November 2026 NYC DOB / ECB / OATH public-record review

206 33 Street, Brooklyn, NY 11232 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 8 DOB/ECB OATH summonses with 206 33 Street, Brooklyn, NY 11232. The source records identify failure to maintain, occupancy / illegal conversion, plumbing or gas work without a permit and hearing dates on November 2, 2026 and November 9, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Failure to maintainOccupancy / illegal conversionPlumbing or gas work without a permitWork without a permit

Property and hearing summary

Actual property address
206 33 Street, Brooklyn, NY 11232
Borough
Brooklyn
BIN
3010190
BBL
3006850025 (3/685/25)
Hearing month
November 2026
Violations on this page
8
Verified hearing date(s) in source extract
November 2, 2026, November 9, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39175956M
Normalized: 039175956M
November 2, 2026
8:30 AM
CLASS - 1 Failure to maintain
39175957Y
Normalized: 039175957Y
November 2, 2026
8:30 AM
CLASS - 1 Occupancy / illegal conversion
39175958X
Normalized: 039175958X
November 2, 2026
8:30 AM
CLASS - 1 Plumbing or gas work without a permit
39175959H
Normalized: 039175959H
November 2, 2026
8:30 AM
CLASS - 1 Work without a permit
39175960P
Normalized: 039175960P
November 2, 2026
8:30 AM
CLASS - 1 Boiler compliance
39175961R
Normalized: 039175961R
November 2, 2026
8:30 AM
CLASS - 1 Electrical work without a permit
39171131J
Normalized: 039171131J
November 9, 2026
8:30 AM
CLASS - 1 Fire-safety condition
39171132L
Normalized: 039171132L
November 9, 2026
8:30 AM
CLASS - 1 Failure to maintain

How the summonses fit together at this property

The summonses appear to describe different enforcement components of a broader alteration/occupancy issue: the record includes an occupancy or conversion allegation together with unpermitted construction or trade work. Several descriptions point to the same area (cellar), which is a sign the summonses may be factually connected. A coordinated review should compare the legal occupancy, plans and permit history before deciding whether restoration or legalization is practical, while keeping each summons's hearing date and evidence separate.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39175956M — Failure to maintain

Normalized lookup key: 039175956M
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges failure to maintain the cited building component or condition in a code-compliant manner. The inspector's description specifically references cellar.

Specific record details: cellar.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE. AT TIME OF INSPECTION OBSERVED IMPROPER LOCKING DEVICES AT CELLAR ENTRY DOORS INTERIOR AND EXTERIOR SLIDE LOCKS AND

Issue date
February 3, 2026
Served date
February 4, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 126 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED IMPROPER LOCKING DEVICES AT CELLAR ENTRY DOORS INTERIOR AND EXTERIOR SLIDE LOCKS AND.

What this violation means

DOB is alleging failure to maintain the building or a building component in a code-compliant condition. The broad label matters less than the particular defect described by the inspector.

What may be required to correct the condition

The cited component should be inspected and repaired by the appropriate qualified contractor or licensed/registered professional where the work requires it. Permits or filings may be needed if the repair goes beyond ordinary maintenance.

What the OATH hearing may involve

The strongest factual material usually concerns the exact condition on the inspection date: photographs, maintenance records, professional reports, repair invoices and proof of correction.

Possible defenses or factual issues worth investigating

Focus on the precise component and location in the description, whether the defect existed as alleged, whether the owner/respondent controlled that area, and whether later inspection or repair records clarify the condition.

Documents and evidence that may be useful

  • dated photographs
  • maintenance and repair records
  • contractor or professional reports
  • permits/inspection records if repair work required them
  • proof of correction
Violation 2

Summons 39175957Y — Occupancy / illegal conversion

Normalized lookup key: 039175957Y
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges that the property's observed use or dwelling configuration did not match the legal occupancy shown in the cited DOB record. The inspector's description specifically references cellar, kitchen, stove, Class A residential occupancy and Certificate of Occupancy / legal-use record.

Specific record details: cellar, kitchen, stove, Class A residential occupancy, Certificate of Occupancy / legal-use record.

Full violation description from the source extract

OCCUPANCY CONTRARY TO CERTIFICATE OF OCCUPANCY OR BUILDING RECORDS. AT TIME OF INSPECTION, OBSERVED OCCUPIED CLASS A APARTMENT IN CELLAR ARRANGED AS A STUDIO UNIT , GAS STOVE RESIDENTIAL SINK KITCHEN, & 3PCS BA

Issue date
February 3, 2026
Served date
February 4, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED OCCUPIED CLASS A APARTMENT IN CELLAR ARRANGED AS A STUDIO UNIT , GAS STOVE RESIDENTIAL SINK KITCHEN, & 3PCS BA.

