November 2026 NYC DOB / ECB / OATH public-record review

224-232 Clarkson Avenue, Brooklyn, NY 11226 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 6 DOB/ECB OATH summonses with 224-232 Clarkson Avenue, Brooklyn, NY 11226. The source records identify work without a permit, dob/oath code-compliance issue, work not conforming to approved documents and a hearing date of November 18, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Work without a permitDOB/OATH code-compliance issueWork not conforming to approved documentsConstruction-site safety

Property and hearing summary

Actual property address
224-232 Clarkson Avenue, Brooklyn, NY 11226
Borough
Brooklyn
BIN
3116265
BBL
3050660023 (3/5066/23)
Hearing month
November 2026
Violations on this page
6
Verified hearing date(s) in source extract
November 18, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39559034Z
Normalized: 039559034Z
November 18, 2026
9:30 AM
CLASS - 1 Work without a permit
39559044M
Normalized: 039559044M
November 18, 2026
10:30 AM
CLASS - 1 DOB/OATH code-compliance issue
39559045Y
Normalized: 039559045Y
November 18, 2026
8:30 AM
CLASS - 1 Work not conforming to approved documents
39559046X
Normalized: 039559046X
November 18, 2026
9:30 AM
CLASS - 1 Construction-site safety
39559047H
Normalized: 039559047H
November 18, 2026
10:30 AM
CLASS - 1 DOB/OATH code-compliance issue
39559129L
Normalized: 039559129L
November 18, 2026
10:30 AM
CLASS - 2 Construction-site safety

How the summonses fit together at this property

This property has 6 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39559034Z — Work without a permit

Normalized lookup key: 039559034Z
OATH hearingNovember 18, 20269:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit.

Record context: source category Construction, severity CLASS - 1, issued September 10, 2026.

Full violation description from the source extract

AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOD DECKING LEVEL, I OBSERVED WORKERS STRIPPING FLOORS AND INSTALLING REBARS. UPON REVIEW OF THE DEPARTMENT RECORD IT REVEL THAT THERE IS NO NEW BU

Issue date
September 10, 2026
Served date
September 10, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed WORKERS STRIPPING FLOORS AND INSTALLING REBARS. UPON REVIEW OF THE DEPARTMENT RECORD IT REVEL THAT THERE IS NO NEW BU.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 2

Summons 39559044M — DOB/OATH code-compliance issue

Normalized lookup key: 039559044M
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition. The inspector's description specifically references exposure 1.

Specific record details: exposure 1.

Full violation description from the source extract

BC3303.5.3 AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, I OBSERVED AT EXPOSURE #1, 2 CONCRETE WASHOUT BOX AT STREET AND CONCRETE RESIDUE FLOWING ALL THE WAY DOWN TO THE SEWE

Issue date
September 10, 2026
Served date
September 10, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed AT EXPOSURE #1, 2 CONCRETE WASHOUT BOX AT STREET AND CONCRETE RESIDUE FLOWING ALL THE WAY DOWN TO THE SEWE.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 3

Summons 39559045Y — Work not conforming to approved documents

Normalized lookup key: 039559045Y
OATH hearingNovember 18, 20268:30 AM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents.

Record context: source category Construction, severity CLASS - 1, issued September 10, 2026.

Full violation description from the source extract

AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, UPON REVIEW OF THE CONSTRUCTION SAFETY WAIVER IT REVEAL THAT THE CONSTRUCTION SAFETY MANAGER SHOULD REPORT WEEKLY TO DOB CONSTRU

Issue date
September 10, 2026
Served date
September 10, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the time of my inspection of a 10 story new building at 5 floor decking level, upon review of the construction safety waiver it reveal that the construction safety manager should report weekly to DOB constru.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Violation 4

Summons 39559046X — Construction-site safety

Normalized lookup key: 039559046X
OATH hearingNovember 18, 20269:30 AM

What DOB alleges

DOB alleges a construction-site safety or safeguarding deficiency.

Record context: source category Unknown, severity CLASS - 1, issued September 10, 2026.

Full violation description from the source extract

BC3301.1.2 AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, UPON REQUEST FOR FIRE SAFETY MANAGER NONE WAS PRESENTED OR AT JOBSITE, FAILURE TO PROVIDE AND MAINTAIN FIRE SAFETY MA

Issue date
September 10, 2026
Served date
September 10, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning bc3301.1.2 at the time of my inspection of a 10 story new building at 5 floor decking level, upon request for fire safety manager none was presented or at jobsite, failure to provide and maintain fire safety ma.

What this violation means

This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.

What may be required to correct the condition

The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction.

What the OATH hearing may involve

Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.

Possible defenses or factual issues worth investigating

Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records.

Documents and evidence that may be useful

  • site-safety plans and temporary-construction drawings
  • daily logs and inspection reports
  • dated photographs/video
  • permit and superintendent/site-safety records
  • proof of correction/reinspection
Violation 5

Summons 39559047H — DOB/OATH code-compliance issue

Normalized lookup key: 039559047H
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition. The inspector's description specifically references exposure 1.

Specific record details: exposure 1.

Full violation description from the source extract

BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, I OBSERVED ONE LARGE GENERATOR ON STREET AT EXPOSURE #1 THAT WAS NOT FULLY BARRICADED, FAILURE TO PROVIDE AND MAINTA

Issue date
September 10, 2026
Served date
September 10, 2026
Source violation type
Unknown
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 1P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed ONE LARGE GENERATOR ON STREET AT EXPOSURE #1 THAT WAS NOT FULLY BARRICADED, FAILURE TO PROVIDE AND MAINTA.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 6

Summons 39559129L — Construction-site safety

Normalized lookup key: 039559129L
OATH hearingNovember 18, 202610:30 AM

What DOB alleges

DOB alleges a construction-site safety or safeguarding deficiency.

Record context: source category Unknown, severity CLASS - 2, issued September 12, 2026.

Full violation description from the source extract

BC3303.3 WATCHPERSON 10 STORY NEW BUILDING, BUILDING APPROXIMATELY 8640 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WATCHP

Issue date
September 12, 2026
Served date
September 12, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2P7

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning bc3303.3 watchperson 10 story new building, building approximately 8640 square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to alert watchp.

What this violation means

This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.

What may be required to correct the condition

The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction.

What the OATH hearing may involve

Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.

Possible defenses or factual issues worth investigating

Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records.

Documents and evidence that may be useful

  • site-safety plans and temporary-construction drawings
  • daily logs and inspection reports
  • dated photographs/video
  • permit and superintendent/site-safety records
  • proof of correction/reinspection
Property-specific resolution support

How Building Violation LLC may help at 224-232 Clarkson Avenue, Brooklyn, NY 11226

For 224-232 Clarkson Avenue, Brooklyn, NY 11226, the current source extract points to work without a permit, dob/oath code-compliance issue, work not conforming to approved documents. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.