November 2026 NYC DOB / ECB / OATH public-record review

1623 East 37 Street, Brooklyn, NY 11234 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 1623 East 37 Street, Brooklyn, NY 11234. The source records identify construction-site safety, work without a permit and a hearing date of November 10, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Construction-site safetyWork without a permit

Property and hearing summary

Actual property address
1623 East 37 Street, Brooklyn, NY 11234
Borough
Brooklyn
BIN
3212504
BBL
3077100029 (3/7710/29)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 10, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39118080X
Normalized: 039118080X
November 10, 2026
8:30 AM
CLASS - 1 Construction-site safety
39118081H
Normalized: 039118081H
November 10, 2026
8:30 AM
CLASS - 1 Work without a permit

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (cellar), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39118080X — Construction-site safety

Normalized lookup key: 039118080X
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges a construction-site safety or safeguarding deficiency. The inspector's description specifically references cellar, rear area, railing/guard condition and excavation.

Specific record details: cellar, rear area, railing/guard condition, excavation.

Full violation description from the source extract

FAILURE TO SAFEGUARD ALL PERSONS AND PROPERLY AFFECTED BY CONSTRUCTION OPERATIONS: AT REAR OF THE BUILDING EXCAVATION / CMU WALL WITH STEPS ONTO THE CELLAR NO RAILING TO SAFEGUARD FOR PUBLIC AND PROPERTY., SAFE

Issue date
June 28, 2024
Served date
June 28, 2024
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to safeguard all persons and properly affected by construction operations: at rear of the building excavation / cmu wall with steps onto the cellar no railing to safeguard for public and property., safe.

What this violation means

This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.

What may be required to correct the condition

The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction.

What the OATH hearing may involve

Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.

Possible defenses or factual issues worth investigating

Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • site-safety plans and temporary-construction drawings
  • daily logs and inspection reports
  • dated photographs/video
  • permit and superintendent/site-safety records
  • proof of correction/reinspection
Violation 2

Summons 39118081H — Work without a permit

Normalized lookup key: 039118081H
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references cellar, rear yard, rear area and excavation.

Specific record details: cellar, rear yard, rear area, excavation. The description also references Stop Work Order ON.

Full violation description from the source extract

WORK WITHOUT A PERMIT AT REAR YARD FOR EXCAVATION/CMU FOUNDATION ONTO CELLAR WITH DOOR ATTACHED, FAILURE TO SAFEGUARD RAILINGS TO CELLAR, FOOTING FOR DECKING WITHOUT A PERMITS. PSWO ON SITE., OBTAIN PERMIT; OBT

Issue date
June 28, 2024
Served date
June 28, 2024
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work without a permit at rear yard for excavation/cmu foundation onto cellar with door attached, failure to safeguard railings to cellar, footing for decking without a permits. pswo on site.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Property-specific resolution support

How Building Violation LLC may help at 1623 East 37 Street, Brooklyn, NY 11234

For 1623 East 37 Street, Brooklyn, NY 11234, the current source extract points to construction-site safety, work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.