November 2026 NYC DOB / ECB / OATH public-record review

1721 East 2 Street, Brooklyn, NY 11223 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 1721 East 2 Street, Brooklyn, NY 11223. The source records identify stop work order compliance, electrical work without a permit, work without a permit and a hearing date of November 9, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Stop Work Order complianceElectrical work without a permitWork without a permitPlumbing or gas work without a permit

Property and hearing summary

Actual property address
1721 East 2 Street, Brooklyn, NY 11223
Borough
Brooklyn
BIN
3175987
BBL
3066340061 (3/6634/61)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 9, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39186347K
Normalized: 039186347K
November 9, 2026
8:30 AM
CLASS - 1 Stop Work Order compliance
39186360P
Normalized: 039186360P
November 9, 2026
8:30 AM
CLASS - 1 Electrical work without a permit
39186361R
Normalized: 039186361R
November 9, 2026
8:30 AM
CLASS - 1 Work without a permit
39186369L
Normalized: 039186369L
November 9, 2026
8:30 AM
CLASS - 1 Plumbing or gas work without a permit

How the summonses fit together at this property

This property has 4 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. Several descriptions point to the same area (basement), which is a sign the summonses may be factually connected. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39186347K — Stop Work Order compliance

Normalized lookup key: 039186347K
OATH hearingNovember 9, 20268:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references rear yard, rear area, Stop Work Order and exposure 3.

Specific record details: rear yard, rear area, Stop Work Order, exposure 3. The description also references Stop Work Order SUGGESTS.

Full violation description from the source extract

A COMPARISON BETWEEN THE SITE PHOTOS AND THE STOP WORK ORDER SUGGESTS THAT WORK COUNITUINE WHILE ON STOP WORK NOTICE CONDITIONS CHANGED TO EXTERIOR OF PROPERTY AT EXPOSURE 3 IN REAR YARD., COMPLY WITH STOP WORK

Issue date
April 28, 2026
Served date
April 28, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning a comparison between the site photos and the stop work order suggests that work counituine while on stop work notice conditions changed to exterior of property at exposure 3 in rear yard., comply with stop work.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Violation 2

Summons 39186360P — Electrical work without a permit

Normalized lookup key: 039186360P
OATH hearingNovember 9, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references basement and electrical wiring/equipment.

Specific record details: basement, electrical wiring/equipment.

Full violation description from the source extract

ATOI OBSERVED BX ELECTRIC WIRES HANGING FROM CEILING AND WALLS IN BASEMENT OF PROPERTY AT 11:00 AM. NO ELECTRICAL PERMITS ON FILE WITH THE DEPARTMENT FOR SCOPE OF WORK TAKEN., OBTAIN PERMIT

Issue date
April 28, 2026
Served date
April 28, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed bx electric wires hanging from ceiling and walls in basement of property at 11:00 am. no electrical permits on file with the department for scope of work taken.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 3

Summons 39186361R — Work without a permit

Normalized lookup key: 039186361R
OATH hearingNovember 9, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references basement and partition walls.

Specific record details: basement, partition walls.

Full violation description from the source extract

ATOI OBSERVED NEWLY FRAMED/INSTALLED PARTITION WALLS BUILT IN INTERIOR OF BASEMENT. NO PERMITS ON FILE WITH THE DEPARTMENT FOR ALTERATION TAKING PLACE., OBTAIN PERMIT

Issue date
April 28, 2026
Served date
April 28, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed newly framed/installed partition walls built in interior of basement. no permits on file with the department for alteration taking place.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 4

Summons 39186369L — Plumbing or gas work without a permit

Normalized lookup key: 039186369L
OATH hearingNovember 9, 20268:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references bathroom fixtures and plumbing lines/fixtures.

Specific record details: bathroom fixtures, plumbing lines/fixtures.

Full violation description from the source extract

ATOI OBSERVED PLUMBING ALTERATION TAKING PLACE CREATING BATHROOM/ WASHER AND DRYER SET UP ON SECOUND FLOOR. NO PERMITS ON FILE WITH THE DEPARTMENT FOR SCOPE OF WORK., OBTAIN PERMIT

Issue date
April 28, 2026
Served date
April 28, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed plumbing alteration taking place creating bathroom/ washer and dryer set up on secound floor. no permits on file with the department for scope of work.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Property-specific resolution support

How Building Violation LLC may help at 1721 East 2 Street, Brooklyn, NY 11223

For 1721 East 2 Street, Brooklyn, NY 11223, the current source extract points to stop work order compliance, electrical work without a permit, work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.