November 2026 NYC DOB / ECB / OATH public-record review

1936 60 Street, Brooklyn, NY 11204 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 1936 60 Street, Brooklyn, NY 11204. The source records identify electrical work without a permit, construction housekeeping / debris, work without a permit and a hearing date of November 10, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Electrical work without a permitConstruction housekeeping / debrisWork without a permitPlumbing or gas work without a permit

Property and hearing summary

Actual property address
1936 60 Street, Brooklyn, NY 11204
Borough
Brooklyn
BIN
3132209
BBL
3055200019 (3/5520/19)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 10, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39194940L
Normalized: 039194940L
November 10, 2026
8:30 AM
CLASS - 1 Electrical work without a permit
39194941N
Normalized: 039194941N
November 10, 2026
8:30 AM
CLASS - 1 Construction housekeeping / debris
39194942P
Normalized: 039194942P
November 10, 2026
8:30 AM
CLASS - 1 Work without a permit
39194943R
Normalized: 039194943R
November 10, 2026
8:30 AM
CLASS - 1 Plumbing or gas work without a permit

How the summonses fit together at this property

This property has 4 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39194940L — Electrical work without a permit

Normalized lookup key: 039194940L
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references second floor, electrical wiring/equipment and lighting/illumination.

Specific record details: second floor, electrical wiring/equipment, lighting/illumination. The description also references Stop Work Order ISSUED.

Full violation description from the source extract

WORK WITHOUT PERMIT. FSWO ISSUED FOR ALL ELECTRICAL WORK BEING DONE ON THE INTERIOR OF THE RESIDENT. ATOI OBSERVED AT 2 PM IN INTERIOR AT THE 1ST AND 2ND FLOOR LEVEL NEWLY INSTALLED CEILING LIGHTING BX WIRING A

Issue date
July 6, 2026
Served date
July 6, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work without permit. fswo issued for all electrical work being done on the interior of the resident. atoi observed at 2 pm in interior at the 1st and 2nd floor level newly installed ceiling lighting bx wiring a.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 2

Summons 39194941N — Construction housekeeping / debris

Normalized lookup key: 039194941N
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges a debris or site-housekeeping condition. The inspector's description specifically references debris/housekeeping.

Specific record details: debris/housekeeping.

Full violation description from the source extract

NOTED: VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER DUE TO EXCESSIVE DEBRIS. ATOI OBSERVED AN EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS PILED UP IN THE RESIDENTS BASEMENT1 OF THE RES

Issue date
July 6, 2026
Served date
July 6, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning violation issued for failure to maintain building in code compliant manner due to excessive debris. atoi observed an excessive amount of construction debris piled up in the residents basement1 of the res.

What this violation means

The summons concerns debris, rubbish or construction housekeeping that DOB says created a code or safety problem at the site.

What may be required to correct the condition

Remove the cited debris/obstruction, restore safe housekeeping and confirm that storage/disposal practices meet the applicable site-safety rules. If the debris is tied to active construction, contractor/site-safety procedures may need to be adjusted.

What the OATH hearing may involve

Photographs, site logs, hauling/disposal records and evidence showing when the condition was corrected can be useful, especially where the issue was temporary.

Possible defenses or factual issues worth investigating

Confirm the exact location, amount/type of material, whether it obstructed access or created another hazard, and how quickly it was removed.

Documents and evidence that may be useful

  • dated photographs
  • site-safety or housekeeping logs
  • hauling/disposal receipts
  • contractor records
  • proof of correction
Violation 3

Summons 39194942P — Work without a permit

Normalized lookup key: 039194942P
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references first floor.

Specific record details: first floor. The description also references Stop Work Order WAS.

Full violation description from the source extract

WORK WITHOUT PERMIT: FSWO WAS ISSUED FOR ALL GENERAL CONSTRUCTION, CARPENTRY DEMLITION AND STRUCTURAL WORK. ATOI OBSERVED IN THE INTERIOR AT THE 1ST FLOOR LEVEL LEVEL FULL GUT REMOVAL OF ALL FIRE STOPPING ON TH

Issue date
July 6, 2026
Served date
July 6, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work without permit: fswo was issued for all general construction, carpentry demlition and structural work. atoi observed in the interior at the 1st floor level level full gut removal of all fire stopping on th.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 4

Summons 39194943R — Plumbing or gas work without a permit

Normalized lookup key: 039194943R
OATH hearingNovember 10, 20268:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references bathroom fixtures and plumbing lines/fixtures.

Specific record details: bathroom fixtures, plumbing lines/fixtures. The description also references Stop Work Order ISSUED.

Full violation description from the source extract

WORK WITHOUT PERMIT: FSWO ISSUED FOR ALL PLUMBING WORK BEING DONE IN THE INTERIOR OF THE RESIDENT. ATOI OBSERVED AT THE FRIST FLOOR LEVEL NEWLY INSTALLED COOPER AND CAST IRON PIPING IN THE BATHROOMS ALONG THE W

Issue date
July 6, 2026
Served date
July 6, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work without permit: fswo issued for all plumbing work being done in the interior of the resident. atoi observed at the frist floor level newly installed cooper and cast iron piping in the bathrooms along the w.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Property-specific resolution support

How Building Violation LLC may help at 1936 60 Street, Brooklyn, NY 11204

For 1936 60 Street, Brooklyn, NY 11204, the current source extract points to electrical work without a permit, construction housekeeping / debris, work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.