 035729435N
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references cellar, stove and plumbing lines/fixtures.

Specific record details: cellar, stove, plumbing lines/fixtures.

Full violation description from the source extract

WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL INSTALLED WATER ANDWASTE LINES FOR TOILET, SHOWER AND COMMERCIAL SINK; INSTALLED GAS LINEFOR GAS STOVE. REMEDY: OBTAIN REQUIRED PERMIT.

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at cellar level installed water andwaste lines for toilet, shower and commercial sink; installed gas linefor gas stove.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 4

Summons 35729436P — Electrical work without a permit

Normalized lookup key: 035729436P
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references cellar and electrical wiring/equipment.

Specific record details: cellar, electrical wiring/equipment.

Full violation description from the source extract

WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL INSTALLED ELECTRICAL LINES FOR LIGHTS, SWITCHES AND OUTLETS. REMEDY: OBTAIN REQUIRED PERMIT.

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at cellar level installed electrical lines for lights, switches and outlets.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 5

Summons 35729437R — Egress / fire-escape obstruction

Normalized lookup key: 035729437R
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that a required exit, fire-escape or egress route was obstructed or otherwise noncompliant. The inspector's description specifically references Class A residential occupancy and apartment A.

Specific record details: Class A residential occupancy, apartment A.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF REQUIERED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC 1018.1(2008 CODE);27-366; BC 1021.1(2014 CODE), BC 1006.3(2022 CODE) FOR CLASS "A"-APT A

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 189 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. FAILURE TO PR

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain building in code-compliant manner. lack of requiered number of means of egress for every floor per bc 1018.1(2008 code);27-366; bc 1021.1(2014 code), bc 1006.3(2022 code) for class "a"-apt a.

What this violation means

DOB is alleging that required egress or a fire-escape route was obstructed or otherwise did not provide the required clear path. Egress conditions are life-safety issues and the exact route/location described matters.

What may be required to correct the condition

The cited path should be cleared or restored so required egress is unobstructed. If the issue involves construction, stairs, doors, fire escapes or layout rather than movable objects, professional review and permits may be needed before the condition can be considered corrected. Any correction should preserve the required egress route rather than simply moving the problem to another part of the exit system.

What the OATH hearing may involve

At OATH, photographs from the inspection date, floor/egress plans, evidence showing whether the obstruction existed, and proof of prompt correction can be relevant.

Possible defenses or factual issues worth investigating

Verify the exact egress route, whether the objects/condition actually reduced the required path, whether the cited area was a required exit component, and whether the condition had been corrected before or after service.

Documents and evidence that may be useful

  • dated photographs of the cited egress route
  • approved floor/egress plans where applicable
  • repair/removal records
  • inspection reports
  • proof of correction
Violation 6

Summons 35729438Z — Failure to maintain

Normalized lookup key: 035729438Z
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges failure to maintain the cited building component or condition in a code-compliant manner. The inspector's description specifically references cellar and bedroom(s).

Specific record details: cellar, bedroom(s).

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO PROVIDE REQUIRED NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM. NOTED: AT CELLAR LEVEL HAVING

Issue date
August 25, 2026
Served date
August 25, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at cellar level having.

What this violation means

DOB is alleging failure to maintain the building or a building component in a code-compliant condition. The broad label matters less than the particular defect described by the inspector.

What may be required to correct the condition

The cited component should be inspected and repaired by the appropriate qualified contractor or licensed/registered professional where the work requires it. Permits or filings may be needed if the repair goes beyond ordinary maintenance.

What the OATH hearing may involve

The strongest factual material usually concerns the exact condition on the inspection date: photographs, maintenance records, professional reports, repair invoices and proof of correction.

Possible defenses or factual issues worth investigating

Focus on the precise component and location in the description, whether the defect existed as alleged, whether the owner/respondent controlled that area, and whether later inspection or repair records clarify the condition.

Documents and evidence that may be useful

  • dated photographs
  • maintenance and repair records
  • contractor or professional reports
  • permits/inspection records if repair work required them
  • proof of correction
Property-specific resolution support

How Building Violation LLC may help at 150-50 77 Road, Queens, NY 11367

For 150-50 77 Road, Queens, NY 11367, the current source extract points to occupancy / illegal conversion, plumbing or gas work without a permit, electrical work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.