Summons 39182192R — Boiler compliance
Normalized lookup key: 039182192RWhat DOB alleges
DOB alleges a boiler equipment or compliance condition. The inspector's description specifically references Certificate of Correction.
Specific record details: Certificate of Correction.
Full violation description from the source extract
FOUND A HB SMITH STEAM BOILER WITH NO MANUFACTURERS LABEL/ CHIMNEY BASE HAS TO BE RESEALED/ CORRECT ALL VIOLATING CONDITIONS/ SUBMIT A CERTIFICATE OF CORRECTION
- Issue date
- March 27, 2026
- Served date
- March 27, 2026
- Source violation type
- Boilers
- Severity
- CLASS - 2
- Hearing status in source extract
- PENDING
- 254 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: SERVICE EQUIPME
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning found a hb smith steam boiler with no manufacturers label/ chimney base has to be resealed/ correct all violating conditions/ submit a certificate of correction.
What this violation means
This summons concerns boiler equipment, inspection/filing obligations or another boiler-safety requirement. The correct path depends on whether the issue is a physical equipment condition, a missed compliance filing, an unregistered device or a permit-related problem.
What may be required to correct the condition
Verify the boiler/device record and the exact compliance obligation. A qualified boiler professional may need to inspect or repair the equipment, complete the required DOB NOW: Safety filing, address civil penalties, or correct device/permit records before the violation can be resolved.
What the OATH hearing may involve
Useful hearing records may include the boiler inspection filing history, device status, repair records, proof of timely filing, and evidence showing whether the cited obligation applied during the relevant cycle.
Possible defenses or factual issues worth investigating
Determine whether the issue is physical, filing-based or registration/permit-based; verify the applicable cycle and device; and confirm any later accepted filing or correction.
Documents and evidence that may be useful
- DOB NOW boiler/device record
- inspection reports and accepted filings
- repair/service documentation
- permit or registration records
- proof of correction/payment/waiver where applicable