November 2026 NYC DOB / ECB / OATH public-record review

182-186 Eagle Street, Brooklyn, NY 11222 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 3 DOB/ECB OATH summonses with 182-186 Eagle Street, Brooklyn, NY 11222. The source records identify electrical work without a permit, failure to maintain, work without a permit and a hearing date of November 25, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Electrical work without a permitFailure to maintainWork without a permit

Property and hearing summary

Actual property address
182-186 Eagle Street, Brooklyn, NY 11222
Borough
Brooklyn
BIN
3389270
BBL
3025050025 (3/2505/25)
Hearing month
November 2026
Violations on this page
3
Verified hearing date(s) in source extract
November 25, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39203752X
Normalized: 039203752X
November 25, 2026
9:30 AM
CLASS - 1 Electrical work without a permit
39203753H
Normalized: 039203753H
November 25, 2026
10:30 AM
CLASS - 1 Failure to maintain
39203754J
Normalized: 039203754J
November 25, 2026
8:30 AM
CLASS - 1 Work without a permit

How the summonses fit together at this property

This property has 3 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39203752X — Electrical work without a permit

Normalized lookup key: 039203752X
OATH hearingNovember 25, 20269:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references electrical wiring/equipment and lighting/illumination.

Specific record details: electrical wiring/equipment, lighting/illumination.

Full violation description from the source extract

ATOI OBSERVED IN THE FIRST FLOOR LEVEL OF THE PROPERTY ELECTRICAL WORK WITH OUT A PERMIT CONSISTING OF THE INSTALLATION OF NEW ELECTRICAL LIGHTING FIXTURES, SWITCHES AND EXPOSED WIRING PROTRUDING FROM THE NEWLY

Issue date
September 10, 2026
Served date
September 11, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed in the first floor level of the property electrical work with out a permit consisting of the installation of new electrical lighting fixtures, switches and exposed wiring protruding from the newly.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 2

Summons 39203753H — Failure to maintain

Normalized lookup key: 039203753H
OATH hearingNovember 25, 202610:30 AM

What DOB alleges

DOB alleges failure to maintain the cited building component or condition in a code-compliant manner.

Record context: source category Construction, severity CLASS - 1, issued September 10, 2026.

Full violation description from the source extract

ATOI OBSERVED IN THE FIRST FLOOR OF THE PROPERTY BEYOND THE LOBBY FOR THE LEFTMOST PANIC DOOR WITH ONLY ONE WAY TO OPEN INTO THE HALLWAY RESULTING IN A FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: WIT

Issue date
September 10, 2026
Served date
September 11, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 126 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed in the first floor of the property beyond the lobby for the leftmost panic door with only one way to open into the hallway resulting in a failure to maintain building in code-compliant manner: wit.

What this violation means

DOB is alleging failure to maintain the building or a building component in a code-compliant condition. The broad label matters less than the particular defect described by the inspector.

What may be required to correct the condition

The cited component should be inspected and repaired by the appropriate qualified contractor or licensed/registered professional where the work requires it. Permits or filings may be needed if the repair goes beyond ordinary maintenance.

What the OATH hearing may involve

The strongest factual material usually concerns the exact condition on the inspection date: photographs, maintenance records, professional reports, repair invoices and proof of correction.

Possible defenses or factual issues worth investigating

Focus on the precise component and location in the description, whether the defect existed as alleged, whether the owner/respondent controlled that area, and whether later inspection or repair records clarify the condition.

Documents and evidence that may be useful

  • dated photographs
  • maintenance and repair records
  • contractor or professional reports
  • permits/inspection records if repair work required them
  • proof of correction
Violation 3

Summons 39203754J — Work without a permit

Normalized lookup key: 039203754J
OATH hearingNovember 25, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references partition walls.

Specific record details: partition walls.

Full violation description from the source extract

ATOI OBSERVED UNPERMITTED GENERAL CONSTRUCTION CONSISTING OF INTERIOR CONSTRUCTION AND ALTERATION INCLUDING NEW PARTITIONS CONSTRUCTED USING METAL FRAMING STUDS AND THE ALTERATION OF THE EXISTING INTERIOR LAYOU

Issue date
September 10, 2026
Served date
September 11, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi observed unpermitted general construction consisting of interior construction and alteration including new partitions constructed using metal framing studs and the alteration of the existing interior layou.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Property-specific resolution support

How Building Violation LLC may help at 182-186 Eagle Street, Brooklyn, NY 11222

For 182-186 Eagle Street, Brooklyn, NY 11222, the current source extract points to electrical work without a permit, failure to maintain, work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.