November 2026 NYC DOB / ECB / OATH public-record review

2354 60 Street, Brooklyn, NY 11204 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 4 DOB/ECB OATH summonses with 2354 60 Street, Brooklyn, NY 11204. The source records identify dob/oath code-compliance issue, work without a permit, electrical work without a permit and hearing dates on November 10, 2026 and November 2, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

DOB/OATH code-compliance issueWork without a permitElectrical work without a permitPlumbing or gas work without a permit

Property and hearing summary

Actual property address
2354 60 Street, Brooklyn, NY 11204
Borough
Brooklyn
BIN
3173458
BBL
3065820001 (3/6582/1)
Hearing month
November 2026
Violations on this page
4
Verified hearing date(s) in source extract
November 10, 2026, November 2, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39189476K
Normalized: 039189476K
November 2, 2026
8:30 AM
CLASS - 1 DOB/OATH code-compliance issue
39151726K
Normalized: 039151726K
November 10, 2026
10:30 AM
CLASS - 2 Work without a permit
39151727M
Normalized: 039151727M
November 10, 2026
10:30 AM
CLASS - 1 Electrical work without a permit
39151728Y
Normalized: 039151728Y
November 10, 2026
10:30 AM
CLASS - 2 Plumbing or gas work without a permit

How the summonses fit together at this property

This property has 4 separate summonses. Some can be coordinated as one property matter for research, correction planning and document gathering, but each summons remains tied to its own allegation and hearing information. The practical goal is to avoid solving only one piece of the property record while another summons or correction requirement remains open.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39189476K — DOB/OATH code-compliance issue

Normalized lookup key: 039189476K
OATH hearingNovember 2, 20268:30 AM

What DOB alleges

DOB alleges a dob/oath code-compliance issue condition.

The description also references prior summons 39151727M.

Full violation description from the source extract

UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39151727M., COMPLY WITH COMMISSIONER'S ORDER

Issue date
May 21, 2026
Served date
May 21, 2026
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning unlawful acts. failure to comply with commissioner's order for summons 39151727m., comply with commissioner's order.

What this violation means

This summons is a DOB/OATH code-compliance matter. The source description—not the category label alone—should control the factual review, because similarly classified summonses can involve very different physical conditions.

What may be required to correct the condition

Start by verifying the cited condition against the current site and DOB record, then identify the qualified contractor, licensed trade or registered design professional—if any—needed for correction, permits, inspection or closeout.

What the OATH hearing may involve

Hearing preparation should focus on the facts alleged, the condition on the inspection date, permit/approval history, responsibility for the cited area, and any reliable evidence of correction or contrary facts.

Possible defenses or factual issues worth investigating

Review the exact allegation, cited code section, location, permit/approval history and any later agency activity. Avoid assuming a defense or correction path before the current record is checked. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • the summons and current OATH status
  • dated photographs
  • relevant DOB permits/plans/violations
  • contracts, invoices or professional reports tied to the cited condition
  • proof of correction where available
Violation 2

Summons 39151726K — Work without a permit

Normalized lookup key: 039151726K
OATH hearingNovember 10, 202610:30 AM

What DOB alleges

DOB alleges that construction or alteration work was performed without the required permit. The inspector's description specifically references cellar and first floor.

Specific record details: cellar, first floor. The description also references Stop Work Order ISSUED.

Full violation description from the source extract

FSWO ISSUED FOR WW/OP. ATOI OBSERVED WORKERS PERFORMING CONSTRUCTION WORK ON 1ST FLR APT & CELLAR. BELCO STAIR TO CELLAR EXCAVATED & EXTENDED TO FULL SIZE STAIR. WORK APRX. 80% COMPLETE. NO PERMIT FOR THIS WORK

Issue date
June 20, 2025
Served date
June 23, 2025
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning fswo issued for ww/op. atoi observed workers performing construction work on 1st floor apt & cellar. belco stair to cellar excavated & extended to full size stair. work aprx. 80% complete. no permit for this work.

What this violation means

DOB is alleging that construction or alteration work occurred without the permit required for that scope. The key resolution question is whether the current condition can be legalized, is already covered by an existing approval, or must be restored/removed.

What may be required to correct the condition

Research the permit and approved-plan history before choosing a cure. If the work can legally remain, a registered architect or professional engineer may need to prepare or amend drawings and coordinate permits; licensed trades may be required for regulated work. If legalization is not viable, restoration to an approved condition may be the faster path.

What the OATH hearing may involve

Hearing preparation should focus on the actual scope observed, the permit record in effect on the inspection date, whether the cited work matches an approved filing, who was responsible for the work, and any photographs or records showing the condition before or after correction.

Possible defenses or factual issues worth investigating

Compare the inspector's description to the approved plans and permit scope, determine when the work was performed, and verify whether the work was exempt, previously approved, or later legalized. None of those possibilities should be assumed without records. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • DOB permit/application history
  • approved plans and amendments
  • photographs of the cited work
  • contracts, invoices and contractor records
  • proof of restoration/legalization and any inspection or sign-off records
Violation 3

Summons 39151727M — Electrical work without a permit

Normalized lookup key: 039151727M
OATH hearingNovember 10, 202610:30 AM

What DOB alleges

DOB alleges that electrical wiring or equipment was installed without the required electrical permit or approval. The inspector's description specifically references electrical wiring/equipment.