What this violation means

This type of summons concerns use or occupancy that DOB says is inconsistent with the approved Certificate of Occupancy or other legal-use record. The central question is not just what rooms exist, but whether the present dwelling/use configuration is legally authorized.

What may be required to correct the condition

A practical correction review usually starts by comparing the current layout and use with the Certificate of Occupancy, approved plans, I-card/MDR or other historical records. Depending on what the records allow, the path may involve restoration to the approved use or a legalization filing if zoning, egress, fire-safety and building-code requirements can be met. The legal-use record should be obtained before deciding whether the present configuration can remain.

What the OATH hearing may involve

For the OATH matter, useful questions include what legal-use record DOB relied on, what the inspector actually observed, whether the cited space was occupied as alleged on the inspection date, and whether photographs, leases, plans or historical records support or contradict the stated occupancy.

Possible defenses or factual issues worth investigating

Review the legal-use/occupancy history, the exact location cited, prior permits and alteration applications, and whether the source record accurately describes the number and type of dwelling units or the use of the cited space. Legalization should not be assumed until zoning and code feasibility are checked. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • Certificate of Occupancy or other legal-use record
  • approved plans and alteration applications
  • current photographs of the cited rooms/use
  • leases or occupancy records if relevant
  • prior permits, inspections and sign-offs
Violation 3

Summons 39175958X — Plumbing or gas work without a permit

Normalized lookup key: 039175958X
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references bathroom fixtures, kitchen, stove, plumbing lines/fixtures and Class A residential occupancy.

Specific record details: bathroom fixtures, kitchen, stove, plumbing lines/fixtures, Class A residential occupancy.

Full violation description from the source extract

WORK WITH OUT PERMIT PLUMBING . OBSERVED A 3 PIECE BATHROOM AND RESIDENTIAL KITCHEN WITH GAS STOVE. WORK DONE WITHOUT PERMIT IN CLASS A APARTMENT, OBTAIN PERMIT

Issue date
February 3, 2026
Served date
February 4, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning work with out permit plumbing . observed a 3 piece bathroom and residential kitchen with gas stove. work done without permit in class a apartment.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Violation 4

Summons 39175959H — Work without a permit

Normalized lookup key: 039175959H
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references cellar, partition walls and Class A residential occupancy.

Specific record details: cellar, partition walls, Class A residential occupancy.

Full violation description from the source extract

WORK WITHOUT PERMIT AT TIME OF INSPECTION OBSERVED A CLASS A APARTMENT IN CELLAR WITH NEW PARTITIONS AND DOORS NO PERMIT ON RECORD FOR SUCH WORK, OBTAIN PERMIT

Issue date
February 3, 2026
Served date
February 4, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED A CLASS A APARTMENT IN CELLAR WITH NEW PARTITIONS AND DOORS NO PERMIT ON RECORD FOR SUCH WORK.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 5

Summons 39175960P — Boiler compliance

Normalized lookup key: 039175960P
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges a boiler equipment or compliance condition. The inspector's description specifically references boiler room.

Specific record details: boiler room.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN A COLDE COMPLIANT MANNER AT TIME OF INSPECTION OVERSERVED INADEQUATE FIRE STOPPING IN THE BOILER ROOM AND METER ROOM DEFECTIVE SHEETROCK ON THE CEILING, REPAIR AND/REPLACE

Issue date
February 3, 2026
Served date
February 4, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OVERSERVED INADEQUATE FIRE STOPPING IN THE BOILER ROOM AND METER ROOM DEFECTIVE SHEETROCK ON THE CEILING, REPAIR AND/REPLACE.

What this violation means

This summons concerns boiler equipment, inspection/filing obligations or another boiler-safety requirement. The correct path depends on whether the issue is a physical equipment condition, a missed compliance filing, an unregistered device or a permit-related problem.

What may be required to correct the condition

Verify the boiler/device record and the exact compliance obligation. A qualified boiler professional may need to inspect or repair the equipment, complete the required DOB NOW: Safety filing, address civil penalties, or correct device/permit records before the violation can be resolved.

What the OATH hearing may involve

Useful hearing records may include the boiler inspection filing history, device status, repair records, proof of timely filing, and evidence showing whether the cited obligation applied during the relevant cycle.

