Summons 39180204X — Stop Work Order compliance
Normalized lookup key: 039180204XWhat DOB alleges
DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references cellar, partition walls and electrical wiring/equipment.
Specific record details: cellar, partition walls, electrical wiring/equipment. The description also references Stop Work Order IN.
Full violation description from the source extract
ATOI NEW CONSTRUCTION WAS OBSERVED IN THE CELLAR LEVEL OF PROPERTY. NEW PARTITION WALLS ERECTED ENCLOSING PREVIOUSLY VISIBLE ELECTRICAL BOXES. SITE CURRENTLY UNDER PSWO IN RELATION TO VIO# 39170756P., COMPLY WI
- Issue date
- February 6, 2026
- Served date
- March 12, 2026
- Source violation type
- Construction
- Severity
- CLASS - 1
- Hearing status in source extract
- PENDING
- 112 — 28-207.2.2 UNLAWFULLY CONTINUED WORK WHILE NOTICE OF A STOP WORK ORDER
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning atoi new construction was observed in the cellar level of property. new partition walls erected enclosing previously visible electrical boxes. site currently under pswo in relation to vio# 39170756p., comply wi.
What this violation means
The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.
What may be required to correct the condition
Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization. Because electrical work is mentioned, any correction plan should separately verify whether licensed electrical work, filing or inspection is required.
What the OATH hearing may involve
Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.
Possible defenses or factual issues worth investigating
Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.
Documents and evidence that may be useful
- Stop Work Order and related DOB inspection records
- permits and approved plans
- site photographs and daily logs
- rescind/partial-rescind correspondence or approvals
- contractor and site-safety records