November 2026 NYC DOB / ECB / OATH public-record review

251-257 West 34 Street, Manhattan, NY 10001 — November 2026 NYC OATH Hearing & Violation Information

The resolved public-record dataset associates 5 DOB/ECB OATH summonses with 251-257 West 34 Street, Manhattan, NY 10001. The source records identify sidewalk shed / temporary construction protection, work not conforming to approved documents and a hearing date of November 12, 2026. The sections below keep the source allegations separate from explanatory analysis so an owner, buyer, realtor, attorney, lender, property manager or contractor can see what the record says, what still needs verification, and what a practical next review could involve.

Sidewalk shed / temporary construction protectionWork not conforming to approved documents

Property and hearing summary

Actual property address
251-257 West 34 Street, Manhattan, NY 10001
Borough
Manhattan
BIN
1014395
BBL
1007840012 (1/784/12)
Hearing month
November 2026
Violations on this page
5
Verified hearing date(s) in source extract
November 12, 2026
Source extract
September 18, 2026
Source information: This page was compiled from NYC DOB/ECB/OATH public-record information contained in the November 2026 resolved-property dataset and the associated DOB/ECB source extract dated September 18, 2026. Agency records may change after the source data was obtained. Hearing dates, status, penalties, correction status and agency records should be verified with NYC OATH and DOB before relying on this page.

November 2026 hearing summary

ECB/OATH summonsHearing date / timeSeverityRecord category
39558754M
Normalized: 039558754M
November 12, 2026
9:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558755Y
Normalized: 039558755Y
November 12, 2026
10:30 AM
CLASS - 2 Work not conforming to approved documents
39558756X
Normalized: 039558756X
November 12, 2026
8:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558757H
Normalized: 039558757H
November 12, 2026
9:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection
39558758J
Normalized: 039558758J
November 12, 2026
10:30 AM
CLASS - 2 Sidewalk shed / temporary construction protection

How the summonses fit together at this property

These summonses form a construction-site compliance cluster rather than a single generic violation. They address different safety, temporary-protection, approved-plan or work-control obligations at the same property. Site records should be organized by inspection date and cited condition so the correction and hearing response for one summons is not mistakenly used for another.

Violation-by-violation record and analysis

Each section first identifies what comes directly from the source extract, then separates general explanatory and strategic considerations that may require current-record research or professional review.

Violation 1

Summons 39558754M — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558754M
OATH hearingNovember 12, 20269:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection. The inspector's description specifically references exposure 1.

Specific record details: exposure 1.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED 4 ACTIVE SUSPENDED SCAFFOLDS AT EXPOSURE 1 AND 3. UPON REVIEWING ALTREX SUSPENDED SCAFFOLDS MANUFACTURES SPECIFICATIONS IT SHOWS THAT PLATFORMS 6 METER AND BELOW SHALL NOT HAVE CA

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2F6 — BC 3301.1.3 (2014 CODE) FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED 4 ACTIVE SUSPENDED SCAFFOLDS AT EXPOSURE 1 AND 3. UPON REVIEWING ALTREX SUSPENDED SCAFFOLDS MANUFACTURES SPECIFICATIONS IT SHOWS THAT PLATFORMS 6 METER AND BELOW SHALL NOT HAVE CA.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 2

Summons 39558755Y — Work not conforming to approved documents

Normalized lookup key: 039558755Y
OATH hearingNovember 12, 202610:30 AM

What DOB alleges

DOB alleges that field work did not conform to the approved construction documents.

Record context: source category Construction, severity CLASS - 2, issued September 3, 2026.

Full violation description from the source extract

UPON REVIEWING APPROVE PLANS NOTICE WORK NOT CONFORMING TO SETUP. DETAIL USE FOR DELTA OUTRIGGER BEAMS SHOWS CABLE TRUSS LABEL AS MAIN TENSION WIRE ROPE TO BE INSTALL. NONE OF THIS SETUPS HAVE TENSION WIRE INST

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning upon reviewing approve plans notice work not conforming to setup. detail use for delta outrigger beams shows cable truss label as main tension wire rope to be install. none of this setups have tension wire inst.

What this violation means

DOB is alleging that work in progress did not match the approved construction documents or amendments. Even permitted work can be cited if the field condition departs materially from the approved plan set.

What may be required to correct the condition

The field condition should be compared line-by-line with the approved plans. Depending on what is found, the project may need to be restored to the approved design or the plans may need to be amended and re-approved before the work continues or is signed off.

What the OATH hearing may involve

Hearing evidence can include the approved plan sheets in effect on the inspection date, revision history, photographs of the field condition, professional reports and proof that the discrepancy was corrected or formally amended.

Possible defenses or factual issues worth investigating

Identify the exact plan sheet/detail DOB says was violated, confirm which approved set controlled on the inspection date, and determine whether the field condition was temporary, incomplete, or actually inconsistent with the approval.

Documents and evidence that may be useful

  • DOB-approved construction documents and amendments
  • field photographs
  • architect/engineer field reports
  • permit and inspection history
  • revised approvals or restoration evidence
Violation 3

Summons 39558756X — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558756X
OATH hearingNovember 12, 20268:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection.