Possible defenses or factual issues worth investigating

Determine whether the issue is physical, filing-based or registration/permit-based; verify the applicable cycle and device; and confirm any later accepted filing or correction.

Documents and evidence that may be useful

  • DOB NOW boiler/device record
  • inspection reports and accepted filings
  • repair/service documentation
  • permit or registration records
  • proof of correction/payment/waiver where applicable
Violation 6

Summons 39175961R — Electrical work without a permit

Normalized lookup key: 039175961R
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references cellar, electrical wiring/equipment and Class A residential occupancy.

Specific record details: cellar, electrical wiring/equipment, Class A residential occupancy.

Full violation description from the source extract

WORK WITH OUT A PERMIT ELECTRICAL AT TIME OF INSPECTION OBSERVED CELLAR CONVERTED INTO A CLASS A APARTMENT WITHOUT PERMITS, OBTAIN PERMIT

Issue date
February 3, 2026
Served date
February 4, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED CELLAR CONVERTED INTO A CLASS A APARTMENT WITHOUT PERMITS.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 7

Summons 39171131J — Fire-safety condition

Normalized lookup key: 039171131J
OATH hearingNovember 9, 20268:30 AM

What DOB alleges

DOB alleges a fire-safety or fire-hazard condition. The inspector's description specifically references front yard, front area, combustible materials, debris/housekeeping and exposure 1.

Specific record details: front yard, front area, combustible materials, debris/housekeeping, exposure 1.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLAINT MANNER. ATOI, OBSERVED EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS, GARBAGE AT FRONT YARD OF THE BUILDING EXPOSURE EXP1. COMBUSTIBLE MATERIALS (BOXES, PAPER, PLASTIC

Issue date
December 22, 2025
Served date
December 22, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to maintain building in a code-complaint manner. atoi, observed excessive amount of construction debris, garbage at front yard of the building exposure exp1. combustible materials (boxes, paper, plastic.

What this violation means

DOB is alleging a fire-safety or fire-hazard condition, such as combustible storage, a required fire-protection component, or another condition that could affect fire spread or safe operation of the building.

What may be required to correct the condition

The cited fire-hazard condition should be removed or corrected promptly. If the condition involves a building system or rated construction rather than simple housekeeping, the applicable approved plans, fire-protection requirements and licensed-professional/trade work should be reviewed.

What the OATH hearing may involve

Hearing evidence may include photographs from the inspection date, proof of removal/repair, fire-protection plans or system records, and documentation showing who controlled the cited area.

Possible defenses or factual issues worth investigating

Verify the specific hazard, location, whether it was present as described, whether it was transient storage or a permanent condition, and whether any building-system repair or permit was required. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • dated photographs
  • fire-protection/system records where relevant
  • repair/removal invoices
  • approved plans if rated construction or equipment is involved
  • proof of correction
Violation 8

Summons 39171132L — Failure to maintain

Normalized lookup key: 039171132L
OATH hearingNovember 9, 20268:30 AM

What DOB alleges

DOB alleges failure to maintain the cited building component or condition in a code-compliant manner. The inspector's description specifically references cellar.

Specific record details: cellar.

Full violation description from the source extract

FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. AT TIME OF INSPECTION, OBSERVED IN THE CELLAR VARIOUS LARGE OPENING/GAPS ON THE C

Issue date
December 22, 2025
Served date
December 22, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 139 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPIN

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED IN THE CELLAR VARIOUS LARGE OPENING/GAPS ON THE C.

What this violation means

DOB is alleging failure to maintain the building or a building component in a code-compliant condition. The broad label matters less than the particular defect described by the inspector.

What may be required to correct the condition

The cited component should be inspected and repaired by the appropriate qualified contractor or licensed/registered professional where the work requires it. Permits or filings may be needed if the repair goes beyond ordinary maintenance.

What the OATH hearing may involve

The strongest factual material usually concerns the exact condition on the inspection date: photographs, maintenance records, professional reports, repair invoices and proof of correction.

Possible defenses or factual issues worth investigating

Focus on the precise component and location in the description, whether the defect existed as alleged, whether the owner/respondent controlled that area, and whether later inspection or repair records clarify the condition.

Documents and evidence that may be useful

  • dated photographs
  • maintenance and repair records
  • contractor or professional reports
  • permits/inspection records if repair work required them
  • proof of correction
Property-specific resolution support

How Building Violation LLC may help at 206 33 Street, Brooklyn, NY 11232

For 206 33 Street, Brooklyn, NY 11232, the current source extract points to failure to maintain, occupancy / illegal conversion, plumbing or gas work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.