November 2026 NYC DOB / ECB / OATH public-record review

224-32 92 Road, Queens, NY 11428 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 2 DOB/ECB OATH summonses with 224-32 92 Road, Queens, NY 11428. The source records identify fire-safety condition, stop work order compliance and a hearing date of November 10, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Fire-safety conditionStop Work Order compliance

Property and hearing summary

Actual property address
224-32 92 Road, Queens, NY 11428
Borough
Queens
BIN
4230555
BBL
4107540019 (4/10754/19)
Hearing month
November 2026
Violations on this page
2
Verified hearing date(s) in source extract
November 10, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39202730K
Normalized: 039202730K
November 10, 2026
9:30 AM
CLASS - 3 Fire-safety condition
39202731M
Normalized: 039202731M
November 10, 2026
10:30 AM
CLASS - 1 Stop Work Order compliance

How the summonses fit together at this property

This property has 2 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39202730K — Fire-safety condition

Normalized lookup key: 039202730K
OATH hearingNovember 10, 20269:30 AM

What DOB alleges

DOB alleges a fire-safety or fire-hazard condition. The inspector's description specifically references rear yard, rear area, combustible materials and debris/housekeeping.

Specific record details: rear yard, rear area, combustible materials, debris/housekeeping.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED FAILURE TO MAINTAIN EXCESSIVE AMOUNT OF COMBUSTIBLE WOOD CONSTRUCTION DEBRIS, TRASH WHICH EXCESSED 10 CUBIT YARD OF TRASH PILES UP AT THE REAR YARD., REPAIR AND OR REPLACE

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 3
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 302 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED FAILURE TO MAINTAIN EXCESSIVE AMOUNT OF COMBUSTIBLE WOOD CONSTRUCTION DEBRIS, TRASH WHICH EXCESSED 10 CUBIT YARD OF TRASH PILES UP AT THE REAR YARD., REPAIR AND OR REPLACE.

What this violation means

DOB is alleging a fire-safety or fire-hazard condition, such as combustible storage, a required fire-protection component, or another condition that could affect fire spread or safe operation of the building.

What may be required to correct the condition

The cited fire-hazard condition should be removed or corrected promptly. If the condition involves a building system or rated construction rather than simple housekeeping, the applicable approved plans, fire-protection requirements and licensed-professional/trade work should be reviewed.

What the OATH hearing may involve

Hearing evidence may include photographs from the inspection date, proof of removal/repair, fire-protection plans or system records, and documentation showing who controlled the cited area.

Possible defenses or factual issues worth investigating

Verify the specific hazard, location, whether it was present as described, whether it was transient storage or a permanent condition, and whether any building-system repair or permit was required. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.

Documents and evidence that may be useful

  • dated photographs
  • fire-protection/system records where relevant
  • repair/removal invoices
  • approved plans if rated construction or equipment is involved
  • proof of correction
Violation 2

Summons 39202731M — Stop Work Order compliance

Normalized lookup key: 039202731M
OATH hearingNovember 10, 202610:30 AM

What DOB alleges

DOB alleges work or site activity occurred contrary to an active Stop Work Order or related restriction. The inspector's description specifically references partition walls and Stop Work Order.

Specific record details: partition walls, Stop Work Order. The description also references Stop Work Order ISSUED.

Full violation description from the source extract

PARTIAL STOP WORK ORDER ISSUED FOR GENERAL CONSTRUCTION ALL INTERIOR STRUCTURAL FRAMING WORK WITHOUT A PERMIT AT TIME OF INSPECTION OBSERVED ONGOING CONSTRUCTION MAJOR STRUCTURAL CHANGES WORK NEW PARTITION WALL

Issue date
September 1, 2026
Served date
September 1, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED ONGOING CONSTRUCTION MAJOR STRUCTURAL CHANGES WORK NEW PARTITION WALL.

What this violation means

The source record concerns work performed or conditions maintained while a Stop Work Order was in effect, or another violation tied directly to a Stop Work Order. Continuing regulated work under an active order can create separate enforcement exposure.

What may be required to correct the condition

Verify the Stop Work Order's scope and whether it remains active. The underlying reasons for the order may require correction, permits, amended plans, site-safety measures or inspections before DOB will consider rescission or limited work authorization.

What the OATH hearing may involve

Relevant hearing evidence can include the Stop Work Order itself, photographs of the work activity, permits and approvals in effect at the time, DOB inspection history, and any document showing the order had been lifted or modified.

Possible defenses or factual issues worth investigating

Review the exact order number, date, scope, affected work areas, authorized exceptions if any, and whether the activity described by the inspector actually occurred while the order was active. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • Stop Work Order and related DOB inspection records
  • permits and approved plans
  • site photographs and daily logs
  • rescind/partial-rescind correspondence or approvals
  • contractor and site-safety records
Property-specific resolution support

How Building Violation LLC may help at 224-32 92 Road, Queens, NY 11428

For 224-32 92 Road, Queens, NY 11428, the current source extract points to fire-safety condition, stop work order compliance. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.