Summons 39558471M — Construction fence / site protection
Normalized lookup key: 039558471MWhat DOB alleges
DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references rear yard, rear area and construction fence.
Specific record details: rear yard, rear area, construction fence.
Full violation description from the source extract
DURING MY INSPECTION OF A FULL DEMO, PERMIT# X01213948. I OBSERVED THAT THE REAR YARD JOBSITE FENCE WAS MISSING, WITH AN OPEN PIT AND UNCAPPED REBARS EXPOSED FACING UP AT THE REAR PROPERTY LINE. STOP ALL CONSTR
- Issue date
- August 27, 2026
- Served date
- August 27, 2026
- Source violation type
- Construction
- Severity
- CLASS - 2
- Hearing status in source extract
- PENDING
- 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning observed THAT THE REAR YARD JOBSITE FENCE WAS MISSING, WITH AN OPEN PIT AND UNCAPPED REBARS EXPOSED FACING UP AT THE REAR PROPERTY LINE. STOP ALL CONSTR.
What this violation means
The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.
What may be required to correct the condition
The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.
What the OATH hearing may involve
Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.
Possible defenses or factual issues worth investigating
Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented. Because the description identifies several physical components or locations, photographs and records should be matched to those specific details rather than submitted as general property evidence.
Documents and evidence that may be useful
- site-protection/construction-fence drawings
- dated photographs
- site-safety inspection logs
- contractor repair records
- reinspection records