November 2026 NYC DOB / ECB / OATH public-record review

232 Jefferson Avenue, Brooklyn, NY 11216 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 1 DOB/ECB OATH summons with 232 Jefferson Avenue, Brooklyn, NY 11216. The source records identify boiler compliance and a hearing date of November 24, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Boiler compliance

Property and hearing summary

Actual property address
232 Jefferson Avenue, Brooklyn, NY 11216
Borough
Brooklyn
BIN
3052291
BBL
3018330024 (3/1833/24)
Hearing month
November 2026
Violations on this page
1
Verified hearing date(s) in source extract
November 24, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
37036312Y
Normalized: 037036312Y
November 24, 2026
9:00 AM
CLASS - 2 Boiler compliance

How the summonses fit together at this property

This page contains one resolved summons for this property. Its source allegation concerns boiler compliance; the hearing and correction tracks should still be treated separately, because resolving the physical condition does not by itself prove the OATH/DOB record has been closed.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 37036312Y — Boiler compliance

Normalized lookup key: 037036312Y
OATH hearingNovember 24, 20269:00 AM

What DOB alleges

DOB alleges a boiler equipment or compliance condition.

Record context: source category Boilers, severity CLASS - 2, issued September 15, 2025.

Full violation description from the source extract

FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 30000938251Y0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO

Issue date
September 15, 2025
Served date
October 2, 2025
Source violation type
Boilers
Severity
CLASS - 2
Hearing status in source extract
DEFAULT
Certification status in source extract
NO COMPLIANCE RECORDED
Infraction / law references in source extract:
  • 265 — 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT.

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning failure to file required annual boiler inspection reports for low-pressure boiler 30000938251y0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo.

What this violation means

This summons concerns boiler equipment, inspection/filing obligations or another boiler-safety requirement. The correct path depends on whether the issue is a physical equipment condition, a missed compliance filing, an unregistered device or a permit-related problem.

What may be required to correct the condition

Verify the boiler/device record and the exact compliance obligation. A qualified boiler professional may need to inspect or repair the equipment, complete the required DOB NOW: Safety filing, address civil penalties, or correct device/permit records before the violation can be resolved.

What the OATH hearing may involve

Useful hearing records may include the boiler inspection filing history, device status, repair records, proof of timely filing, and evidence showing whether the cited obligation applied during the relevant cycle.

Possible defenses or factual issues worth investigating

Determine whether the issue is physical, filing-based or registration/permit-based; verify the applicable cycle and device; and confirm any later accepted filing or correction.

Documents and evidence that may be useful

  • DOB NOW boiler/device record
  • inspection reports and accepted filings
  • repair/service documentation
  • permit or registration records
  • proof of correction/payment/waiver where applicable
Property-specific resolution support

How Building Violation LLC may help at 232 Jefferson Avenue, Brooklyn, NY 11216

For 232 Jefferson Avenue, Brooklyn, NY 11216, the current source extract points to boiler compliance. The engagement can stay focused on this summons while also checking the underlying DOB record so the physical correction and agency closeout are not treated as the same step. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.