November 2026 NYC DOB / ECB / OATH public-record review

168 Bradford Street, Brooklyn, NY 11207 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 9 DOB/ECB OATH summonses with 168 Bradford Street, Brooklyn, NY 11207. The source records identify dob/oath code-compliance issue, plumbing or gas work without a permit, structural or exterior maintenance and hearing dates on November 2, 2026, November 20, 2026 and November 24, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

DOB/OATH code-compliance issuePlumbing or gas work without a permitStructural or exterior maintenanceVacate order compliance

Property and hearing summary

Actual property address
168 Bradford Street, Brooklyn, NY 11207
Borough
Brooklyn
BIN
3083569
BBL
3036900022 (3/3690/22)
Hearing month
November 2026
Violations on this page
9
Verified hearing date(s) in source extract
November 2, 2026, November 20, 2026, November 24, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
35309299R
Normalized: 035309299R
November 2, 2026
8:30 AM
CLASS - 1 DOB/OATH code-compliance issue
35323251Z
Normalized: 035323251Z
November 2, 2026
8:30 AM
CLASS - 1 Plumbing or gas work without a permit
35330646Z
Normalized: 035330646Z
November 2, 2026
8:30 AM
CLASS - 1 Structural or exterior maintenance
35383970J
Normalized: 035383970J
November 2, 2026
8:30 AM
CLASS - 1 Vacate order compliance
35386491X
Normalized: 035386491X
November 2, 2026
8:30 AM
CLASS - 2 Construction housekeeping / debris
35546257H
Normalized: 035546257H
November 2, 2026
8:30 AM
CLASS - 1 Structural or exterior maintenance
35546258J
Normalized: 035546258J
November 2, 2026
8:30 AM
CLASS - 1 Structural or exterior maintenance
35362021P
Normalized: 035362021P
November 20, 2026
8:30 AM
CLASS - 1 Structural or exterior maintenance
35452426M
Normalized: 035452426M
November 24, 2026
8:30 AM
CLASS - 1 Vacate order compliance

How the summonses fit together at this property

This property has 9 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (cellar, roof), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 35309299R — DOB/OATH code-compliance issue

Normalized lookup key: 035309299R
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition. The inspector's description specifically references cellar and dwelling/occupancy configuration.

Specific record details: cellar, dwelling/occupancy configuration.

Full violation description from the source extract

SEC: 28-210.1. RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FROM 1 OR 2 FAMILIES TO 4 OR MORE FAMILIES. NOTED: PREMISE IS A 1 FAMILY HOME HAVING ADDITIONAL APT (SPACE) ON 2TH FLR, 3 ILLEGAL SRO'S @ CELLAR LEVE

Issue date
March 26, 2018
Served date
March 26, 2018
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning premise is a 1 family home having additional apt (space) on 2th flr, 3 illegal sro's @ cellar leve.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 2

Summons 35323251Z — Plumbing or gas work without a permit

Normalized lookup key: 035323251Z
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references cellar, second floor, partition walls, bathroom fixtures, kitchen, plumbing lines/fixtures and Class A residential occupancy.

Specific record details: cellar, second floor, partition walls, bathroom fixtures, kitchen, plumbing lines/fixtures, Class A residential occupancy.

Full violation description from the source extract

WORK W/OUT A PERMIT(S) @ CELLAR LEVEL ERECTED FULL HEIGHT PARTITIONS CREATING A 3 SRO'S @ 2ND FLR ERECTED FULL HEIGHT PARTITIONS CREATING CLASS 'A' APT W/ ADDITIONAL KITCHEN & BATHROOM W/ FELL PLUMBING & ELECTR

Issue date
March 26, 2018
Served date
March 26, 2018
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work w/out a permit(s) @ cellar level erected full height partitions creating a 3 sro's @ 2nd floor erected full height partitions creating class 'a' apt w/ additional kitchen & bathroom w/ fell plumbing & electr.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 3

Summons 35330646Z — Structural or exterior maintenance

Normalized lookup key: 035330646Z
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component. The inspector's description specifically references roof and exposure 4.

Specific record details: roof, exposure 4.

Full violation description from the source extract

FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES,OBSERVED AT EXP#4 WALL IN DISREPAIR AT 2ND LEVEL HOLE AT WALL & ROOF. OPEN TO WEATHER CONDITIONS VINYL LOOSE & MISSING. REMEDY: MAINTAIN EXTERIOR BLDG WALL.