Record context: source category Construction, severity CLASS - 2, issued September 3, 2026.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED 4 ACTIVE SUSPENDED SCAFFOLDS. UPON INSPECTING SETUP OBSERVED A FRAMES INSTALLED SOME WITH WHEELS AND OTHERS WITH SCREW JACKS. I REQUEST TO SEE THE MANUFACTURE SPECS FOR THIS FRAME

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED 4 ACTIVE SUSPENDED SCAFFOLDS. UPON INSPECTING SETUP OBSERVED A FRAMES INSTALLED SOME WITH WHEELS AND OTHERS WITH SCREW JACKS. I REQUEST TO SEE THE MANUFACTURE SPECS FOR THIS FRAME.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 4

Summons 39558757H — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558757H
OATH hearingNovember 12, 20269:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection.

Record context: source category Construction, severity CLASS - 2, issued September 3, 2026.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED ACTIVE SUSPENDED SCAFFOLDS AT EXP. 1 AND 3. UPON REQUESTING RIGGING FOREMAN CARD TO DENNIS FERNANDO VIZUETE WHO INTRODUCE HIMSELF AS THE FOREMAN HE COULD NOT PRODUCE THE CARD. SC

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Construction
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 279 — AC 1RCNY-MISC,RS-MISC MISCELLANEOUS VIOLATIONS

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED ACTIVE SUSPENDED SCAFFOLDS AT EXP. 1 AND 3. UPON REQUESTING RIGGING FOREMAN CARD TO DENNIS FERNANDO VIZUETE WHO INTRODUCE HIMSELF AS THE FOREMAN HE COULD NOT PRODUCE THE CARD. SC.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Violation 5

Summons 39558758J — Sidewalk shed / temporary construction protection

Normalized lookup key: 039558758J
OATH hearingNovember 12, 202610:30 AM

What DOB alleges

DOB alleges a defect or code-compliance problem involving sidewalk-shed/scaffold protection.

Record context: source category Unknown, severity CLASS - 2, issued September 3, 2026.

Full violation description from the source extract

AT TIME OF INSPECTION OBSERVED 5 SUSPENDED SCAFFOLDS SETUPS AT EXP. 1 AND 3, 4 OF THEM ACTIVE. AS PER DOB RECORDS LAST NOTIFICATION WAS M01292613-I1 8739 CREATED ON 5-28-26 WHICH IS FOR THE REMOVAL OF SCAFFOLDS

Issue date
September 3, 2026
Served date
September 3, 2026
Source violation type
Unknown
Severity
CLASS - 2
Hearing status in source extract
PENDING
Infraction / law references in source extract:
  • 2J9 — 1 RCNY 3319-01(C)(5) EQUIPMENT USER FAILED TO MAKE THE PROPER NOTIFICATION TO THE DEPARTMEN

Record-specific focus: Before choosing a correction or hearing strategy, verify the source allegation concerning at the inspection OBSERVED 5 SUSPENDED SCAFFOLDS SETUPS AT EXP. 1 AND 3, 4 OF THEM ACTIVE. AS PER DOB RECORDS LAST NOTIFICATION WAS M01292613-I1 8739 CREATED ON 5-28-26 WHICH IS FOR THE REMOVAL OF SCAFFOLDS.

What this violation means

The allegation concerns a sidewalk shed, scaffold, overhead protection or related temporary construction protection that DOB says did not meet required safety or maintenance conditions.

What may be required to correct the condition

The cited shed/scaffold condition should be inspected against the approved temporary-construction documents and Chapter 33 requirements. Correction may involve immediate repair, lighting, edge protection, anchorage, dimensions, housekeeping or permit/document updates depending on the allegation.

What the OATH hearing may involve

At OATH, dated site photographs, the approved shed/scaffold drawings or permit, inspection logs, contractor records and proof of prompt correction can help establish what condition existed and how it was addressed.

Possible defenses or factual issues worth investigating

Match the inspector's cited location and component to the approved temporary-construction setup, determine whether the condition was transient or ongoing, and verify permit/status information for the protection system.

Documents and evidence that may be useful

  • sidewalk-shed/scaffold permit and approved drawings
  • site photographs from the inspection period
  • daily/site-safety inspection logs
  • contractor repair records
  • DOB inspection/reinspection records
Property-specific resolution support

How Building Violation LLC may help at 251-257 West 34 Street, Manhattan, NY 10001

For 251-257 West 34 Street, Manhattan, NY 10001, the current source extract points to sidewalk shed / temporary construction protection, work not conforming to approved documents. Because this property has multiple summonses, the practical advantage is coordinating record research, hearing preparation and correction work as one property matter while still tracking each summons separately. Building Violation LLC can scope the relevant record research, OATH hearing preparation/representation, permit or legal-use review, licensed-trade or registered-professional coordination, correction documentation and Certificate of Correction/closeout work where those steps actually apply. Detailed technical research and project work begin only after the applicable scope, authorization and payment are established.