Summons 39202356J — Fire-safety condition
Normalized lookup key: 039202356JWhat DOB alleges
DOB alleges a fire-safety or fire-hazard condition. The inspector's description specifically references cellar and electrical wiring/equipment.
Specific record details: cellar, electrical wiring/equipment.
Full violation description from the source extract
AT TIME OF INSPECTION OBSERVED SPRINKLER SYSTEM OS&Y VALVE IN CLOSED POSITION AT CELLAR LEVEL. EXPOSED ELECTRICAL WIRES AND UNCAPPED GAS LINES AT MULTIPLE LOCATIONS THROUGHOUT. DAMAGED/MISSING FIRE RATED MATERI
- Issue date
- August 28, 2026
- Served date
- August 29, 2026
- Source violation type
- Construction
- Severity
- CLASS - 1
- Hearing status in source extract
- PENDING
- 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED SPRINKLER SYSTEM OS&Y VALVE IN CLOSED POSITION AT CELLAR LEVEL. EXPOSED ELECTRICAL WIRES AND UNCAPPED GAS LINES AT MULTIPLE LOCATIONS THROUGHOUT. DAMAGED/MISSING FIRE RATED MATERI.
What this violation means
DOB is alleging a fire-safety or fire-hazard condition, such as combustible storage, a required fire-protection component, or another condition that could affect fire spread or safe operation of the building.
What may be required to correct the condition
The cited fire-hazard condition should be removed or corrected promptly. If the condition involves a building system or rated construction rather than simple housekeeping, the applicable approved plans, fire-protection requirements and licensed-professional/trade work should be reviewed. Because electrical work is mentioned, any correction plan should separately verify whether licensed electrical work, filing or inspection is required.
What the OATH hearing may involve
Hearing evidence may include photographs from the inspection date, proof of removal/repair, fire-protection plans or system records, and documentation showing who controlled the cited area.
Possible defenses or factual issues worth investigating
Verify the specific hazard, location, whether it was present as described, whether it was transient storage or a permanent condition, and whether any building-system repair or permit was required.
Documents and evidence that may be useful
- dated photographs
- fire-protection/system records where relevant
- repair/removal invoices
- approved plans if rated construction or equipment is involved
- proof of correction