Issue date
May 11, 2018
Served date
May 11, 2018
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain bldg walls or appurtenances,observed at exp#4 wall in disrepair at 2nd level hole at wall & roof. open to weather conditions vinyl loose & missing.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Violation 4

Summons 35383970J — Vacate order compliance

Normalized lookup key: 035383970J
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges that a Vacate Order was not obeyed at the cited premises or area.

Record context: source category Construction, severity CLASS - 1, issued February 15, 2019.

Full violation description from the source extract

REMOVEL ON DEFACED A WRITTEN POSTED VACATE STICKER/ORDER. NOTED: OBSERVED OVER 3 WORKERS OCCUPYING THIS PROPERTY NO VACATRE STICKER PLACED ON DOOR. REMEDY: COMPLY W/CODE.

Issue date
February 15, 2019
Served date
February 15, 2019
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 1G1 — 28-207.4.4 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed over 3 workers occupying this property no vacatre sticker placed on door.

What this violation means

DOB is alleging noncompliance with a Vacate Order—typically that a space subject to an order was occupied or used contrary to the restriction. Vacate-order issues are safety-sensitive and should be verified against the exact order.

What may be required to correct the condition

The current Vacate Order, the area it covers, and the conditions required for rescission should be reviewed before occupancy resumes. Correction may involve building work, permits, professional reports, inspections and a formal DOB process to lift or modify the order.

What the OATH hearing may involve

At OATH, the exact order, its effective date and scope, the inspector's observation of occupancy/use, and any evidence that the order had been rescinded or did not cover the cited area may matter.

Possible defenses or factual issues worth investigating

Confirm the order number, premises/area covered, whether it was still effective on the inspection date, and what DOB required for rescission. If occupancy is disputed, gather contemporaneous evidence rather than relying on assumptions.

Documents and evidence that may be useful

  • the Vacate Order and any amendments/rescission notice
  • DOB inspection or reinspection records
  • photographs and access/occupancy evidence
  • permits, plans and professional reports used to correct the unsafe condition
  • communications or filings seeking rescission
Violation 5

Summons 35386491X — Construction housekeeping / debris

Normalized lookup key: 035386491X
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references rear yard, rear area and debris/housekeeping.

Specific record details: rear yard, rear area, debris/housekeeping.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: AT REAR YARD THERE IS A LOT OF DEBRIS, TOILETS, SINKS, CORRUGATED METAL CONSTRUCTION SCAFFLE, WOOD 2X4S, CHAIRS AND GARBAGE. RMDY: REPAIR AND/OR REPLACE.

Issue date
February 15, 2019
Served date
March 1, 2019
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain building in code-compliant manner: at rear yard there is a lot of debris, toilets, sinks, corrugated metal construction scaffle, wood 2x4s, chairs and garbage. rmdy:.

What this violation means

The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.

What may be required to correct the condition

Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.

What the OATH hearing may involve

Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.

Possible defenses or factual issues worth investigating

Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • dated photographs
  • site-safety or housekeeping logs
  • hauling/disposal receipts
  • contractor records
  • proof of correction
Violation 6

Summons 35546257H — Structural or exterior maintenance

Normalized lookup key: 035546257H
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component. The inspector's description specifically references first floor.

Specific record details: first floor.

Full violation description from the source extract

FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES.NOTED:1ST FLOOR ON THESIDE IS OPEN TO ELEMENTS,RODENTS,ETC.2ND LEVEL WINDOWS OPEN TO ELEMENTS AND RODENTS.ACCESSIBLE TO THE PUBLIC.REMEDY:MAINTAIN BUILDING WALLS

Issue date
December 16, 2020
Served date
December 16, 2020
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning 1st floor on theside is open to elements,rodents,etc.2nd level windows open to elements and rodents.accessible to the public.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Violation 7

Summons 35546258J — Structural or exterior maintenance

Normalized lookup key: 035546258J
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component. The inspector's description specifically references first floor and second floor.

Specific record details: first floor, second floor.

Full violation description from the source extract

FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES.NOTED:1ST FLOOR DOOR IS OPEN TO ELEMENTS.WINDOWS ON 2ND FLOOR IS OPEN TO ELEMENTS.ACCESSIBLETO THE PUBLIC.REMEDY:MAINTAIN BUILDING WALLS.

