November 2026 NYC DOB / ECB / OATH public-record review

2184 Muliner Avenue, Bronx, NY 10462 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 2184 Muliner Avenue, Bronx, NY 10462. The source records identify egress / fire-escape obstruction, sidewalk shed / temporary construction protection and a hearing date of November 20, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Egress / fire-escape obstructionSidewalk shed / temporary construction protection

Property and hearing summary

Actual property address
2184 Muliner Avenue, Bronx, NY 10462
Borough
Bronx
BIN
2049490
BBL
2043240032 (2/4324/32)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 20, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558797M
Normalized: 039558797M
November 20, 2026
8:30 AM
CLASS - 1 Egress / fire-escape obstruction
39558798Y
Normalized: 039558798Y
November 20, 2026
9:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558797M — Egress / fire-escape obstruction

Normalized lookup key: 039558797M
OATH hearingNovember 20, 20268:30 AM

What DOB alleges

DOB alleges that a required exit, fire-escape or egress route was obstructed or otherwise noncompliant. The inspector's description specifically references rear yard, rear area, combustible materials, debris/housekeeping and exposure 3.

Specific record details: rear yard, rear area, combustible materials, debris/housekeeping, exposure 3.

Full violation description from the source extract

AT THE TIME OF INSPECTION I OBSERVED AT EXP3 REAR YARD, POOR HOUSEKEEPING THROUGHOUT YARD. CONSTRUCTION DEBRIS SCATTERED EVERYWHERE, STYROFOAM, STUCCO, COMBUSTIBLE MATERIALS ON INGRESS/EGRESS OF EXP3 IMMEDIATEL

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed AT EXP3 REAR YARD, POOR HOUSEKEEPING THROUGHOUT YARD. CONSTRUCTION DEBRIS SCATTERED EVERYWHERE, STYROFOAM, STUCCO, COMBUSTIBLE MATERIALS ON INGRESS/EGRESS OF EXP3 IMMEDIATEL.

What this violation means

DOB is alleging that required egress or a fire-escape route was obstructed or otherwise did not provide the required clear path. Egress conditions are life-safety issues and the exact route/location described matters.

What may be required to correct the condition

The cited path should be cleared or restored so required egress is unobstructed. If the issue involves construction, stairs, doors, fire escapes or layout rather than movable objects, professional review and permits may be needed before the condition can be considered corrected. Any correction should preserve the required egress route rather than simply moving the problem to another part of the exit system.

What the OATH hearing may involve

At OATH, photographs from the inspection date, floor/egress plans, evidence showing whether the obstruction existed, and proof of prompt correction can be relevant.

Possible defenses or factual issues worth investigating

Verify the exact egress route, whether the objects/condition actually reduced the required path, whether the cited area was a required exit component, and whether the condition had been corrected before or after service. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • dated photographs of the cited egress route
  • approved floor/egress plans where applicable
  • repair/removal records
  • inspection reports
  • proof of correction
Violation 2

Summons 39558798Y — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558798Y
OATH hearingNovember 20, 20269:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references exposure 1.

Specific record details: exposure 1.

Full violation description from the source extract

AT THE TIME OF INSPECTION, OBSERVED AT EXP1,AND3 UNSAFE SCAFFOLDING NOT IN COMPLIANCE WITH BC3314.1. MISSING TOE BOARDS, NOT TIED DOWN, NO GUARDRAILS AND NOT FULLY PLANKED. STOP ALL EXTERIOR WORK AND USE OF SUP

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the time of inspection, observed at exp1,and3 unsafe scaffolding not in compliance with bc3314.1. missing toe boards, not tied down, no guardrails and not fully planked. stop all exterior work and use of sup.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Property-specific resolution support

How Building Violation LLC may help at 2184 Muliner Avenue, Bronx, NY 10462

For 2184 Muliner Avenue, Bronx, NY 10462, the current source extract points to egress / fire-escape obstruction, sidewalk shed / temporary construction protection. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.