November 2026 NYC DOB / ECB / OATH public-record review

1538 Silver Street, Bronx, NY 10461 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 1538 Silver Street, Bronx, NY 10461. The source records identify work without a permit, fire-safety condition and a hearing date of November 13, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permitFire-safety condition

Property and hearing summary

Actual property address
1538 Silver Street, Bronx, NY 10461
Borough
Bronx
BIN
2044124
BBL
2040770024 (2/4077/24)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 13, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39181923R
Normalized: 039181923R
November 13, 2026
8:30 AM
CLASS - 1 Work without a permit
39181924Z
Normalized: 039181924Z
November 13, 2026
8:30 AM
CLASS - 1 Fire-safety condition

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39181923R — Work without a permit

Normalized lookup key: 039181923R
OATH hearingNovember 13, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references debris/housekeeping.

Specific record details: debris/housekeeping.

Full violation description from the source extract

AT THE TIME OF INSPECTION, THE FIRST FLOOR WAS OBSERVED TO BE FULLY GUTTED (APPROXIMATELY 90% COMPLETE), WITH EXCESSIVE CONSTRUCTION DEBRIS SCATTERED ON THE FLOOR, CONSTITUTING DEMOLITION WITHOUT A PERMIT. OBSE

Issue date
March 26, 2026
Served date
March 26, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the time of inspection, the first floor was observed to be fully gutted (approximately 90% complete), with excessive construction debris scattered on the floor, constituting demolition without a permit. obse.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 2

Summons 39181924Z — Fire-safety condition

Normalized lookup key: 039181924Z
OATH hearingNovember 13, 20268:30 AM

What DOB alleges

DOB alleges a fire-safety or fire-hazard condition. The inspector's description specifically references rear area and debris/housekeeping.

Specific record details: rear area, debris/housekeeping.

Full violation description from the source extract

AT THE TIME OF INSPECTION, AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS WAS PILED UP AT THE REAR OF THE PROPERTY (EXPOSURE THREE), PRESENTING A POTENTIAL FIRE HAZARD AND VIOLATION FOR FAILURE TO MAINTAIN PROPER S

Issue date
March 26, 2026
Served date
March 26, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the time of inspection, an excessive amount of construction debris was piled up at the rear of the property (exposure three), presenting a potential fire hazard and violation for failure to maintain proper s.

What this violation means

DOB is alleging a fire-safety or fire-hazard condition, such as combustible storage, a required fire-protection component, or another condition that could affect fire spread or safe operation of the building.

What may be required to correct the condition

The cited fire-hazard condition should be removed or corrected promptly. If the condition involves a building system or rated construction rather than simple housekeeping, the applicable approved plans, fire-protection requirements and licensed-professional/trade work should be reviewed.

What the OATH hearing may involve

Hearing evidence may include photographs from the inspection date, proof of removal/repair, fire-protection plans or system records, and documentation showing who controlled the cited area.

Possible defenses or factual issues worth investigating

Verify the specific hazard, location, whether it was present as described, whether it was transient storage or a permanent condition, and whether any building-system repair or permit was required.

Documents and evidence that may be useful

  • dated photographs
  • fire-protection/system records where relevant
  • repair/removal invoices
  • approved plans if rated construction or equipment is involved
  • proof of correction
Property-specific resolution support

How Building Violation LLC may help at 1538 Silver Street, Bronx, NY 10461

For 1538 Silver Street, Bronx, NY 10461, the current source extract points to work without a permit, fire-safety condition. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.