Issue date
December 16, 2020
Served date
December 16, 2020
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning 1st floor door is open to elements.windows on 2nd floor is open to elements.accessibleto the public.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Violation 8

Summons 35362021P — Structural or exterior maintenance

Normalized lookup key: 035362021P
OATH hearingNovember 20, 20268:30 AM

What DOB alleges

DOB alleges a maintenance or safety defect involving a structural/exterior building component. The inspector's description specifically references roof and exposure 4.

Specific record details: roof, exposure 4.

Full violation description from the source extract

REISSUED 35342538J FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCESNOTED AT EXP 4 WALL IN DISREPAIR AT 2ND FL HOLE IN ROOF OPEN TO WEATHER VINYL SIDING MISSING&LOOSE. REMEDY:MAINTAIN EXTERIOR BUILDING WALLS

Issue date
November 7, 2018
Served date
November 7, 2018
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning reissued 35342538j failure to maintain building walls or appurtenancesnoted at exp 4 wall in disrepair at 2nd fl hole in roof open to weather vinyl siding missing&loose.

What this violation means

This violation concerns maintenance of a structural, masonry, exterior-wall, railing, parapet or similar building component. The significance depends on the exact defect and whether it presents a falling, stability or weather-protection hazard.

What may be required to correct the condition

The condition should be evaluated by the appropriate qualified contractor and, where structural judgment is required, a registered architect or professional engineer. Repairs may require drawings, permits, probes, controlled-access protection or inspections depending on the scope.

What the OATH hearing may involve

The hearing may involve the physical condition observed, its location and severity, photographs, professional reports, maintenance history and proof of repair.

Possible defenses or factual issues worth investigating

Confirm the exact component and location, whether the defect existed as described, whether emergency protection was installed, and whether a professional assessment or later repair documents the true condition.

Documents and evidence that may be useful

  • dated photographs
  • architect/engineer reports if structural issues are involved
  • repair contracts/invoices
  • permits and inspection records
  • maintenance or prior repair records
Violation 9

Summons 35452426M — Vacate order compliance

Normalized lookup key: 035452426M
OATH hearingNovember 24, 20268:30 AM

What DOB alleges

DOB alleges that a Vacate Order was not obeyed at the cited premises or area. The inspector's description specifically references front area and Vacate Order.

Specific record details: front area, Vacate Order. The description also references Vacate Order FROM.

Full violation description from the source extract

FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER PER 28-207.4@TIMEOF INSPECTION OBSERVED,2 MEN EXITING THE PREMISES FROM THE FRONT DOOR.THE BLDG IS ON A FULL VACATE ORDER FOR FIRE AND ILLEGAL SROS.VACATE OR

Issue date
September 10, 2019
Served date
October 1, 2019
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1F9 — 28-207.4 FAILURE TO OBEY A VACATE ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to obey a vacate order from the commissioner per 28-207.4@timeof inspection observed,2 men exiting the premises from the front door.the bldg is on a full vacate order for fire and illegal sros.vacate or.

What this violation means

DOB is alleging noncompliance with a Vacate Order—typically that a space subject to an order was occupied or used contrary to the restriction. Vacate-order issues are safety-sensitive and should be verified against the exact order.

What may be required to correct the condition

The current Vacate Order, the area it covers, and the conditions required for rescission should be reviewed before occupancy resumes. Correction may involve building work, permits, professional reports, inspections and a formal DOB process to lift or modify the order.

What the OATH hearing may involve

At OATH, the exact order, its effective date and scope, the inspector's observation of occupancy/use, and any evidence that the order had been rescinded or did not cover the cited area may matter.

Possible defenses or factual issues worth investigating

Confirm the order number, premises/area covered, whether it was still effective on the inspection date, and what DOB required for rescission. If occupancy is disputed, gather contemporaneous evidence rather than relying on assumptions. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • the Vacate Order and any amendments/rescission notice
  • DOB inspection or reinspection records
  • photographs and access/occupancy evidence
  • permits, plans and professional reports used to correct the unsafe condition
  • communications or filings seeking rescission
Property-specific resolution support

How Building Violation LLC may help at 168 Bradford Street, Brooklyn, NY 11207

For 168 Bradford Street, Brooklyn, NY 11207, the current source extract points to dob/oath code-compliance issue, plumbing or gas work without a permit, structural or exterior maintenance. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.