Summons 39541471L — Construction-site safety
Normalized lookup key: 039541471LWhat DOB alleges
DOB alleges a construction-site safety or safeguarding deficiency.
Record context: source category Construction, severity CLASS - 2, issued June 16, 2025.
Full violation description from the source extract
AT TIME OF INSPECTION OBSERVED OPEN SITE AND WORKER ON PROPERTY AS PER PRE-SHIFT SITE WAS ACTIVE TODAY. UPON REQUESTING SITE SAFETY PLAN TO CONSTRUCTION SUPER HE SAID THEY DO NOT HAVE ONE. AS PER BC 3301.7 THIS
- Issue date
- June 16, 2025
- Served date
- June 17, 2025
- Source violation type
- Construction
- Severity
- CLASS - 2
- Hearing status in source extract
- DEFAULT
- Certification status in source extract
- NO COMPLIANCE RECORDED
- 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED OPEN SITE AND WORKER ON PROPERTY AS PER PRE-SHIFT SITE WAS ACTIVE TODAY. UPON REQUESTING SITE SAFETY PLAN TO CONSTRUCTION SUPER HE SAID THEY DO NOT HAVE ONE. AS PER BC 3301.7 THIS.
What this violation means
This summons concerns construction-site safety, safeguarding or required temporary protections/documents. These cases are highly fact-specific because the cited condition usually relates to a particular phase of construction and location.
What may be required to correct the condition
The cited safety condition should be corrected immediately and checked against the approved site-safety/temporary-construction documents. Depending on the allegation, the responsible contractor, construction superintendent, site safety manager/coordinator, or design professional may need to document the correction.
What the OATH hearing may involve
Dated site photographs, approved safety drawings, logs, daily reports, permit status and records identifying the construction phase can be important at the hearing.
Possible defenses or factual issues worth investigating
Identify the exact construction operation, exposure/location, responsible permit/site-safety roles, and what approved protection was required at the time. Compare the inspector's description with contemporaneous site records.
Documents and evidence that may be useful
- site-safety plans and temporary-construction drawings
- daily logs and inspection reports
- dated photographs/video
- permit and superintendent/site-safety records
- proof of correction/reinspection