Summons 39556715K — Construction fence / site protection
Normalized lookup key: 039556715KWhat DOB alleges
DOB alleges a defect or noncompliant condition involving the construction fence or site perimeter. The inspector's description specifically references construction fence.
Specific record details: construction fence.
Full violation description from the source extract
AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE WITH POORLY MAINTAIN CONSTRUCTION FENCE(BC 3307.7) @ EXP. 1 NOT FIRMLY ERECTED, BROKEN, PRUDING NAILS COMING OUT THE WOODEN STRUCTURE . THIS CAN LEAD TO SOMEONE
- Issue date
- July 16, 2026
- Served date
- July 16, 2026
- Source violation type
- Construction
- Severity
- CLASS - 2
- Hearing status in source extract
- PENDING
- 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the time of my inspection observed active site with poorly maintain construction fence(bc 3307.7) @ exp. 1 not firmly erected, broken, pruding nails coming out the wooden structure . this can lead to someone.
What this violation means
The summons concerns a construction or job-site fence that DOB says was missing, damaged, improperly configured, encroaching, or otherwise noncompliant.
What may be required to correct the condition
The fence should be brought into conformity with the applicable approved site-protection plan and code requirements. Depending on the condition, this may involve replacing panels, correcting alignment/height, restoring viewing panels, securing the fence or clearing pedestrian encroachment.
What the OATH hearing may involve
Relevant evidence includes site photographs, approved site-protection drawings, permit information, inspection logs and records showing when the fence was repaired.
Possible defenses or factual issues worth investigating
Confirm the exact exposure/location, the approved fence configuration, whether the cited defect existed at the time, and whether a later repair or changed site condition is documented.
Documents and evidence that may be useful
- site-protection/construction-fence drawings
- dated photographs
- site-safety inspection logs
- contractor repair records
- reinspection records