Specific record details: electrical wiring/equipment. The description also references Stop Work Order ISSUED.

Full violation description from the source extract

FSWO ISSUED FOR WW/OP. ATOI OBSERVED THE INSTALLATION OF NEW AC SPLIT UNIT WITH ITS ELECTRICAL CONNECTIONS, AND OTHER ELECTRICAL FIXTURES. WORK APRX. 80% COMPLETE. NO PERMIT FOR THIS WORK IN DOB RECORDS., OBTAI

Issue date
June 20, 2025
Served date
June 23, 2025
Source violation type
Construction
Severity
CLASS - 1
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning fswo issued for ww/op. atoi observed the installation of new ac split unit with its electrical connections, and other electrical fixtures. work aprx. 80% complete. no permit for this work in DOB records., obtai.

What this violation means

DOB is alleging that electrical work was installed without the required approval or permit. Electrical summonses often turn on both the physical wiring/equipment observed and whether a valid electrical filing or permit covered that scope.

What may be required to correct the condition

The permit history and current electrical condition should be checked first. If the wiring is to remain, a New York City licensed electrician may need to evaluate the work, obtain the appropriate electrical filing/permit where available, make any required corrections, and complete inspection or sign-off steps. If the work cannot remain, restoration/removal may be the alternative.

What the OATH hearing may involve

At OATH, evidence may include the electrical permit history, photographs showing the condition at the cited location, the scope of any existing permit, invoices or contractor records, and proof of correction if work was later legalized or removed.

Possible defenses or factual issues worth investigating

Confirm whether the cited wiring/equipment was actually new work, whether it fell within an existing electrical filing, whether the location and scope in the summons match the site, and whether subsequent permitted correction changes the evidentiary picture. Cross-reference the other order/summons number cited in the inspector narrative rather than reviewing this record in isolation.

Documents and evidence that may be useful

  • electrical permits/filings and inspection records
  • photographs of the cited wiring or equipment
  • licensed-electrician invoices or reports
  • approved construction plans if the electrical scope is part of a larger alteration
  • proof of correction and any Certificate of Correction submission
Violation 4

Summons 39151728Y — Plumbing or gas work without a permit

Normalized lookup key: 039151728Y
OATH hearingNovember 10, 202610:30 AM

What DOB alleges

DOB alleges that plumbing and/or gas work was installed without the required permit. The inspector's description specifically references plumbing lines/fixtures.

Specific record details: plumbing lines/fixtures.

Full violation description from the source extract

ECB NOV ISSUED FOR WW/OP. ATOI OBSERVED THE INSTALLATION OF NEW WATER HEATER & WASTE LINE CONNECTIONS. NO PERMIT FOR THIS WORK IN DOB RECORDS., OBTAIN ALL PERMITS

Issue date
June 20, 2025
Served date
June 23, 2025
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 201 — 28-105.1 WORK WITHOUT A PERMIT

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning ecb nov issued for ww/op. atoi observed the installation of new water heater & waste line connections. no permit for this work in DOB records.

What this violation means

This summons concerns plumbing and/or gas work that DOB says was installed without the required permit. The cited fixtures, water/waste piping or gas piping should be compared with the legal plans and permit history.

What may be required to correct the condition

Depending on the condition, a New York City licensed master plumber and, where design work is involved, a registered design professional may need to determine whether the installation can be legalized or must be removed/restored. Permits, pressure/testing requirements, inspections and closeout may apply.

What the OATH hearing may involve

For the hearing, records showing whether the plumbing/gas scope was permitted, when it was installed, who performed it, and whether the cited fixtures or lines existed as described can be important. Correction evidence does not automatically resolve every hearing issue, but it can be relevant.

Possible defenses or factual issues worth investigating

Check existing plumbing/gas permits, approved plans, the exact fixtures and piping described, and whether the cited work is part of a broader occupancy or conversion condition. If gas piping is involved, do not assume it can remain without licensed review.

Documents and evidence that may be useful

  • plumbing/gas permits and approved plans
  • licensed-plumber records, invoices or test documentation
  • photographs of the cited fixtures and piping
  • inspection/sign-off records
  • proof of correction and Certificate of Correction materials where applicable
Property-specific resolution support

How Building Violation LLC may help at 2354 60 Street, Brooklyn, NY 11204

For 2354 60 Street, Brooklyn, NY 11204, the current source extract points to dob/oath code-compliance issue, work without a permit, electrical work without a permit. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.

Official government starting points

Verify the current OATH / DOB record

The source extract is a point-in-time record. Hearing dates, hearing status, penalties, correction status, permits and later agency filings can change. Use the official NYC systems below before making a decision or appearing at a hearing.